Council archive · source document
07/0924 - Op Works - Transport Type 5 - Domestic Marine [As Published] · 142007.924
NS
Vg ey
ad
INTEGRATED PLANNING ACT 1997 . Part E, Version 2.0, 4 October 2004
a \
Form 1 Development Application
Operational &/or building work
assessable against a local government's planning scheme
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work {including detaifed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment’s planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises Prelimin oval - provide detaits of th f work eg, roadwork, stormwater, water and
development to occur, while a preliminary O Iwiectua app Oval - provide deta ofthe type o " + WaIBr and sewerage
approval is a step in the approval process
and does nat authorise development to occur.
The types of work that are assessable against;
@ a planning scheme are determined by the
scheme for a particular local goverment and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
scheme, contact the retevant focal
government.
AND/OR
[bevelopment permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc -
PRIVATE MMBEE SETTY
RECE VED . “ao subsequent to a previous development approval?
0
48 MAY 2007
(2 YES - provide details of al previous approvals (eg. file references)
” NOOSA SHIRE COUNCIL
FRONT COUNTER
Is the subdivision for a canal estate?
Ono
LOYEes .
: Portable Long Service Leave levy (if |4. Is paymentof a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable}
YES ~ compiet
Prior to issuing a development permit for the O complete Q5
works, the assessment manager is required 10 — 05, 6 & 7 do nol apply
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0924 - Op Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.