Original source · versioned page text
Attachment A - Rev Proposal plans - new automatic
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn DRAWINGS PRODUCED IN COLOUR CONSTRUCTION ISSUE
Cw
Cw
Pu Pu DW
V
Cw
Pu Pu Pu Pu Pu
DWV
Cw
DW
Pu
V
DWV
Cw
DWV DWV
Pu
DWV
DWV
Cw
DWV
Pu
DWV DWV DWV
DWV
DWV
Cw
Pu
DWV
DWV
DWV DWV DWV DWV DWV DWV DWV DWV
DWV
Cw
DWV
Pu
DWV
DWV
DWV
DWV
Cw
DWV
Pu
DWV
DWV
DWV
DWV
DWV
DWV
Cw
Pu
Cw Cw Cw Cw Cw
DWV
Cw Cw Cw Cw Cw
DWV
Cw Cw Cw Cw Cw
DWV
DWV
DWV
Cw Cw Cw Cw
Pu
DWV DWV
Cw
DWV
Cw
Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw
Cw
DWV
Cw
DWV
Cw
DWV
DWV
DWV
Pu
DWV DWV DWV DWV
Cw
Cw
PLANT
DWV
Cw
Cw
Cw
Cw
DWV
Cw
Cw
ROOM
Cw
DWV
Pu
DWV
DWV
GF1
Cw
Cw
Cw
Cw
Cw
Cw
DWV
Cw
Cw
DWV
Cw
DWV
Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw Cw
DWV
DWV
Cw
Cw
DWV
DWV
Cw
Cw
Cw
Cw
Cw
Cw
Cw
DWV
Cw
DWV
Cw
Cw
DWV
DWV
Cw
Cw
Cw
DWV
Cw Cw
DWV
DWV DWV
Cw
DWV
Cw
DWV
Cw
DWV
BAY AUTOMATIC BAY SELF SERVE BAY 1 SELF SERVE BAY 2 SELF SERVE BAY 3 DOGWASH AREA
BAY
VACUUM VACUUM GF2 GF3 GF4 GF5 GF6
GF7 GF8
HYDRAULIC NOTES:
FLOOR PENETRATIONS AND/OR PIPE LOCATIONS NOT SHOWING DIMENSIONS ARE TRADE WASTE RISERS SHALL BE IMPLEMENTED WHERE REQUIRED IN STRICT ACCORDANCE ALL EXTERNAL WATER TAPS SHALL BE TAMPERPROOF WITH KEY. LOCKABLE OPEN / CLOSE. SERVICES TERMINATED WITHIN UNDERGROUND TANKS SHALL BE ACCESSIBLE FROM MANHOLE
DISCRETIONARY. WITH CURRENT AUSTRALIAN STANDARDS AND / OR REGULATIONS. COVER FOR MAINTENANCE PURPOSES.
PIPE WORK IN GROUND SHALL BE PROVIDED WITH MARKING TAPE IN THE TRENCH INDICATING
PIPE WORK SHALL BE CARRIED OUT IN STRICT ACCORDANCE WITH CURRENT AUSTRALIAN INSPECTION OPENINGS SHALL BE PROVIDED ON STORM WATER & SEWER RISERS. THE SERVICE AND DIRECTION OF FLOW IN ACCORDANCE WITH AS 2648. ELBOWS AND / OR TEES USED IN CONJUNCTION
STANDARDS AND RELEVANT LOCAL CONSENT AUTHORITY'S RULES AND REGULATIONS. WITH SETTLEMENT TANKS SHALL BE ORIENTATED AS TO NOT DISTURB ANY SEDIMENT
ALL REDUNDANT SERVICES SHALL BE CAPPED AT THE AUTHORITY MAIN. ARRANGE INSPECTION HYDRAULIC DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECTURAL AND ENGINEERING COLLECTION.
SERVICES, PIPES, LOCATIONS, FITTINGS AND THE LIKE SHOWN ON THESE DRAWINGS ARE IN WITH THE AUTHORITY PRIOR TO BACK FILLING AND MAKING GOOD THE SURFACE. DRAWINGS.
CONJUNCTION WITH THE WASH EQUIPMENT ONLY. ALL OTHER SERVICES, FIXTURES, FITTINGS PLANT ROOM SERVICES REQUIRING DIRECT FIXTURE TO WASHTEC EQUIPMENT SHALL NOT BE
SHALL BE PROVIDED BY THE BUILDER / SUBCONTRACTOR AS NECESSARY. ALL PIPE PENETRATIONS AT WALLS SHALL BE FITTED WITH A PUDDLE FLANGE. ALL WALL ALL FIXINGS SHALL BE PLUMB, LEVEL AND NEATLY FINISHED IN A TRADESMAN LIKE MANNER INSTALLED UNTIL SUCH TIME AS THE ACCEPTABLE LAYOUT AND LOCATION OF ALL EQUIPMENT
AND WITHOUT DAMAGE. SUPPLIED BY WASHTEC HAS BEEN COMPLETED.
NO ALLOWANCES HAVE BEEN MADE FOR GRADE CLEANOUTS. PENETRATIONS SHALL BE MADE GOOD AND WATER TIGHT.
ON COMPLETION OF THE INSTALLATION, FIXTURES SHALL BE TESTED FOR NORMAL OPERATION ALL TUNDISH INSTALLATIONS SHALL BE FLUSH TO CLOSEST WALL UNLESS NOTED OTHERWISE.
ALL FIXTURES ARE TO BE SUPPLIED AND INSTALLED BY THE BUILDER / SUBCONTRACTOR THE BUILDER / SUBCONTRACTOR SHALL PROVIDE A CERTIFICATE OF COMPLIANCE UPON AND ADJUSTED AS NECESSARY.ALL MATERIALS AND LABOUR NECESSARY SHALL BE PROVIDED
UNLESS SPECIFIED OTHERWISE. COMPLETION OF WORKS FOR ALL SERVICES INSTALLED. TO COMPLETE A WORKING AND SERVICEABLE INSTALLATION BASED ON THE DRAWINGS, THE DESIGN AND PIPING SCHEDULE SHOWN ON THIS DRAWING ARE FOR REFERENCE
SPECIFICATION COORDINATION WITH THE STRUCTURE AND OTHER SERVICES PLUS ANY PURPOSES AND SHOULD ONLY BE USED FOR ESTIMATION. WASHTEC AUSTRALIA PTY LTD
PIPE WORK SHALL BE CAPPED OFF AS WORK PROCEEDS TO PREVENT INGRESS OF DIRT, EXPOSED PIPE WORK SHALL BE PAINTED AND LABELED WITH PIPE MARKERS IN ACCORDANCE RELEVANT AUSTRALIAN STANDARDS. SHALL NOT BE RESPONSIBLE OR LIABLE FOR FINAL DESIGN, MATERIALS USED, ADDITIONAL
CONCRETE ETC. USE PROPRIETARY CAPS / PLUGS. WITH AS 1345. MATERIALS AND/OR LABOUR COSTS REQUIRED BUT NOT SPECIFIED ON THIS DRAWING.
ALL UNDERGROUND COPPER PIPE WORK SHALL BE LAGGED ACCORDINGLY.
DIMENSIONS SHOWN ON THIS DRAWING RELATE TO GRADE PENETRATIONS ONLY.
Issue Dwn Chk Date Client: Project: Drawing Title: Drawn: Contract Number:
1 BW DS 22/08/2018 Plant layout issued for review
BW
The following drawings, details and designs remain the property of 2 BW DS 09/12/2018 Sheet A100, A200, A300 issued CARWASH Approved: TBC
WashTec Australia Pty Ltd. at all times. They shall not be modified or PROPOSED CARWASH DEVELOPMENT DS
for approval
reproduced in part or in whole without written consent from WashTec NOOSA CAR SPA BELOW GRADE
Australia Pty Ltd. All details provided in this drawing and subsequent 3 BW DS 16/12/2018 Sheet set issued for approval R.AYACHE Date: Issue: N Leaders In Vehicle Wash Technology
sheet sets are specific to this project only. Any changes to these
NOOSA EUMUNDI ROAD HYDRAULIC Dec 2018
A BW DS 17/12/2018 Sheet set issued for construction B WashTec Australia Pty Ltd.
drawings and designs to be submitted to WashTec Australia Pty Ltd. for NOOSAVILLE, QLD PH: 02 8394 5000
approval. All drawings and designs are for reference purposes only until B BW DS 15/03/2019 Additional equipment added SERVICES Sheet Number: Scale (A1): 21 Burrows Road South, FAX: 02 8394 5099
released by WashTec Australia Pty Ltd. 'FOR CONSTRUCTION'. A300 1:100 St Peters, NSW 2044 www.washtec.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.