Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

App D - Code Tables · MCU17/0024.04

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Noosa Plan 2020: Amendment 2
Part 6 Zones \ 6.6 Recreation Zones Category \ 6.6.1 Recreation and Open Space
Zone Code




Earthworks and drainage

PO39                                                    AO39                                                         AO39 – Can comply
Filling, excavation and retaining structures do not     Filling and excavation works are designed and
directly, indirectly or cumulatively cause adverse      constructed to ensure overland flow and/or flooding is
impacts external to the development site by:            not worsened, impeded, or otherwise diverted to
(a) causing ponding of water on the site or nearby      adversely affect other properties or downstream
       land;                                            environments.
(b) increasing flooding, which adversely affects the
       safety or use of any land upstream and
       downstream; or adversely affecting the flow of
       water in any overland flow path.

Table 6.6.1.3 - Criteria for assessment (part)

Performance outcomes                                    Acceptable Outcomes                                          Comments

Environment and heritage
PO40                                                  AO40.1                                                         AO40 – Can comply
Development:                                          Development does not result in sediment or other
(a) has minimal impact on the natural landform of the material including building materials or waste products
     site;                                            being deposited or released into the road reserve,
(b) does not lead to erosion or the transport of      stormwater drain or adjacent properties.
     sediments off site;                              AO40.2
(c) does not lead to the disturbance of natural       Development on a site adjoining a local heritage place
     features, buildings or structures of cultural    respects the cultural heritage significance of the place
     heritage significance.                           by mitigating any adverse impacts on the setting or
                                                      integrity of the heritage values.
                                                        Editor’s Note: Local heritage places are identified on the
                                                        Heritage and Character Areas Overlay Maps in Schedule 2.

PO41                                                    No acceptable outcome provided                                PO41 – Comply
Uses are conducted in an environmentally responsible                                                                 The Club has been operating in an environmentally
manner, operating without deleterious impacts on                                                                     responsible manner for decades.
immediate, surrounding or downstream communities,
environments or environmental processes.


Print Date: 17/10/2025                                                                                                                                          Page 14

Used in these records

About this file

File size
900 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App D - Code Tables.pdf · 900 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.