Skip to the record
Accept no imitations.

Original source · versioned page text

Development Application part 2 of 2 Covering Letters & Plans - MCU13/0069

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (60.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Native Title Status


There is NO         application or determination or claim of Native Title over the Park.
Native title was extinguished due to prior works on the Park; namely major public
earthworks to reclaim the site due to the 1971 Hays Island Development and
                                                                                st
because the reserve was gazetted on 25th October 1975, by Order of Council on 1
November 1973 Attachment 2, which is prior to 1996.




Proposed Uses of the land

The Concept Plan for the Park is attached as Attachment 9.


The    proposed        uses         the concept plan use the existing low-key
                               contained       in
commercial outdoor dining as a way to further activate the Park. The outdoor dining
area  will "open" the Park and ensure that the space is open and accessible to the
public. The management and control over the impacts of the commercial activity will
be regulated through the trustee permits.


The proceeds of the permits will be used to develop the non-commercial aspects of
the Park, with a focus on Park improvements, Park activation with an aim of
preventing crime and supporting recreation. The concept plan shows that the
outdoor dining areas are integrated into the Park, ensuring a seamless area of public
open space rather than closed      private use.. Key principles of this activation are:
management, legibility, connectivity and permeability with a blur definition of public
and private space, maintaining the natural character, increasing public usage and
providing facilities and amenities to support the desired functionality of the ark.

The proposed        use   of the Park will blend with the natural attributes of the Park and
enhance the primary use of the Park by the community.


Once upgraded, the new design will encourage more couples to hold weddings there,
encourage locals to interact more freely and for families staying in the surrounding
holiday accommodation to use the park as part of their holiday experience.

The  Primary Use will continue to be that of a park providing primarily passive
recreation opportunities adjacent to the river. The Park will retain its current low-key,
natural appearance: that is, there will be a minimum of hard landscaping and formal
park features and furniture.

The Secondary Use proposed is for outdoor dining, which is an approved action by
the trustee and an inconsistent action with the purpose of the trust land under section
52(3) of the Land Act 1994. It is the opinion of the trustee that the inconsistent action
will not diminish the purpose of the trust land, arid will not have an adverse
affect on any business in the area. The secondary use is generally in accordance
with existing Council policies for outdoor dining on footpaths, adjacent to the Quamby
Place centre businesses abutting the Park, in a strip approximately 5.0m wide.


That proposal for Secondary Use could, over time, accommodate additional outdoor
dining areas of up to approximately 30m2 each, representing a total of 9.65% of the



                                                        -7   -




 W:\SCC\FB\PBS\Business_ Tech\Projects 2011\Quamby Place2011\Trust land Mgmt Plan Folder for DERM\Draft Quamby Place-
                               Trust land Management Plan 2 May 2012 APPROVED.doc
                                                                      -
Log in to download the original file

Development Application part 2 of 2 Covering Letters & Plans - MCU13_0069.pdf · 60.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.