MCU21/0110 - SRA application correspondence - Changed referral agency response—with conditions
2107-23530 SRA
the Disability Standards for Accessible Public Transport
2002 - subsection 31(1) of the Disability Discrimination
Act 1992;
(ii) include lighting in accordance with AS/NZS 1158.3.1 –
Lighting for Roads and Public Spaces, Part 3.1: Pedestrian
Area (Category P) Lighting – Performance and Design
Requirements; and
(iii) provide access and hardstand, and shelter with seats, for
waiting and boarding/alighting passengers.
RPEQ certification, with supporting documentation, must be provided to
the Program Delivery and Operations Unit, North Coast Region
([email protected]) within the Department of Transport
and Main Roads confirming that the development has been designed
and constructed in accordance with parts (a) and (b) of this condition.
10. (a) A RPEQ certified Traffic Management Plan must be prepared and (a) & (b)
7. given to the Program Delivery and Operations Unit, North Coast Region Prior to the
(via [email protected]) within the Department of commencement of
Transport and Main Roads. use, and where on
site, to be
(b) The Traffic Management Plan must demonstrate how operation of the maintained at all
porte cochere will be monitored and managed to ensure safe movement times
of vehicle and pedestrians, in particular when a 14.5m coach is
traversing the porte cochere when other vehicles are utilising the same. (c) At all times
during operation.
(c) The operation of the development must be undertaken in accordance
with the Traffic Management Plan.
State Assessment and Referral Agency Page 7 of 9
[OCR of page images]
*8|
e the Disability Standards for Accessible Public Transport
2002 - subsection 31(1) of the Disability Discrimination
Act 1992;
(ii) include lighting in accordance with AS/NZS 1158.3.1 —
Lighting for Roads and Public Spaces, Part 3.1: Pedestrian
Area (Category P) Lighting — Performance and Design
Requirements; and
(iii) provide access and hardstand, and shelter with seats, for
waiting and boarding/alighting passengers.
RPEQ certification, with supporting documentation, must be provided to
the Program Delivery and Operations Unit, North Coast Region
([email protected]) within the Department of Transport
and Main Roads confirming that the development has been designed
and constructed in accordance with parts (a) and (b) of this condition.
(a) A RPEQ certified Traffic Management Plan must be prepared and
given to the Program Delivery and Operations Unit, North Coast Region
(via [email protected]) within the Department of
Transport and Main Roads.
(b) The Traffic Management Plan must demonstrate how operation of the
porte cochere will be monitored and managed to ensure safe movement
of vehicle and pedestrians, in particular when a 14.5m coach is
traversing the porte cochere when other vehicles are utilising the same.
(c) The operation of the development must be undertaken in accordance
with the Traffic Management Plan.
State Assessment and Referral Agency
2107-23530 SRA
(a) & (b)
Prior to the
commencement of
use, and where on
site, to be
maintained at all
times
(c) At all times
during operation.
Page 7 of 9
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.