Skip to the record
The only place to find full transcripts.

Council archive · source document

Decision Notice - 010.2009.00001176.001 [As Published] · 132009.1176

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                                                       2009/1176




         Plan No                Rev.       Plan / Document Name                        Date

         WCT Sheet 1 of 13       -         Site Plan – Ausmar Homes                    22/07/09

         WCT Sheet 2 of 13       -         Ground Floor Plan – Ausmar Homes            22/07/09

         WCT Sheet 3 of 13       -         Upper Floor Plan – Ausmar Homes             22/07/09

         WCT Sheet 4 of 13       -         Elevations – Ausmar Homes                   22/07/09

         WCT Sheet 5 of 13       -         Elevations – Ausmar Homes                   22/07/09

2.      The development must be undertaken and operated in a manner that causes no detrimental
        effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
        lighting nuisance or other emissions.
3.      The building height shall not exceed 8.0 metres above the natural and finished ground level.
4.      A minimum of 20% of the site shall be retained as soft landscaping.
5.      Cleared vegetation is to be suitably processed by one of the following methods and removed
        from the site:
        5.1.      Processing through a woodchipper or shredder. The resulting mulch is to be
                  stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
                  with a minimum of 10 metres between edges of heaps.
        5.2.      Disposal for firewood.
        5.3.      Disposal for landscaping purposes.
        5.4.      Transport to alternative site for breaking down materials provided that all necessary
                  permits have been obtained to allow the alternate site to be used for this purpose.
        5.5.      The applicant is advised that burning off is an unacceptable method of disposal.
6.      Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings)
        shall not be constructed under overhead electricity transmission lines, or within any
        easements.
7.      Interference with vegetation on the site shall only occur to accommodate the proposed
        Detached House.
8.      Earthworks required on site shall be carried out in accordance with Council’s Planning
        Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
        ponding of water on any adjoining lands or concentrate or direct overland flow on to an
        adjoining property.
Relevant Period
9.      The Development Permit for a material change of use lapses if the use has not happened by
        25 September 2013, unless an application to extend the currency is approved by Council.

5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger             Referral Status     Referral Agency       Referral Address

 Not applicable


                                                                                      Page 2 of 6

Used in these records

About this file

File size
54 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00001176.001 [As Published].pdf · 54 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.