                                   Form 6 - Decision Notice
                                   INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2007/528                             Date of Decision:    2 July 2007

1.     APPLICANT DETAILS

 Name:               Goode Family Trust

 Postal address:     CARE Bark Design Architects Pty Ltd
                     PO Box 1355
                     NOOSA HEADS QLD 4567
 Phone no:           5471 0340              Fax no:        5471 0343

2.     PROPERTY DESCRIPTION

 Street address:     56 Ferguson Street Sunshine Beach

 Real property       Lots 0,1, 2, 3 & 4 GTP 568
 description:

3.     OWNER DETAILS

 Name:               Body Corporate - Abroi Cts21924

 Postal address:     CARE Robert & Jill Goode
                     43 Cooran Court NOOSA HEADS QLD 4567

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                   Basis
 N/A

5.     APPLICATION TYPE

 Development                      Development Details                       Preliminary         Development
                                                                             Approval              Permit
 Operational Works                Operational Works - Landscaping,               No                 Yes
                                  Access & Carparking, Site Civil
                                  Works,     Stormwater    drainage,
                                  Frontage works and Earthworks

6.     DECISION DETAILS

Council decided to approve the application and grant a Development Permit, subject to conditions.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.

8.     SUBMISSIONS

Not Applicable.
Full text of the other 7 sections

Section 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                                 2 of 8

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Nil

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                              Date:      4 July 2007




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Section 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                       3 of 8




                                    Noosa Council Conditions
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION



Landscaping

1.    The site is to be landscaped in accordance with Council’s Landscaping Code and Planning Scheme
      Policy PSP3 on Landscaping Plants and Guidelines and the approved Landscaping Plans which are titled
      and numbered Landscape Planting Scheme – Whole Site Plan G.12 –BA.43A and Landscape Ground
      Cover – Whole Site Plan g.12 – BA.44A, prepared by Bark Design Architects dated May 2007 and may be
      amended by these conditions.

2.    The landscape construction is to be implemented in accordance with the amended landscape plan,
      planting schedule and horticultural industry best practices.

3.    All trees must be located a minimum of 1 metre from all services to prevent root/service conflict and to
      provide future ease of maintenance requirements

4.    All native plant species located in-group plantings shall not be subjected to any hedging maintenance
      regimes.

5.    All street trees and internal trees 45 litre and greater must be securely staked and tied to assist their
      growth during the establishment period.

6.    The density of planting must achieve the set out requirements as detailed on the approved landscape
      plan.

7.    All landscaping treatment shall not unduly restrict or prevent access to service meters within the site.

8.    All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
      be visible at all times to ensure prompt access in case of emergency.

9.    Pandandus tectorius var. pedunculatus species in the road reserve shall be sited a minimum of 2 metres
      from the edge of the footpath to ensure pedestrian safety.

10.   The Body Corporate of this development is responsible for the ongoing maintenance of landscaping within
      the road reserve.

11.   This Development Permit lapses if the development has not happened by 2 July 2009, unless application
      to extend the currency is approved by Council.

Land Development

12.   The development shall be carried out in accordance with Engineering drawings numbered and dated;
      06N498-C00A dated 1 March 2007, 06N498-C01A dated 1 March 2007, 06N498-C02B         dated 27 April
      2007, 06N498-C03B dated 27 April 2007, 06N498-C04A dated 15 March 2007, 06N498-C05A        dated
      15 March 2007 prepared by Qantec McWilliam and 1606-0-1 dated 26 April 2007 and 1606-0-2 dated 26
      April 2007 prepared by Construction Hydraulics or as modified herein.

13.   Roof and surface runoff connection to Council’s kerb and channel and drainage system shall be as shown
      on drawings Nos. 1606-0-1 & 1606-0-2. Kerb adaptors shall be used in the kerb.

14.   A Traffic Management Plan must be submitted to Council for approval prior to the commencement of
      works.

15.   A pram ramp shall be installed at the Bryan Street / Ferguson Street intersection. Advice should be sort
      from Council’s Construction Technical Officer for Council’s latest standard for pram ramps.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Section 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 8


16.   A footpath 1.5 metres wide shall be constructed across the Ferguson Street frontage of the development.
      The footpath shall have a slip resistant surface. The alignment, of which, shall be determined on site with
      Council’s Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut”
      not trowel jointed.

17.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
      first existing external downstream stormwater structure.

      These devices are to be checked and cleaned on a regular basis and specifically after each rain event.

      These devices are to remain in place during the civil works and construction phases of the development.

      The location and type of device to be installed shall be established at the “pre start” meeting with
      Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.

18.   Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.

19.   The principal contractor must have all the appropriate insurance and public liability documentation to carry
      out the works. The principal contractor is also responsible to ensure that any sub contractors also have
      the appropriate insurance and public liability documentation.

20.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
      signed approved drawings and conditions by the applicant.

21.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
      (This person will be the contact for the project).

22.   Council standards shall apply to these works unless otherwise modified herein.

23.   The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
      during the construction of the engineering works to ensure that Council property, road pavements or
      facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
      furniture etc.) are protected against any damage or interference whatsoever.

      If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
      Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
      engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
      Development and shall forthwith rectify the damage to that property or facility at its cost and to the
      satisfaction of the Manager Land Development.

      All rectification works are to be completed prior to the commencement of the use or, alternatively, the
      Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
      being paid by the Applicant to the Council prior to the commencement of the use.

      In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
      Applicant, such cost being paid prior to the commencement of the use.

      A management strategy to ensure no damage occurs to Council services shall be submitted to Council for
      assessment prior to the pre-start meeting.

24.   The development of the site shall be carried out in such a manner as to prevent dust and/or sand
      nuisance to residents and/or tenants in the vicinity of the development.

25.   Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
      pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
      hours are approved by the Manager-Land Development or his nominee.

26.   All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
      Traffic Control Devices and Traffic Infrastructure (Roads) Act.

27.   Safe pedestrian access on Bryan and Ferguson Streets shall be maintained at all times. Should footpath
      / road closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph
      0410 512 505) must be notified prior to the proposed closure.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Section 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                   5 of 8


28.   Sediment and erosion control measures must be in place prior to works commencing. If such measures
      are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
      sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
      natural waterways. Although the sediment and erosion control measures have been approved on drawing
      No. 06N498-C02B, Council’s Manager – Land Development may request further controls to be installed
      should approved measures be inefficient.

29.   All stormwater drainage lines including private drainage lines (also known as inter-allotment drainage
      lines) or as otherwise approved by Council’s Manager of Land Development shall be inspected by closed
      circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
      Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this inspection.

      A report of the CCTV inspection, including photographic records (which includes photos & video
      recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval. Any defects
      or substandard works shall be recorded and accurately illustrated on the drainage plan showing the
      location of the defect(s).

      Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants expense
      with a further CCTV inspection arranged once the rectification works have been completed.

      To this extent all CCTV inspections, including any additional inspections necessary following defect
      identification and rectification, shall be entirely at the applicant’s expense. Any costs incurred by Council
      in reviewing the CCTV inspection results shall also be borne by the applicant.

30.   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
      satisfactory “As Constructed” records shall be submitted to Council.

      As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
      design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
      services and structures. All of which shall be submitted to Council for checking and for Council’s records.

      The data must fully detail levels for all engineering works including but not limited to drainage structures,
      finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
      As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
      www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
      Drainage and Earthworks.
      Approval of works shall not be granted until all As Constructed information has been supplied and
      accepted by Council.
31.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
      on construction works during the maintenance period, which is a minimum period of 12 months duration.
      Such bond must be lodged by, and shall only be accepted from the Developer for the works.

32.   The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
      completed.

33.   These works are also to be in compliance with the relevant conditions of Development Permit No.
      2006/1155.

34.   Notwithstanding that Council has checked the plans with due care, where it is found during construction
      that variations from Council's standards exist, then Council standards shall apply




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Section 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                              6 of 8



                                    Local Laws, Policies & State
                                    Regulation Requirements
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      Should any changes or modifications to the approved plans be required as a result of construction
        constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be
        made. Amended plans clearly indicating the changes must be lodged with this application along with the
        appropriate fees.

2.      Council may be required to undertake works in the road reserve which may have an impact on
        landscaping.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Section 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           7 of 8



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Section 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                       8 of 8

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e808ce94\@[email protected]

Used in these records

About this file

File size
34 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015585E.001.pdf · 34 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.