Council archive · source document
07/0924 - Op Works - Transport Type 5 - Domestic Marine [As Published] · 142007.924
NGOLO Ky: We Checklist - Applications Involving Land Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1.4 Form1 PartA : 1.1.1. Ensure that the form is fully completed. : Y 1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. 1.1.2.1 . If there are multiple owners, the consent of each owner is required. 1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required. 4.2 Form Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. 7 tear naE rd to referrals. 34 Ensure that Part Gis completed if EPA referrat is required, 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is pale and recorded on the application. ee “4A “Ensure that items 1 -28 have been checked and/or completed including information regarding applicant details and owners consent. OTS ACR ee §.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat Works) accompanies the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and.is unbound. 6.1 Ensure ‘that at least 6 copies s of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering letter, ensure that itis x capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. 7.2 Ensure that the fee which has been paid is recorded on the application form. Receiving Officer Maint HEM beseeeteeeesecaeeeneees pate AE SOT cece Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving trays:- « — Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section. * If the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. « Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. ¢ Inall other circumstances ~ AOP1's desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. SEPI g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 24 pages
Page 2
Part A, Version 2.4, 29 May 2006
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
Tequired, and by one (1) of more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.gld.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: fnciudinghouse number, street name, suburb/ocality name & postcode) (if applicable)
Allland the subject of the application, must be ° _
identified. However a description ofthe tnd snot Lit The. Promontry, NOO4YVILLeE 4st
- required in relation to a mobile or temporary y sy * + -
Environmentally Relevant Activity (ERA), 2. Name of water body or watercourse, within whicirthe development is proposed: (if applicable)
Advice for completing Q2 - 02 applies if TES
development Is proposed within a water body or LN Oce.A dal aA Ses: - |
@ watecourse. 3. _Loton pian description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
identffed by a lt on plan description, These detais | 214A V/0L4574 |
can be obtained from ttle documents or through the ae . .
local government, 4, The above description is for: (tick applicable box)
However, ite tandon wih the devetopren is t C1 (i) the fand-on which the developments proposed; or
he covlopret is ropased in ter cae fe ii) the land adjoining the water body or watercourse, within which the development is
watercourse) rove = on tr proposed; or
a aicingtloomt ‘and; of te (fii) the water body or watercourse.
GPS coordinates where there is
@ axfoningfadiocent ord (eg. in Moreton Bay), §. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
Advice for completing Q7 - Q7 does not apply if the | | [ | [ |
development is within a water body or watercourse,
See Ee EE ptigcrmataee. | Local government area in which the land is situated: (ag. Esk, Hervey Bay, Woocoo ete) (if applicable)
Note: Areas below high water mark are not within a .
Hote teas teow ih water mak awmatwitinag | I NINOS A COUNICAL
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidat area on which the
Advies for comptetina Q9 - 09 applies i development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
development is on strategic port land or a strategic "189 i
port tand tidal area. For more details refer to Guide 11 i
. Existing use of the and: (eg. vacant, single house, shop etc.)
[SINGLE HOKE |
. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
2. Other parts of Form 1 completed as part of this application: (eg. Part 0, Part I, etc)
fe, CREC. AST
. Applicant's name: 15. Contact person:
mest Noosé Jerry Bupess}] [EMMA PEED
When signing and todat i this ai lication 14. Contact number: 16. Facsimile number/e-mail address:
iomalon proved cect The axsesarent [(QU0KI3IS2 ] ~feees4¢so
manager, any referral agency & the Chief Executive
{where applicable) wil rely on this information wnen | 17. Postal address:
ing and deciding the application. =
ieatatbaonn commen | LO BOx 2AYNOCEAVILLE 4566
Aust be shawn, 18. Signature: 7 19._ Date:
Ga pia
(PF
Page 3
’ 18-@5-2007 11:20 .
Ti 3Bodd
NOOSA DENTAL SURGERY @7 54743877
PAGE: 1
228Eb2bS 28 AYBOUNS WINIO YSOON 2Fitt Lade-ca-st
INTEGRATED PLANNING ACT 1997
Land ovmer‘s covsent (/ anplicatne)
‘Seston 3.2.10 of he FPA presorbes halon
Sppicetion mst corte, or be exported by, ter
‘ertann coment of Op (ane) Ownen, 7 te eertiation
{) a meperistchenge of une:
(© recewhpenien of 306
‘Gort on tans below Big water inert & NOt wh) 3 |
ae ee ‘the Cocetal Protection enct
Menegerent Act
ci akon aca ttt ee
Transport tirestuchis Act
sects 3h ga ee Pa ronten al
fandonner's coneers io ul wexpirad tr 9 recttie of
ftemoormry ERA.
For mare Wormates sofa ty Guide 5,
Resource entieiemont appkcoti) 21, Does this appfication involve a State resource prescribed under a reguiztion jother fen invoning
‘Sabon 12.109 of the IPA requires evidence query, 1on Stole coastal land under the Conga Protection and Momagamont Act 19969?
foo a pecebed Sart oonune ea rho. ewan CIYES-pomaz ;
pened fede lashed 2. This application is accompanied by evidence: (ho appiatie boy
ibonn ever of tho reanurce ereearaane L210) of the allocation of, or entilvement to, the resource: atach evitenes aod go fs O44)
fase schafen ce Fan For CO {i} the chiet executive of the department administering the resource Is satisfied the
recptred by ma Sito fh expen of the lodgy OF Oty an evelopment fe consistant with an allocation ci, or entitiement to, the resource - go
Coioprrant efcaton.
Adteiry ter comesietina Sond
The intormatin in {0 ~ {vp is mandeteny # exicence is
equred ender 022 (9 oF (TR ato,
The oficial sdaep of tbe Deparment of Nepal
Recoucet, Nine and Weey bs navisinry whese Oo
‘aggicaiion laches any water cr therne query
(taal enter ho Weiter Act ARO
‘Sector 22 WA) allows ie rponuce none tp Merit,
(he fore he eetionce way be wed 075 {Ht} mest be
compiuted ¥ the enddarsce & sirvan (ierctert_
Assessment triggers
‘This chacktst does sao arly € fhe spplication requires!
We cmpkemon of Parts A gad 8 oF ne Form gabe &
trant bo comeleted fox af other apcications,
Plans / draudngs / reports
An BER ACaION choi Be adconpanerd ey detele
(7 Gi) the chief executive of the department administering the resource ia satatied the
development application may proceed In the absence of en allocation of, or
entitlement fo, the resources - gow 023
23, Evidence of the resource entitlement:
() Resource entitlement / 2
@ fate seed oe
(@ fesinot ceed ti
@ a
Dae
LT
wi) [rae caine Aaa
bs Assessment Checidist completed and atlached to this appication?
INO - tre exnsesmnent oranoges may sche fo accept Pfs application on fre
grounds Brot Iho appicaton hes aot bean property made
25. Plans/drawings/reports accompanying tis application:
Pian] Orawing | Report Munbor
(vil) Oficial stamp of the department
adeninistering the resource ¢
sppicahley
cotati.
mM,
YES
Dvte
AOK\SI
EOUOT
PLEASE NOTE: The assostment manager may rofiuca io aoodet an application thal, at fhe fee of lodgement, falts to provide all applicable information raquked by Part A
and any cer relevant pattet Form 1.
yd
OFFICE USE ONLY (apptcatia i assecsnen
O8bEPLS2 19
Segnatore: _.
SIEPINGATEPESCON e904 20 ASW at
Page 4
NS
Vg ey
ad
INTEGRATED PLANNING ACT 1997 . Part E, Version 2.0, 4 October 2004
a \
Form 1 Development Application
Operational &/or building work
assessable against a local government's planning scheme
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work {including detaifed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment’s planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises Prelimin oval - provide detaits of th f work eg, roadwork, stormwater, water and
development to occur, while a preliminary O Iwiectua app Oval - provide deta ofthe type o " + WaIBr and sewerage
approval is a step in the approval process
and does nat authorise development to occur.
The types of work that are assessable against;
@ a planning scheme are determined by the
scheme for a particular local goverment and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
scheme, contact the retevant focal
government.
AND/OR
[bevelopment permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc -
PRIVATE MMBEE SETTY
RECE VED . “ao subsequent to a previous development approval?
0
48 MAY 2007
(2 YES - provide details of al previous approvals (eg. file references)
” NOOSA SHIRE COUNCIL
FRONT COUNTER
Is the subdivision for a canal estate?
Ono
LOYEes .
: Portable Long Service Leave levy (if |4. Is paymentof a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable}
YES ~ compiet
Prior to issuing a development permit for the O complete Q5
works, the assessment manager is required 10 — 05, 6 & 7 do nol apply
Page 5
vy
Seepaeelert a!
INTEGRATED PLANNING ACT 1997 *_
by law o“sight- on approved form, issued by-|5. Has the-PLSL-levy-been-paid?.
i Qleave, which signifies that the PLSL levy
has been paid.
Part E, Version 2.0, 4 October 2004
(Yes - completeQ6
[NO - the applicable tovy must be paid before a development permit can be given for the works
6. How much was paid?
7.. Whatis the receipt number of the payment? :
[— : |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
L DATE RECEIVED |
| REFERENCE NUMBERIS |
e (ii) Has the approved form (issued
{i} 1s @PLSL levy applicable in this instance? CNo (YES - complete arin
manager / private certifier at the time of lodgement of this application? DNo C1 YES - provide receipt details below
by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
Page 6
INTEGRATED PLANNING ACT 1997
Form 1 Development Application
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IDAS Assessment Checklist, Version 20, 2 April 2007
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the [DAS Application Forms continue to refer to this document as the
_ Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an applicatiori may require assessment by the local-Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an apptication requires assessment by a Queensland State entity and may also assist the applicant to
deternine the assessment managert for the application.
PNAS
Therefore, the completion of all questions in section: 1 of this checklist is mandat tory for all applications {other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
. Section 2 is mandatory only if the proposed development is located in any part of a wild river area decidred under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
9.. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld gov.au, aU. . Guide 25 explains the role of the IDAS.
Assessment Checklist in the IDAS application pracess, and its relationship to the Form 4 development-application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www ipa.aid.gov.au.
11. Section 3 provides advice about the referrals that'can be required for applications for building work assessable against the Building Regulation 2006.
“SECTION 1 - STATE ASSESSMENT (completion mandatory) °
Note: The foltowing state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity
For more information refer to Guide 4.
Unless you answered “none of the above” to Q1,
the application requires assessment by the
administering authority3. .
If an entity, other than the administering
authority, is the assessment manager for the
application, the administering authority is a
concurrence agency for the application in relation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water|
Act 2000 is required.
1. The application involves: (tick applicable box/es)
C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
has not been made - complete Part G of Form t
11 (ii) ‘a mobile or temporary ERA for which a code of environmental compliance has not been
jade - complete Part G of Form 1
aH none of the above
/ Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable to assessment manager}
DATE RECEIVED
REFERENCE NUMBERIS *
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”
3° The ‘administering authority’ may be either the Environmental Protection Agency, the relevant tocal govemment (for a devolved ERA) or the Queenstand Oepartment of Primary tndustries and
Fisheries (for a delegated ERA).
Page 1
Page 7
“INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: (tick applicable boxes)
For more information seer to Guide 3. [1 (i) development on land contiguous to a State controlled road and for -
Unless you answered “none of the above” to Q2, .) . .
the application triggers referral to the Department LC (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency. oO (b) reconfiguring alot unless -
in certain circumstances DMR will be an advice ; : .
agency, while in other circumstances DMR will « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 ofthe IF Regulation wil assist you to Ow operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above}-
« associated with access to a State-controlled road; or
« for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
“ C1 (ii) development on land not-contiguous to a State-controlled road and -
C1 (a) material change of use -
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the {P Regulation and exceeding the thresholds set by
that schedule; ;
(1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
~ and exceeding the thresholds set by that schedule;
C1 (c) operational work (not associated with a material change of use assessable against t
planning scheme or reconfiguring a fot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
" mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
li) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. oO (i) material change of use ~
Unless you answered “none of the above” to Q3,
the application requires assessment by the (a) assessable against ‘the planning scheme;
Department of Natural Resources and Water -
(RW. (b) ona lot containing
if an agency other than NRWis the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa + if there is no property map of assessable vegetation for the lot - remnant vegetation;
ote nate for the application in relation (c)_ where the existing use of the land is a rural or environmental use; and
if you ticked 034i) or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to NRW for assessment regardless of oO {ii) reconfiguring a lot -
whether vegetation clearing is proposed or not.
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
~ assessable vegetation or, if there i is no property map of assessable vegetation "e
: the lot, remnant vegetation; -
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c} where 2 or more lots are created; and
(d)” where the size of any lot creatéd is 25 hectares or smaller - complete Part J of Form 4
Di) operational work - /
: (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
' t scheme mentioned in (i) or reconfiguting a lot mentioned i in (ii) -- complete Part J of
oY Form 1
Iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11.
If you ticked {i) - the relevant Port Authority is the
assessment manager for the application.
If you ticked (ii) Queensland Transport is a
concurrence agency for the application.
(1 (i) development on Strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
Oi
a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part f of Form 1
(iii) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if part of the land is within 100m of the State-contralled Toad; or that is part of a future State-
controlled road.
Page 2-
Page 8
a
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 20, 2 April 2007
Acid sulfate soils 5. _ The application involves development on land situated in an identified tocal government area
For more ‘information refer to Guide-10--—~~ and where the surface of the land is: (tick applicable box)
Unless you answered “none of the above" to 05, L1(i) below 20m AHD® and the development will involve the excavation of 1000m3 or more of
- the application requires assessment by
Departinent of Natural Resources and Water soil or sediment at or below 5m AHD, or
(NRW). [1 (i) at or below 5m AHD and the development will involve filling the site with 1000m? or more
fan agency other than NRW is the assessment f material
Tanager for the application, NRW is an advice < :
agency for the application in relation to this {iii) none of the above
matter. . . oe _ . eee cae
Major hazard facilities or possible 6. Does the application involve a material change of use for.a major hazard facility or possible
major hazard facilities majorazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 17. ‘0 .
Ifyou answered “YES" to Q6, the application
requires assessment by the Department of Oo YES - complete Part L of Form 1
Emergency Services (DES).
If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.
Water related development under the |7. The application involves: :
Water Act 2000 (1 (i) operational work, for taking ¢ or interfering with water under the Water Act 2000, that is:
For more information about items (a) — (f}, refer (tick applicable box/es)
to Guide 15. For more information about item
(Q), refer to Guide 14 Does my application [1 (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
involve assessment of a referable dam? dam) - complete Part K2, K3, Ks, Ke, or Ks of Form 1 whichever is applicable;
Unless you answered “none of the above" to Q7, (2 (b) for an artesian bore anywhere in the State, no'matter what the use - complete Part
the application requires assessment by the . .
Department of Natural Resources and Water Ky of Form 1,
(NRW). . . (1 (c} for a subartesian bore, in declared subartesian area’, or in a certain area covered
fan agency ride an we ihe assessment by a water resource plan, for use for purposes other than stock and/or domestic
Manager for the application, isa
concurrence agency for the application in USE - complete Part Kr of Form 1, . .
relation to this matter. C1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
O (e) for taking overland flow water in certain areas covered by awaterresource plan *
complete Part Ks of Form 1;
(2 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
(1 (g) ‘for constructing a referable dam? or works that will increase the storage capacity /
of a referable dam by more than 10% - complete Part Ks of Form 1; or
fi) none of the above. - ; a .
Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?
Cann
watercourse
For more information refer to Guide 16.
If you answered “YES" to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence-agency for the application in
relation to this matter.
Note: Part G of Form 1 is required to be
. completed as the activily of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
one an allocation notice under the Water Act 2000?
NO .
(11 YES - complete Parts Kr and G of Form 1
The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vala, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Australian Height Datum {AHD),
The declared ground water areas are listed in Guide 13 Develooment in a declared catchment area.
Referable dam is defined under the Water Act 2000.
Watescourse is defined in sch 10 of the IPA.
Page 3
Page 9
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district |
For more information refer to Guide 18. For
more information about prescribed tidat work in
local government tidal areas refer to Guide 24.-
Unless you answered ‘none of the ahove” to Q9,
the apptication requires assessment by the
Environmental Protection Agency (EPA).
\f an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
Loca! government is the assessment manager
for all prescribed tidal work.
9.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: (tick the applicable boxes)
C1 (i) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 7; or
L (ii) tidal work that is preseribed tidal work" other than in a canal! -complete Part P of Form 1; OF
C1 (ili) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.
{1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not’
to be assessable against the Water Act 2000 ;
constructing a canal12 intended to be connected to tidal waters;
constructing an artificial waterway; :
reclaiming land under tidal water:
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
[L()_ removing or interfering with coastal dunes on land, other than State coastal land,
: that is in an erosion prone aréa and above high-water mark;
0 (i) constructing a bank or bund wall to establish a ponded pasture on land, other @
2eee
OOOOOO
e
- f than State coastal land, above high-water mark; or
(v)
none of the above.
Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “none of the above” to
Q10, the application triggers referral to ,
Queensland Transport (QT) (Maritime Safel
Qld) as a concurrence agency.
Local government is the assessment manager
“for all prescribed tidal work.
10. The application involves operational work that is: (tick the applicable box/es)
CJ (i): tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
LD (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; oF
LD (iii) carried out within a coastal management district'S under the Coastal Act and for -
C) (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;
[1 (b) reclaiming land under tidal water - complete Part M of Form 1; oF
(1 (ec) constructing a canal12, if the canal is associated with reconfi iguring alot-
fh * complete Part M of Form y a
{i
iv) none of the above.
Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above” to
+ 14, the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
11.
The application involves: (tick the applicable box/es)
Ci (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's
(J (ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA'S of at least 1000m?
+ the enlargement of the GFA of existing premises by more than 1000m2
C1 (iii), reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
‘completely or partly in a coastal management district
(iv) reconfiguring a lot'? assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1 .
(v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a focal government tidal area,
18 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
Coastal management district under section 47(2) of that Act
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning schame against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated wilh the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the ariificial waterway.
Page 4
Page 10
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port 7 “—
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
Ifyou answered “YES” to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
© within 200m of a shipping channel or an entry
and exit shipping corridor for the port *
* within 1000m of a swing basin, a commercial:
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned portfacility
identified in a land use plan approved under
the Transport infrastructure Act 1994.
In all other situation the Port Authority is an
a advice agency.
Marinas
For more information refer to Guide 18.. For
information about whether a marina is prescribed
tidal work refer to Guide 24, The local
goverment is the assessment manager for all.
prescribed tidal work.
{f you answered “YES” to-Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark'® and within the limits of a port
~~ undevthe Transport Infrastructure Act 1994?
NO
(YES - comptete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Lo. ¥ . oe
13, application involve operational work that is tidal work for a marina’? with more than 6
LYES ~ complete Part M of Form.4, or Part P of Form 1 if the tidal work is prescribed tidal work
. Tidal works in strategic port land tidal
“areas
_ For more information refer to Guide 18,
Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage
For further information refer to Guide 19.
If you answered “YES” to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application,
Untess you answered “none of the above" to
Q45(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
- Declared catchment areas
Far more information, including a list of the
. declared catchment areas within Queensiand,
refer to Guide 13,
Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
4. Doogie application involve tidal works within a strategic port land tidal area20?
NO, oo
(11 YES - complete Part M of Form 1
15. Does the application involve development in a heritage registered place as defined under the
eeensend Heritage Act 1992?
NO |
(1) YES ~ complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
C1 (i) a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected a area;or registered place under the Queensland
Heritage Act 1992;
(J (ii) reconfiguring a tot if the lot shares a common boundary with a protected area or
registered place under the-Queensland Heritage Act 1992;
Di iii) none of the above.
16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es) Ni
C1 (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Ci (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity. under the Environmental Protection Act 1994;
) none of the above
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Mantime Poflution} Reguiation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 infrastructure Applications involving development on land designated for community infrastructure may __ trigger this referral. For more information refer to schedule 2 of the “IP Regulation. If you answered “YES” to Q49, the application fequires assessment by the chief executive of the department administering the Act authorising the development for the designated purpose. If an agency other than the designator is the assessment manager for the application, the designating agency will be a concurrence agency for the application in relation to this - matter. Contaminated land 17. The application involves: (tick the applicable box/es) Applications involving material change of use i Fri ; i r - ant! ot reconfiguring a lol may bigger tis Di reconfiguring a lot. for which all of part of the premises are referral. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - , + For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d); Unless you answered “none of the above" to « item 6, including the exemption otherwise provided for by paragraph (e); or Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum - Environmental Protection Agency (EPA). If an tivity: agency other than EPA is the assessment act ivity; or . . . : manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded Concurrence agency for the application in ordnance - complete Part N of Form 1 relation to this matter. . . C1 (i) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises is in an area + for which an area management advice has been given for unexploded ordnance - SK, complete Part N of Form 1 (iii) none of the above ‘ Electricity infrastructure 18. The application involves: (tick the applicable box/es) For more information refer to schedule 2of the |P C1(i)_ reconfiguring a fot where any part of the lot is - Regulation. : . epee , ae . u . . * subject to an.easement in favour of a distribution entity or transmission entity under the Intess you answered “none of the above" to 18, the application biggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under agency to which the easement is granted in . that Act; or fayour of as advice agency. + situated within 100m of a substation site; _ @ O (i) a material change of use, assessable against a planning scheme and not associated \ with reconfiguring a lot if - « any part of the premises is subject'to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and » any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement; Dili) a material change of use, assessable against a planning scheme and not associated : with reconfiguring a lot if any part of the premises is situated. within 100m of a substation site; D1 (iv) operational work that is filling or excavation assessable ccint the planning scheme, not associated with reconfiguring a tot, if ~ « any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the work is !ocated wholly or partly in the easement; « the work is located wholly or partly within 10m of a substation site; / } none of the above. Land designated for community 19. Does the application involve development assessable against the planning scheme and on in designated for community infrastructure? (i) intended to be supplied by a public sector entity; and (ii) on land not owned by or on behalf of the State; and (iii) other than development - (a) for the designated purpose; or carried out by, or on behalf of, the designator. NO Cres Page 6
Page 12
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Requiation,
Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unless you answered "none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
* Fisheries matters
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Oepartment of Primary Industries and Fisheries
(DPI&F).
If an agency other than DPI8F is the assessment
manager for the application, OPI&F is a
concurrence agency for the application in
elation to items (i) - (iv) and an advice agency
in relation to item (v).
. . IDAS Assessment Checklist, Version 20, 2 Aprit 2007
20. The application involves (tick applicable box/es) -
LD (i) a material change of use of premises -
{a} ina Major Development Area in the Urban Footprint for -
OO (i) an urban activity - ‘
(2 inan area included in a structure plan where the IPA, section 3.1. &
applies;
(0 * in an area not included ina structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
impact assessment is required under the relevant planning scheme
OO (i) intensive animal husbandry, or-
(1 (iii) residential development involving a rural residential purpose
(b)_in the Regional Landscape and Rural Production Area for -
OO (i) anurban activity and not specified in section 2.4(2); or
C (i) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Areafor- ‘
OD (i) anurban activity and not specified in section 2.10(2);
D (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
LD (ii) intensive animal husbandry
1 Gil) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that i is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
00 none of the above
The application involves: (tick the applicable box/es)
LO (i) an assessable material change of use for aquaculture - coniplete Part O; of Form 1;
OO (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Ui (i) assessable operational work completely or partly within a declared fish habitat area-
complete Part Oz of Form 1;
(| (iv) assessable operational work that is the removal, destruction or damage of a marine’
plant - complete Part O2 of Form 1;
(J (v) development assessable under the IPA, schedule 8, part 4, on land that adjoins a
declared fish habitat area;
{vi} none of the above.
21,
Page7
Page 13
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requlation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency. ct
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
C1 (ii) reconfiguring a tot—
(J (a) . on tand that is completely or partly within a public transport corridor, and the
total number of lots increases;
(2 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
[1 (©) _ onland that is within 400m of a public passenger transport facility or a future
, public passenger transport facility, and the total site area is 5000m? or greater:
[1 (@) _ for a residential purpose within the 25 ANEF contour for an airport;
L)(e) _ for a residential purpose resulting in 100 or more allotments. :
O (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
[1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
C1 (b) will result in work that encroaches into an airport's operational airspace.
(iv) none of the above. .
23. The application involves: (tick the applicable box/es}—
(i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 130 of the IP Regulation and exceeding the thresholds set by that
schedule. OO
LD (ii) reconfiguring a lot—
C1 (a) __ onland that is completely or partly within a future public transport corridor,
future railway: land or a railway tunnel easement;
CJ (b) — on land that is within 400m of a Citytrain passenger railway station or a future
: Citytrain passenger railway station, and the total site area is 5000m? or
: greater;
L(c) — on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
oO (d) — on‘land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
LJ (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
LF (f) — for a residential purpose resulting in 100 or more allotments.
LC (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
Ota) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
{2 (b) _ is completely or partly within future railway tand, or a railway tunnel easement;
(1) (c) abuts rail corridor land, commercial corridor land or future railway land, and
f the work is within 25m of the railway boundary.
(iv) none of the above.
- Moonie to Brisbane pipeline
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum!
Act 1923, currently Santos QNT Pty Ltd, for
advice.
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
0 (ii) reconfiguring a lot
C1 fii) operational work assessable agairist the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
(iv) none of the above.
Page 8
Page 14
a INTEGRATED PLANNING ACT 1997 Koala habitat area Formore information, refer to Guide 26 and schedule 2 of the IP Regulation. Unless you answered “none of the above’, the application requires referral to the Environmental Protection Agency as a concurrence agency. Wild river area For more information, refer to Guide 27 Ifyou answered YES to 26, you must also complete section 2 of this checklist. This wil enable you to determine if your application can proceed in a wild river area and which referral agency will assess your application against the Wild Rivers Code, or if the proposed development Is “prohibited” in a wild river area. Note: Development can be ‘prohibited’ in a wild fiver area because the application cannot be accepted by the assessment manager. IDAS Assessment Checklist, Version 20, 2 April 2007 25. The application involves: (tick the applicable box/es)— ( @ a material change of use of premises in a koala conservation area or koala sustainability area made assessable under a planning scheme, that is not for a domestic activity and will result in - D(a) clearing of native vegetation over an area greater than 2500m2, [1 (b) anew building and any reasonably associated structure with a total footprint greater than 1000m2; C1 (c)_ an extension to an existing building and any reasonably associated structure if the extension has a total footprint greater than 1000m2; LD (d) extracting gravel, rock or sand from an area greater than 5000m?;- DJ (e) excavating or filling an area greater than 5000m?2, . CO (f) - additional traffic in a koala conservation area or koala sustainability area, between 6p.m. on a day and 6a.m. on the following day. O (ii) reconfiguring a Iot in a koala conservation area or koala sustainability area that will tesult in - o (a) an increased number of lots; [1 (b) clearing of native vegetation over an area greater than 2500mz?, - O (ii) operational work in a koala conservation area or koala sustainability area made assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (nof associated with reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation over an area greater than 2500m2. C (iv) operational work in a koala conservation area or koala sustainability area made “ assessable under a planning scheme (not associated with a material change of use mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity and will result in — Li (a) clearing of native vegetation over an area greater than 2500m?; (1(b) extracting gravel, rock or sand from an area greater than 5000m2; aren (c) excavating or filing an area greater than 5000m?2. (v) none of the above. 26. Does the application involve development in a wild river area declared under the Wild Rivers Act 2005? me Cyes Preliminary Approval \f you answered YES to Q27, the application triggers referral to the Department of Local Goverment, Planning, Sport and Recreation as an advice agency. 27. Does the application involve a development for which preliminary approval is sought under Section 3.1.6 of the integrated Planning Act 1997? [6 Clyes Wetlands Domestic activity means the construction or use of a single residence on a lot and any reasonably associated building or structure. Examples of a building or structure that could be reasonably associated with a single residence include: caretaker's residence, granny flat, building or structure used for a home business. Note: Wetland is defined in the Integrated ~ Planning Regulation 1998. Unless you answered “none of the above” to Q28, the application involves referral to the Environmental Protection Agency as an advice agency for the application. 28, The application involves: (tick the applicable boxes) - C(i) a material change of use, other than for a domestic activity, assessable against the planning scheme that is in or within 100m of a wetland; Ci) reconfiguring-a lot - In or within 100m of a wetland that will result in (1 (a) more than 10 lots being created; or i, L (b) lots tess than 5 hectares; (iii) none of the above Page 9
Page 15
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 Aprit 2007
Conservation Estate
Urban purposes is defined in the integrated
Planning Act 1997 as “purposes for which tand is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wiidemess area
purposes”.
- Untess you answered “none of the above” to
: Q29, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
29. The application involves: (tick the applicable box/es)—
LD (i) a material change of use for urban purposes that is in or within 100m of any of the
following -
(){a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
CJ (b) a State forest or timber reserve under the Forestry Act 1959;
(J (c) amarine park under the Marine Parks Act 2004;
(1) (@) a recreation area under the Recreation Area Management Act 1988;
(J (e) a world heritage area listed under the World Heritage Convention;
(J (f)” Brisbane forest park under the Brisbane Forest Park Act 1977.
C1 (ii) reconfiguring a lot if -
CJ (a) any part of the lot is situated in, or within 100m of, any of the following -
CJ (i) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
C1 (ii): a State forest or timber reserve under the Forestry Act 1959;
C1 (il) a marine park under the Marine Parks Act 2004; :
Civ) arecreation area under the Recreation Area Management Act 1988;
Cy) aworld-heritage area tisted under the World Heritage Convention;
. Brisbane forest park under the Brisbane Forest Park Act 1977; and
CA (b)_ the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha; e@
(iii) none of the above. ,
Page 10
Page 16
i.
INTEGRATED PLANNING ACT 4997
IDAS Assessment Checklist, Version 20, 2 Aprit 2007
-WILD-RIVER-AREA
(completion mandatory ifthe proposed development is located in a wild river area)
Wild River Area ,
It the responsibility of the applicant to
determine if the development is proposed in
awild river area. 4
(nformation about wild river areas including the
geographical location and position of
Tranagement areas in relation to properties, can
_ be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.nrw.q!d.gov.au or
_ contacting the department by emailon:
wild [email protected]
Note on Referrals
Referrats for development in a wild river area
{other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referral arrangements,
Notes on development assessable
against the Wild Rivers Code
For information regarding development in awitd”
fiver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from witd river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
. May vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area,
Applications for some new developments will nat
be accepted if the proposed developments in a
high preservation area (HPA), Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.
Environmentally relevant activities
(ERAs) in a designated urban area
“Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against -
wild rivers, you do not need to complete the
Temaining questions in Section 2.
Ifyou answered NO to Q2, please complete the
remaining questions in Section 2.
1.
Which wild river area is the development proposed in?
The proposed development is to be located in: (tick the applicable box/es)
(Ji) ahigh preservation area (HPA);
* (Jil) a preservation area (PA) ;
O iii) a wild river floodplain management area (FMA);
fj iv).a wild river nominated waterway;
O v) a designated urban area (DUA).
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant
i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
oO NO [YES (ensure you have completed Part G of Form 1)
wild river declaration)?
Clearing native vegetation
IE YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.
If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box fi)
the application will not be accepted.
Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
+ development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
{s the application operational work for clearing native vegetation in a HPA?
O NO O YES (ensure you have completed Part J of Form, 1)
If YES, is the clearing?
oO i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
oO ii) in a HPA outside a registered area of agriculture?
Page 14
Page 17
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Works in tidal areas, coastal
management districts and fish habitat
areas
If you answered YES to Q5, and ticked any
, boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
Wf you answered YES to-Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.
Note: If specified works are proposed in a local
govemment area, it is prescribed tidal work — the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency
Ifyou answered YES to Q5, and ticked box ii) or
il) in Q6, your application requires referral to
OPIF.
{f you answered NO to Q5 and ticked box i) in
Q6, the application will not be accepted,
{f you answered NO to Q6, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
«required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
Rot be accepted.
{f you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
_ Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
6.
ls the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
no Cl ves
The application is for one or more of the following:
XQ i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF
oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF
LD itiy Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
‘Residential, commercial or industria
. development
Ifyou answered YES to Q7, your application is
Not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
fiver declaration or Wild Rivers Cade, you do not
need to complete the remaining questions in
Section 2.
~ Ifyou answered NO to Q7 and ticked either box
i) or ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.
7.
8.
Is the application. for residential, commercial of industrial development in a designated urban
area? .
CJ No CJ yes
If NO, does the application for residential, commercial or industrial development involve:
oO i) a material change of use made assessable ina local government planning scheme
(ensure you have completed Part D of Form 1); or
O ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
@
_ Animal husbandry activities
If you answered YES to Q9 your application
‘requires assessment against and must comply
with the' Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed ina
HPA. For more details and a definition of animal
‘husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
O NO CJ YES (ensure you have completed Part R of Form 1)
Agricultural activities
Ifyou answered YES to Q10, your application
Tequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
fot be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27. v
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005, For
more information see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?
‘CI No 1 YES (ensure you have completed Part Q of Form })
If YES is the application for: /
(_] i) a material change of use; or
(J ii) operational works.
Page 12
Page 18
we
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
IDAS Assessment Checklist, Version 20, 2 April 2007 ,
Does the application involve works that take overland flow water in a HPA or an FMA?
‘The relevant wild river declaration wil state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
It you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
{f you ticked Q13 ii) an application is not required
_ to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Myou licked Q43 iii) your application is not
Subject to wild river requirements.
Applications for development that is other than -
that stated to be assessable, seif-assessable or
exempt will not be accepted.
- Works that interfere with overland
flow water .
The relevant wild river declaration will state
works that interfere with overland flow water that
‘are either self assessable, assessable or exempt
from wild river requirements.
“Ifyou ticked Q15 i}, your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
{f you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q15 if) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self- ‘assessable or
exempt will not be accepted.
13,
LNo
5.
oO YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
O i) assessable works
(J ii) self-assessable works
(1 ii) exempt works
Does the application involve works that interfere with overland flow water in a FMA?
CO No oO YES (ensure you have completed Part Kio of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
Li) assessable works:
(J ii) self-assessable works
(iii) exempt works
Waterway barrier works
Applications for building‘or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
16.
Does the application involve building or raising waterway barrier works in a PA?
oO NO O YES (ensure you have completed Part Os of Form 1).
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted.
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with water in a
watercourse
Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ii} in Q19, your application wilt
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
waw.nrw.gld.gov.au or contacting the
department by email on: ‘
[email protected] the application involve aquaculture in a PA?
‘Jno
[1 YES (ensure you have completed Part O: of Form 1)
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
CINo
If YES,
Oo i) The application is for an instream dam or weir; or
oO ii) The application is for operational works that interfere with water i in a watercourse, and is
for development other than a dam or weir.
oO YES (ensure you have completed the relevant Part K of Form 1)
Page 13
Page 19
INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 20, 2 April 2007
Environmentally relevant activities | 20. Does the application involve an ERA?
Most applications for an ERA in a HPA will not .
be accepted. Applications which may be made 0 NO | YES {ensure you have completed Part G of Fort)
require referral to the EPA. The assessment of .
some ERAs is assessed by NRW, othershave | 21. Is the application for an ERA 20 instream?
been devolved to DPIF, NRW or delegated :
loca! govemment (see EPA website for more oO NO O YES
information on devolved ERAs)
Ifyou answered NO to 020 you donotneedto | 22. Is a quarry allocation notice held for the proposed ERA 20 instream?
complete Qs 21-24.
If you answered YES to Q20 and the , O NO . O YES
developments in 3 PA, yur oan Mnust be
assessed by the administering authori ination j ina i 9
against he Wild Rivers Code and must comply 23. Does the application involve any of the following in a HPA?
with the code, unless the proposal is for i) a level 2 ERA 11, (and is for specified works or a residential complex)
development where an application will not be . . .
accepted, or is exempt from wild river ii) an ERA 19 (dredging) :
requirements (see Q2). You will be able to ” toe ‘ . i i ‘ j
determine fan application wil not be accepted - iii) Low impact ERA 20 (out of stream) for specified works ora residential complex (as defined in
for the development by answering Q21 ~ Q24, the Wild Rivers Act 2005, and Environmental Protection Act 1994)
If you answered NO to Q21, you do not need to iv) an ERA 22 {out of stream)
complete Q22. If you answered YES to Q21 you
are required to complete Q22. O NO - O YES
lf you answered NO to Q22, the application will
not be accepted. If you answered YES to Q22, 124. Is the proposed development for ERA 20 (out.of stream) and;
the application must be assessed by NRW . FMA: and
against the Wild Rivers Code and must comply — ina 1 an
with the code. — notlow impact; and @
(f you answered NO to Q23 and the development idential : + f if 3
is proposed in the HPA the application will not be - not for a residential complex in the area, or for specified works.
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or O NO O YES
. NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
H you answered YES to Q24 the application wilt
not be accepted. If you answered NO to 024,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code. .
Exempt ERAs in a designated urban
area
If the development is proposed in a designated
urban area there may be no wild river
Tequirements. See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
“Wild Rivers Code (other than exempt ERAs in a
designated urban area),
Documentation - 25. Has documentation been included with the application describing how the applicant proposes to
I¥you answered NO to 025, your application comply with the mandatory requirements, required outcomes, and/ or performance requiremen
may be subject to an information request and * 7 . 9
processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code?
Ono Clyes
2 The administering authority may be either the EPA, or if devolved or delegated, the local goverment, DPIF or NRW.
Page 14
Page 20
——--
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
SECTION: 3= BUILDING REFERRALS (completion not mandatoty)
Below is a list of the referrals that can apply to an apptication for building work assessable against the Building Regulation 2006, This section of the iDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1.
For more information go to schedule 2 table 1 and
‘Schedute 2A of the 1P Regulation.
Assessment period 15 days. No response is 2
deemed refusal.
An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work
Tequires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
(IP Regutation) or includes an altemative solution assessed against the performance requirements of the
Building Code of Australia.
Fire safety for budget accommodation | 2.
For more information go to schedule 2 of the IP
Reaulation
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
the subject of the application requires the instalation of a fire safety system for a budget accommodation
building.
Spray painting . 3.
For more information go to schedule 2 of the IP
Requtation
An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency:
if the application involves a workplace incorporating spray painting. :
Retail meat premises 4,
For more information go to schedule 2 of the [P.
Regulation
An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
Tetail meat premises.
Private health facilities . 5.
For more information go to schedule 2 of the IP.
Regulation
An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.
Workplace area less than 2.3m? 6.
For more information go to schedule 2 of the IP.
Regulation
An application may trigger referral to the Department of tndustrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m2.
Land contigtious to a State-controlted | 7.
toad :
For more information go to schedule 2 of the IP
Regulation
An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road.
Pastoral workers accommodation 8
For more information go to schedule 2 of the IP
ion
An application may trigger referral to the Department of industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.
Child care centre 9.
For more information go to schedule 2 of the IP
Regulation
An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre.
Coastal development 10. ‘An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the |P if the application involves land completely or partly seaward of a coastal building line22,
n
Heritage 11. An application may trigger referral to the Heritage Councit as a concurrence agency if the application
For more information go to schedule 2 of the {P
| Regulation
involves a heritage registered place.
Fisheries matters 12.
For more information go to schedule 2 of the (P.
Regulation
An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as‘an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
Integration of land use and public 13.
transport
For more information go to schedule 2 of the [P
Regulation -
An application may trigger relerral to Queensland Transport as a concurrence agency if the application
involves existing or future public transport corridors, or airport operational airspace”’.
| Railway safety and efficiency 14.
For more information go to schedule 2 of the |P.
Regulation
An application may trigger referral to Queensland Transport as.a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19}, and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
‘tefusal. However for amenity and aesthetics impact of Particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15.
particular building work for single
detached class 1 building or class 10
building or structure
For more information go to schedule 2 table 1 of the
IP Regulation.
Assessment period 15 days. No response is a
deemed approval,
An application will trigger a relerral to the loca! government if it is :
¢ fora single detached class.1 building or class 10 structure; and
the local government has declared by resolution the following:
— (he appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and
— the appearance of the building or ‘structure would be in extreme conflict with the character of the
locality.
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
2 Operational airspace is as defined in State Planning Policy 1/02 “Develapment in the Vicinity of Certain Airports and Aviation Facilities",
Page 15
Page 21
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 An application:to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a designated rainwater tank area’ For more information go to schedule 2 table 1 of the IP Requlation and the QOC part 25. Assessment period 15 days. No sesponse is a ‘| deemed refusal. Whether particular buildings may be | 16. occupied for residential purposes referral to the local government as the concurrence agency. For more information go to schedule 2 table 1 of the . IP Requtation. Assessment period 15 days. No response is a deemed refusal. . Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code. IP Regulation. 18. An application may trigger referral to the local govemment as the concurrence agency if the building work Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover. deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work , does not comply with the qualitative staterient for performance criteria 4, 5, 7, 8 or 9 of the Queensland Development Code, part 11 or 12, Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence’agency to determine the accommodation buildings - building will comply with the fire safety standard under the Building Act 1975 when the building work has For more information go to schedule 2 table 1 of the been completed. 4 IP Requiation, Assessment period 15 days. No responses a deemed refusal. . a Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the services building work For more information go to schedule 2 table 1ofthe | , * complies with the performance criteria of the Queensland Development code part 15; and IP Regulation and the QDC part 15. « the work does not comply with an acceptable solution stated in the part. Assessment period 15 days. No response is a © deemed refusall. . "| Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential For more information go to schedule 2 table 1 of the Services (Accreditation} Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger IP Regulation and the QDC part 20. referral to the local government as the concurrence agency. Assessment period 15 days. No sesponse is a deemed refusal, Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger febuilding referral to the local government as the concurrence agency. For more information go to schedule 2 table 1 of the , . IP Requlation. "| Assessment period 5 days. No response is a deemed refusal. - Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the building work or structure complies with the relevant performance criteria if - ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant building work, in a designated rainwater tank area; and « Under the Queensland Development Code, part 25, the rainwater tank does not include.an acceptable solution for a relevant performance criteria. Page 16
Page 22
nm _ LAND USE SECTION FEES NOOSA RECEIPT TYPE SALE OF DOCUMENTS : Superseded Pianning Scheme‘Documentation ~ 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES: oO Material Change of Use - Code/Impact / Consistent 521 Inconsistent 521 - Assessment under Superseded Planning Scheme _ §21 Modification to a Development Permit . 521 Extension of a Currency Period : : §21 Operational Works - Landscaping : 521 @ Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING : Purchase Advertised Applications ~ §23 JETTIES ‘ | Jetty Application Fee /Z00- 00 524 * Jetty Bond S00. 00 51 : : . . (Category 4) BONDS . Performance Bond . 4 (Category 9) SIGNS , : ., . Registration Fee mo, , co ; 222 " . ——— @... FEE ; , Search of Land Use Section file . 112 Liquor Licensing Request 113 _ TOTAL. $ /760-00 blar konstuchon sly ZTfa — NAME: _C/- Nowra Jetty Builders ADDRESS: Yo Box 744 Moovavilte GUI FFbb- | FILE NO: _ __p007/ 474 DATE: (8-507 REcEIPTNO: = 6 7 4 Signature of TP Officer: /- Af AUTHORITY NO: — /4[ 1007/ 4924-/1
Page 23
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development : [Consistent 1.0: Inconsistent 3.0 FEE CALCULATION |” MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development — ry pe 4 Vomeoht Maarirve FEE CALCULATION = 799.90 (WoO/A wore) #00. oo ( bond) TOTAL FEES $ /700.00
Page 24
-79/20__
Su FROM +—————_+— + > LNOAWT ONINVYS
_ ++ tee
NVid aus . | _
ag | vse | § Lovenus vos yo
ZiLLOVYG 10 204 LELLBYYR 10 Gasodoud dasodOud g a 2 g
voor D umne, Ww HOY ALNNOD pave2s | IX, x
— rene a * {
sseouyBug wbreed HAD / muraonng 618 107 com .
2L9 EST OT0 NOW IN] = - .
seyejpossy 2 aunsuoud Wau smos aw we, |e =! °
USPJON uuor & OaLVael NIM 002 2 > a
SYSLVM VSOON oN yr yp N
AYOLNONOUd aH ons SSzINWv1S OML HM —< el
4 GaXi4
6 ie 107 GMH #14 SZ} x Be ;
:ONIHO30
ALLAP GASOdOud| | ted
SIMON T] | r TP
Seats oor rer spon omen ¢ . : |
ee A A ot 960 00 28 NY Z Rls : »
021621 ON eoumon af ube ae calvin ays FauOSO 8
IOOSSY GNY ONIHOLI
sy30ing 618 101 3NO1S JO VSO 38 OL Sid |
ALL3Sr VSOON __H 1
ee Pr
| il poner
fz ; => 77 Se 7
" /
| 0s: re meus /+$—__+ sm oars sumsonco
[ |
& NOILVAA 13S
: | NOILWAST3
AYOLNOWOUd SHL
3000 ONTlid - 6G1Z SV HLIM
S3ONVGUOOOV NI G3TIVLSNI 38 TIVHS S3Tid Tv -
9 GUVZVH O1 CALWSUL ONV
GOOMAYVH G3A0€ddv 38 TIVHS S3Tid Tv
/ ONIHOLd SNOLS ‘Sad
|
GHW 7'0 Te ALVA WINNININ a
oad 4030
ee ee [ asi ri ot
_. . - GHV 00°2 Td 18A37 G00713 GaqdOOay WANIXYA |
Page 25
KICKER:
76 x 38 HWOD
1/75 x No14 TYPE 17
STAINLESS
SCREWS @ 450 CRS
150 x 75 HWD WITH AS 2158 - PILING CODE
WITH 2/418 S/S BOLT
r
2 ~
\
:
SECTION (A
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec
2M16 §
VLA I
@ 200 H8 MARINE HWD POLES {|
NOTE THAT ALL POLES TO COMPLY
WITH AS 2159 - PILING CODE
200
DETAIL ( 3 :
NOTES:
1, UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS’
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.”
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
THE PROMONTORY
NOOSA WATERS
PTY LTD T/A
John Norden
& Associates
ACN 010 263 877
Strvctural | Chvil Design Engineers
‘Suite 16 ‘Tewentn Plaze’
Poinciena Avenue / PO Box 208
Tawantin Q 4565
Ph: O7 54467137 Fac OF 84497172
Emek:
Johnnorden_eescogpintemode.on.net
= Poe
ee
worknsyone
or64.2 [oo
Used in these records
07/0924 - Op Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.