MCU21/0110 - SRA application correspondence - Changed referral agency response—with conditions
2107-23530 SRA
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
7. 4. The development must provide a dedicated pedestrian pathway from the Prior to the
porte cochere to the hotel reception generally in accordance with the commencement
following: of use, and
Entry Link Level Plan, prepared by Marchese Partners, dated where on site, to
12/11/2021 9/02/2023, drawing number 20079 DA1.01, revision be maintained at
8 13; and all times
Site Plan, prepared by Marchese Partners, dated 12/11/2021 9/02/2023,
drawing number 20079 DA1.00, revision 9 13.
8. 5. (a) The development must provide a bus setdown facility as part of the (a) – (b)
porte cochere at the location shown as numbers 11 and 13 on the Prior to the
Entry Link Level Plan, prepared by Marchese Partners, dated commencement
12/11/2021 9/02/2023, drawing number 20079 DA1.01, revision 8 of use and to be
13. maintained at all
times
(b) The bus setdown facility required in part (a) of this condition must be
in accordance with the Disability Standards for Accessible Public (c)
Transport 2002 made under subsection 31(1) of the Disability Prior to the
Discrimination Act 1992 and include the following: commencement of
capacity for one (1) single unit rigid bus of 14.5m in length to use
traverse the porte cochere as well as provision for the parking of
one (1) single unit rigid bus of 14.5m within the porte cochere;
kerb modifications in accordance with Swept Path – 14.5, Coach,
prepared by Traffic Transport Plus, dated 01/02/22, Figure 2,
revision 1;
provision for the parking of one (1) mini-bus of 8m in length with
8x5 trailer within the porte cochere whilst another mini-bus with
trailer traverses the porte cochere in accordance with Swept
Path – Mini Bus With Trailer, prepared by Traffic Transport Plus,
dated 01/02/2022, Figure 5, revision 1;
lighting in accordance with AS/NZS 1158.3.1 – Lighting for
Roads and Public Spaces, Part 3.1: Pedestrian Area (Category
P) Lighting – Performance and Design Requirements; and
access and hardstand, and shelter with seats, for waiting and
boarding/alighting passengers.
RPEQ certification, with supporting documentation, must be provided to
the Program Delivery and Operations Unit, North Coast Region
([email protected]) within the Department of Transport
and Main Roads confirming that the development has been designed
and constructed in accordance with parts (a) and (b) of this condition.
9. 6. (a) The development must provide a dedicated passenger loading zone (a) - (b)
within the porte cochere at the location shown as number 11 on the Prior to the
Entry Link Level Plan, prepared by Marchese Partners, dated commencement of
12/11/2021 9/02/2023, drawing number 20079 DA1.01, revision 8 use and to be
13. maintained at all
times
(b) The passenger loading zone required in part (a) of this condition
must be designed and constructed to: (c)
(i) Be suitable for use by a taxi catering for people with Prior to the
disabilities in accordance with: commencement of
AS1428.1 - Design for access and mobility; use
AS2890.6 – Parking Facilities, Part 6: Off-street parking
for people with disabilities;
Chapter 7 – Taxi Facilities of the Public Transport
Infrastructure Manual 2015; and
State Assessment and Referral Agency Page 6 of 9
[OCR of page images]
2107-23530 SRA
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
LA.
8.5.
9. 6.
The development must provide a dedicated pedestrian pathway from the
porte cochere to the hotel reception generally in accordance with the
following:
e Entry Link Level Plan, prepared by Marchese Partners, dated
424442024 9/02/2023, drawing number 20079 DA1.01, revision
8 13; and
Site Plan, prepared by Marchese Partners, dated 42/44/2024 9/02/2023,
drawing number 20079 DA1.00, revision 9 13.
(a) The development must provide a bus setdown facility as part of the
porte cochere at the location shown as numbers 11 and 13 on the
Entry Link Level Plan, prepared by Marchese Partners, dated
42/44/2024 9/02/2023, drawing number 20079-DA1.01, revision 8
13.
The bus setdown facility required in part (a) of this condition must be
in accordance with the Disability Standards for Accessible Public
Transport 2002 made under subsection 31(1) of the Disability
Discrimination Act 1992 and include the following:
e capacity for one (1) single unit rigid bus of 14.5m in length to
traverse the porte cochere as well as provision for the parking of
one (1) single unit rigid bus of 14.5m within the porte cochere;
e kerb modifications in accordance with Swept Path — 14.5, Coach,
prepared by Traffic Transport Plus, dated 01/02/22, Figure 2,
revision 1;
e provision for the parking of one (1) mini-bus of 8m in length with
8x5 trailer within the porte cochere whilst another mini-bus with
trailer traverses the porte cochere in accordance with Swept
Path — Mini Bus With Trailer, prepared by Traffic Transport Plus,
dated 01/02/2022, Figure 5, revision 1;
e — lighting in accordance with AS/NZS 1158.3.1 — Lighting for
Roads and Public Spaces, Part 3.1: Pedestrian Area (Category
P) Lighting — Performance and Design Requirements; and
e access and hardstand, and shelter with seats, for waiting and
boarding/alighting passengers.
RPEQ certification, with supporting documentation, must be provided to
the Program Delivery and Operations Unit, North Coast Region
([email protected]) within the Department of Transport
and Main Roads confirming that the development has been designed
and constructed in accordance with parts (a) and (b) of this condition.
(a) The development must provide a dedicated passenger loading zone
within the porte cochere at the location shown as number 11 on the
Entry Link Level Plan, prepared by Marchese Partners, dated
42/44/2024 9/02/2023, drawing number 20079 DA1.01, revision 8
13.
(b) The passenger loading zone required in part (a) of this condition
must be designed and constructed to:
(i) Be suitable for use by a taxi catering for people with
disabilities in accordance with:
e AS1428.1 - Design for access and mobility;
e AS2890.6 — Parking Facilities, Part 6: Off-street parking
for people with disabilities;
e Chapter 7 — Taxi Facilities of the Public Transport
Infrastructure Manual 2015; and
State Assessment and Referral Agency
Prior to the
commencement
of use, and
where on site, to
be maintained at
all times
(a) - (b)
Prior to the
commencement
of use and to be
maintained at all
times
(c)
Prior to the
commencement of
use
(a) - (b)
Prior to the
commencement of
use and to be
maintained at all
times
(c)
Prior to the
commencement of
use
Page 6 of 9
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.