Skip to the record
The gold standard in government transparency.

Council archive · source document

07/0924 - Op Works - Transport Type 5 - Domestic Marine [As Published] · 142007.924

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Works in tidal areas, coastal
management districts and fish habitat
areas

If you answered YES to Q5, and ticked any

, boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

Wf you answered YES to-Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
govemment area, it is prescribed tidal work — the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency

Ifyou answered YES to Q5, and ticked box ii) or
il) in Q6, your application requires referral to
OPIF.

{f you answered NO to Q5 and ticked box i) in
Q6, the application will not be accepted,

{f you answered NO to Q6, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a

«required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
Rot be accepted.

{f you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers

_ Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

6.

ls the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

no Cl ves

The application is for one or more of the following:

XQ i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF

oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

LD itiy Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

‘Residential, commercial or industria
. development

Ifyou answered YES to Q7, your application is
Not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
fiver declaration or Wild Rivers Cade, you do not
need to complete the remaining questions in
Section 2.

~ Ifyou answered NO to Q7 and ticked either box
i) or ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

7.

8.

Is the application. for residential, commercial of industrial development in a designated urban
area? .

CJ No CJ yes

If NO, does the application for residential, commercial or industrial development involve:

oO i) a material change of use made assessable ina local government planning scheme
(ensure you have completed Part D of Form 1); or

O ii) operational works associated with reconfiguring a lot (ensure you have completed Part F

of Form 1).
@

 

_ Animal husbandry activities

If you answered YES to Q9 your application
‘requires assessment against and must comply
with the' Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed ina
HPA. For more details and a definition of animal
‘husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

O NO CJ YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

Ifyou answered YES to Q10, your application
Tequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
fot be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27. v

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005, For
more information see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?

‘CI No 1 YES (ensure you have completed Part Q of Form })

If YES is the application for: /
(_] i) a material change of use; or
(J ii) operational works.

 

Page 12

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0924 - Op Works - Transport Type 5 - Domestic Marine [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.