Original PDF page 1, section 1. The text section number identifies this passage in the reader.
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 34 (of 113)
Section 2
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Document Verification
Job Title RACV Noosa Resort – Proposed Eco Resort Extension
Job Number 22366
Document Title Site Based Stormwater Management Plan
Document Control
Revision
Date Document Author Reviewer
No.
04.06.2019 Site Based Stormwater Management Plan 00 B Plunkett M Van Itallie
11.09.2019 Site Based Stormwater Management Plan 01 J Hewitt M Van Itallie
15.06.2022 Site Based Stormwater Management Plan 02 T Mathew M Van Itallie
04.07.2022 Site Based Stormwater Management Plan 03 T Mathew M Van Itallie
T Mathew /
14.12.2022 Site Based Stormwater Management Plan 04 M Van Itallie
A Mallard
Approval for Issue
Name Signature Date
Theres Mathew / 14.12.2022
Aiden Mallard
Michael Van Itallie (RPEQ 13469) 14.12.2022
© Document copyright of ADG Engineers (Aust) Pty Ltd
This document is and shall remain in the property of ADG. The document may only be used for the purpose
for which it was commissioned and in accordance with the Terms of Engagement for the commission.
Unauthorised use of this document in any form whatsoever is prohibited.
To the extent permitted by law, ADG expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. ADG does not admit that any action, liability or claim exist or be available to any third
party.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 2
Section 3
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Contents
EXECUTIVE SUMMARY 5
1 INTRODUCTION 7
1.1 Background 7
1.2 Background Information 7
1.3 Property Detail 7
2 EXISTING SITE 8
2.1 Existing Site Features 8
3 FLOODING 9
3.1 Flooding Considerations 9
4 STORMWATER INFRASTRUCTURE 11
4.1 Existing Infrastructure 11
4.2 Lawful Point of Discharge (LPD) 11
4.2.1 Existing LPD 11
4.2.2 Proposed LPD 11
4.3 External Catchment 11
5 STORMWATER QUANTITY ASSESSMENT 12
5.1 Proposed Development and Associated Issues 12
6 STORMWATER QUALITY ASSESSMENT 12
6.1 Treatment Objectives 12
6.2 Site Analysis and Design Strategy 13
6.2.1 Pre-Development Phase 13
6.2.2 Bulk Earthworks Phase 14
6.2.3 Construction Phase 14
6.2.4 Maintenance 15
6.3 Operational Phase Treatment 15
6.4 Stormwater Quality Improvement Devices (SQIDs) 15
6.4.1 First Flush Device 15
6.4.2 Bioretention Basin 15
6.5 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank 16
6.5.1 Internal Demand 16
6.6 MUSIC Model 16
6.7 On-site Treatment Lifecycle Costs 19
6.8 Water Quality Monitoring 19
6.9 Maintenance 19
7 CONCLUSION 20
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 3
Section 4
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Figures
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22) 8
Figure 2 - Site Layout (as accessed from Nearmaps 20.04.2022) 9
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017) 10
Figure 4 – Treatment Train for Pre-Development 17
Figure 5 - Results for the Pre-Development Model 17
Figure 6 - Treatment Train for Proposed Development 17
Tables
Table 1 - Property Detail 7
Table 2 - South East Queensland (SEQ) Targets 13
Appendices
Appendix A Site Survey
Appendix B Architectural Drawings
Appendix C ADG Preliminary Plans
Appendix D Landscape Concept
Appendix E Noosa Shire Council Code Responses
Appendix F Noosa Shire Council Erosion Hazard Assessment
Appendix G Noosa Shire Council (Interactive Mapping)
Appendix H MUSIC Modelling Information
Appendix I Geotechnical Report for Neighbouring Development
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 4
Section 5
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
EXECUTIVE SUMMARY
ADG Engineers (Aust.) Pty Ltd has been engaged by Aspect Architects to prepare a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) as
additional information in support of a Development Application for a Material Change of Use for a
proposed Eco Resort Extension to the current RACV Noosa Resort located at 94-142 Noosa Drive,
Noosa Heads QLD 4567.
The proposed development as shown in Aspect Architects plans is for eight (8) double storey eco
resort style units, raised boardwalk footpath links and associated carparking. The proposed
application to Council also includes works involving converting an existing pond internal to the RACV
Noosa Resort site into a new pool. ADG make note that this existing pond does not form part of an
existing site-based stormwater treatment train nor provides further stormwater detention
management. The pool works is to form part of separate application submitted to Council for building
approval.
The report comprises of stormwater quantity and quality assessments. The quantity assessment is
undertaken to confirm a ‘non-worsening’ of peak flow discharges from the site and the quality
assessment is undertaken to determine the required stormwater treatment measures to be
implemented on site.
The stormwater quantity objective was to demonstrate that there are no impacts from storm events
up to and including the 1% AEP storm event. The purpose is to ensure that the existing infrastructure
and/or downstream properties are not adversely affected. Due to negligible increase in peak flows
from the subject site and the subject site being located close to the downstream waterway hence in
the lower portion of the regional catchment, it is considered unnecessary to include provision for
stormwater quantity management as the proposed runoff is intended to infiltrate into the existing sub-
surface utilising a ‘pipeless’ bio-retention solution. Coffey Geotechnics provided a geotechnical report
for the neighbouring ‘Noosa Sanctuary’ project previously. This investigation identified a silty sand
from an approximate depth of 1.0m below the existing ground surface level. It is recommended that
a hydraulic conductivity test be performed by an experienced geotechnical engineer at the detailed
design phase to confirm the soils permeability and infiltration capability.
Currently no stormwater quality management measures are in place for the Eco Village subject site.
Stormwater treatment measures are proposed to be implemented on site in accordance with Industry
Best Practice, WSUD Engineering Guidelines and, Council’s Land Development Guidelines to
provide stormwater treatment for this site. ADG recommends the use of the following devices to meet
the water quality objectives identified within the SPP 2017 and Council’s WSUD Planning Scheme
Policies:
Combined 40kL Rainwater Tank (Reuse)
30m2 Bioretention Basin that will permit flows to infiltrate into the subject sites sub-surface.
First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to vegetated areas
To address the Noosa Shire Council’s RFI dated 2nd September 2022, the following has been added
to this SBSMP:
The revised eMUSIC model compares the pre and post-development stormwater pollutant
residual loads in Section 6.6 of this report. ADG advise the post-development pollutant residual
loads are now below the pre-development stormwater pollutant residual loads and that water is
intended to infiltrate into the sub-surface strata of the subject site through the drainage layer of
the proposed bio-retention basin. This results in no increase in gross pollutants, total suspended
solids, total phosphorus or total nitrogen compared to the pre-development scenario.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 5
Section 6
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
All relevant standards and guidelines are addressed in this Stormwater Management Plan including
criteria from the Noosa Shire Council Planning Scheme Policies, Queensland Urban Drainage
Manual (QUDM) 2016, State Planning Policy (SPP) 2017 Plumbing and Drainage Code AS3500.3
and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 6
Section 7
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
1 INTRODUCTION
1.1 Background
ADG Engineers (Aust.) Pty Ltd was engaged by Aspect Architects to carry out a Site Based
Stormwater Management Plan (SBSMP) suitable for submission to Noosa Shire Council (NSC) and
any required referral agencies for a proposed Eco Resort Extension to the current RACV Noosa
Resort located at 94-142 Noosa Drive, Noosa Heads QLD 4567.
The purpose of this Stormwater Management Plan is to provide advice on the proposed development
about stormwater drainage, stormwater quality and quantity measures, and flooding. The required
infrastructure will be subject to the conditions attached to the Development Approval to be provided
by Noosa Shire Council and any nominated referral agencies.
1.2 Background Information
This report was compiled using information from the following sources:
‘Dial Before You Dig’ (DBYD) As-Constructed information;
NSC interactive mapping via DBYD (Refer to Appendix G);
NSC flood and stormtide inundation mapping (Refer to Appendix G);
Detailed survey plan prepared by Skyline Surveyors (Refer to Appendix A);
Architectural drawings by Aspect Architects (Refer to Appendix B); and
Google Maps Aerial Imagery.
1.3 Property Detail
The details of the property for the proposed development can be seen in Table 1 below.
Table 1- Property Detail
Title Lot 203 on SP267424, Lot 0 on SP203415 and Lot 3 on SP126203
Street Address 94 - 142 Noosa Drive, Noosa Heads QLD 4567
Total Site Area 63,839 m2
Developable Site Area 5,457 m2 (Lot 3 on SP126203)
The location of the proposed development is demonstrated in Figure 1.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 7
Section 8
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
N
Subject Site
Development Site Area
Figure 1 - Site Location (as accessed from Noosa Interactive Maps 20.04.22)
2 EXISTING SITE
2.1 Existing Site Features
The subject site is currently occupied by the RACV Noosa Resort.
The site is bound by:
Noosa Drive to the east
Sanctuary Drive (internal road within RACV Noosa Resort) east of the development site area
Weyba Creek Bushland Reserve North, west of the development
Existing college buildings and ancillary structures internal to the site boundary to the east
and south; and
Existing college sporting ovals and Cooroy Creek internally to the west and south-west.
The site generally slopes from the east to the west at a grade of approximately 6%. The existing site
features can be seen in Figure 2.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 8
Section 9
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Location of existing
pond converted to
new pool.
Submitted as part
of separate building
approval
Subject Site
application to
Council
Development
Site Area
Figure 2 - Site Layout (as accessed from Nearmaps 20.04.2022)
The existing contours, surface levels and the location of the existing buildings are identified on the
survey plan drawing as attached in Appendix A of this report.
3 FLOODING
3.1 Flooding Considerations
Review of Councils interactive flood hazard overlay mapping has identified the subject site is located
within an area subject to flooding as can be seen in Figure 3. Any habitable buildings are to ensure
they are suspended above the existing surface with allowance for freeboard flood immunity reflective
of the nominated Council defined flood level.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 9
Section 10
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Developable
Site Area
Figure 3 – Development Flooding Data (1% AEP Flood Extent 2017)
Furthermore, review of Noosa Shire Council’s 2019 Draft Planning Scheme Policy Coastal Hazards
mapping indicates the subject site is located within an area subject to Sea Level Rise HAT
inundation and Stormtide inundation 1% AEP events. Refer to Appendix G for Council flood
mapping plots regarding extents of the above-mentioned inundation events.
In response to Council’s information request, ADG note the proposed cabin lodge’s will be
suspended structures along with the walkways and carpark. The minimum habitable floor level for
the suspended cabins is RL3.4m AHD. Appendix G which illustrates the council flood mapping,
plots this defined flood event (DFE) extents at approx. RL2.4m AHD. Give the finished floor level
(FFL) is at minimum RL3.4m AHD, there is a minimum of 1.0m between the assumed DFE and FFL.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 10
Section 11
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
4 STORMWATER INFRASTRUCTURE
4.1 Existing Infrastructure
A Noosa Shire Council DBYD search and detailed survey identified the following stormwater
infrastructure within the vicinity of the subject site:
Existing 1050mm stormwater pipe and associated gully pit traversing the southern portion of 94
Noosa Drive (Lot 203 on SP267424) and the existing Sanctuary Drive Road via kerb and channel
adapters to the north-east of the proposed extension;
Existing Council stormwater infrastructure consisting of 375-525mm stormwater pipes and gully
pits external to 142 Noosa Drive (Lot 3 on SP126203) within the south-eastern roundabout.
Refer to Appendix A for the detailed survey for further information regarding the existing stormwater
infrastructure.
Note: A diversion swale exists within existing RACV Noosa Resort along the development sites
northern boundary internal to the resort development property. ADG refer reader to previous site
reporting documents for details.
4.2 Lawful Point of Discharge (LPD)
4.2.1 Existing LPD
Based on information gathered via survey and contour data, aerial imagery and site investigation it
has been determined that the development site discharges stormwater flows via overland flow
towards Weyba Creek.
4.2.2 Proposed LPD
It is proposed to maintain the existing ultimate lawful point of discharge being Weyba Creek to the
west. Any increased runoff because of the proposed development is anticipated to be infiltrated
onsite.
Refer to Appendix C for the Preliminary Layout Plans prepared by this office.
4.3 External Catchment
No significant upstream catchment directly acts on the developable site area, other than the carpark
extents beyond the boundary line. The area within Sanctuary Drive discharges to the existing council
infrastructure within the road via kerb and channel adapters, this it to remain unchanged.
Refer to Appendix A for the detailed survey for further information regarding the existing site
features.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 11
Section 12
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
5 STORMWATER QUANTITY ASSESSMENT
The aim of the stormwater quantity assessment is to ensure that the development shall impose no
adverse effects on downstream properties or receiving water bodies and that the conveyance of
flows will be in a safe manner with minimal risk of human endangerment as well as the following
objectives:
Address the need for stormwater quantity control measures.
Ensure there is no actional impacts from the subject site for events up to and including the 1% AEP
event.
Ensure proposed quantity control measures detain and convey flows in accordance with QUDM
(2017) minimum freeboard recommendations.
5.1 Proposed Development and Associated Issues
In this development, the developable site area leads to negligible increase in peak flows downstream
of the subject site and is located close to the downstream waterway being Weyba Creek, hence in
the lower portion of the regional catchment. It is anticipated that the bio-retention drainage system
will allow for infiltration on-site of the additional flows which will permeate into the sub-surface strata,
hence it is considered unnecessary to include provision for stormwater quantity management.
6 STORMWATER QUALITY ASSESSMENT
6.1 Treatment Objectives
This assessment identifies issues relating to stormwater quality runoff and assesses possible
methods of treatment if required. The aim of this section of the report is to determine practical
approaches for achieving improvements in the quality of the stormwater run-off from the site that can
be readily implemented.
The SPP 2017 proposes criteria which apply to ‘high-risk’ development for stormwater. The criteria
include one or more of the following:
A Material Change of Use (MCU) for an urban purpose which involves greater than 2,500m2 of
land that:
will result in an impervious area greater than 25% of the net developable area; or
will result in six (6) or more dwellings
A Reconfiguration of a Lot (ROL) for urban purposes that involves a land area greater than
2,500m2 and will result in six (6) or more lots; or
Operational works for urban purposes that involve disturbing more than 2,500m2 of land.
The proposal includes an MCU for a land area of 2,500m 2 that will result in impervious area greater
than 25% of the developable area. Hence, the development is classed as ‘high risk’ for water quality
and the SPP 2017 applies.
The SPP 2017 suggests the development aims to:
Avoid or otherwise minimises adverse impacts on the environmental values of receiving waters,
arising from:
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 12
Section 13
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
altered stormwater quality or flows, and
wastewater (other than contaminated stormwater and sewage), and
the creation or expansion of non-tidal artificial waterways, and
Demonstrate compliance with the SPP code - Water quality (Appendix 3).
Appendix 2 (Table B) of SPP 2017 suggests ‘Post Construction Phase – Stormwater Management
Design Objectives’ as:
Table 2 - South East Queensland (SEQ) Targets
Total Suspended Solids Total Phosphorus Total Nitrogen Gross Pollutants
(TSS) (TP) (TN) >5mm
80% Removal 60% Removal 45% Removal 90% Removal
Along with the SPP 2017, The Noosa Plan 2020 Water Quality and Drainage Code acceptable
outcome AO6.1 states that;
Stormwater runoff discharging into High Ecological Value waters as a result of development causes
no increase in gross pollutants, total suspended solids, total phosphorous or total nitrogen compared
to a pre-development scenario.
Since the development site slopes toward and discharges to Weyba Creek, no pollutants compared
to pre-development can be discharged from the site.
The objective is to provide the following:
Nitrogen and Phosphorous removal
Gross Pollutant and Suspended Solids Removal
All of the site’s impervious areas discharge to suitable treatment device/s
Treatment device selection criteria are to be in accordance with Industry Best Practice and,
WSUD Engineering Guidelines
6.2 Site Analysis and Design Strategy
6.2.1 Pre-Development Phase
An Erosion Hazard Assessment has been carried out for the proposed development – refer to
Appendix F for a copy of the completed Noosa Shire Council form. As a result of this assessment,
it was determined that the overall site is a ‘low’ risk.
Prior to construction commencing, the following erosion and sediment control measures will need to
be installed around the subject site to minimise disturbance and ensure the quality of runoff
discharging from the site is of an acceptable standard:
Sediment barriers to be installed on all entrances to downstream stormwater infrastructure (i.e.
gully pits);
Designation of transport routes through the site to minimise vegetation disturbance;
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 13
Section 14
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Maximise retention of existing vegetation to reduce soil disturbance and provide filter strip
treatment for runoff;
Install construction entry and exit shakedown areas;
Sediment fences are to be installed on the downstream boundaries of the subject site; and
Install dust control measures as required.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
Further to the above considerations, it is the developments intent to limit ground disturbing activities
to a minimum. Other than a portion of the carparking area, all structures and footpaths are proposed
to be suspended over the existing surface.
6.2.2 Bulk Earthworks Phase
During the bulk earthworks phase, the following erosion and sediment control measures will need to
be installed in addition to the aforementioned measures (Pre-Development Phase) to ensure there
is minimal disturbance to downstream receiving water bodies:
Construction chutes to control runoff over earthworks batters;
Construction of temporary bunds at the top of all earthworks batters to ensure runoff is directed
away from exposed batters;
Sediment basins to be constructed at low points within each stage of the proposed development;
Sediment fences to be installed on the downstream side of any stockpiles; and
Stabilisation of all batters upon reaching the finished earthworks levels.
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.3 Construction Phase
During the construction phase of the development, there is a risk of sedimentation transport due to
disturbed land. The following erosion and sediment control measure will need to be installed in
addition to the aforementioned measures (Pre-Development and Bulk Earthworks Phases) to ensure
there is minimal disturbance and the quality of runoff is maintained to an acceptable standard:
Construction of temporary diversion drains to divert water to sediment basins;
Construction of temporary diversion drains to divert water to protect bioretention and treatment
devices as required;
Sediment barriers to be installed on all entrances to newly constructed stormwater infrastructure
(i.e. gully pits);
Sediment fences to be installed on the downstream side of any stockpiles and batters; and
Re-vegetation of all disturbed areas within two (2) weeks of completion.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 14
Section 15
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
All erosion and sediment control measures are to be designed and installed in accordance with IECA
Guidelines. Further details regarding the proposed erosion and sediment control measures will be
provided during the detailed design phase of the development.
6.2.4 Maintenance
All erosion and sediment control devices are to be maintained through the entire phase of the
development leading up to the operational phase. Erosion and sediment control devices will need to
be monitored closely throughout the entire project to ensure they are operating correctly and
efficiently. No erosion and sediment control devices are to be removed unless otherwise authorized
by a suitably qualified engineer or the site superintendent.
6.3 Operational Phase Treatment
Once directed to be commissioned by the superintendent and engineers, the Stormwater Quality
Improvement Devices (SQIDs) will provide the required level of stormwater quality treatment to runoff
from the site. It is expected that sediment laden runoff and the erosion potential at the subject site
during the operational phase will be minimal. This is due to impervious developed areas in the form
of roofs, driveways and carparking. It is understood that the footprint of these impervious areas has
been reduced as much as practicable. The proposed landscaped areas will be maintained in a
manner that will minimise erosion.
Existing grassed and proposed landscaped areas will be maintained in a manner that will minimise
erosion, some of which would be subject to erosion of topsoil from garden beds, erosion of soil from
behind retaining walls, etc.
6.4 Stormwater Quality Improvement Devices (SQIDs)
A stormwater treatment train has been established to treat the runoff from the proposed development
that includes the developable works area only (impervious carparking and units). The remaining
catchment consists of heavily vegetated landscaping. The proposed treatment train will enable a
higher level of pollutant removal efficiency by using stormwater quality improvement devices
(SQIDs). Maintenance of the SQIDs will be the responsibility of the owners of the development. The
maintenance should be carried out in accordance with the Council and Noosa RACV Resort
recommendations.
6.4.1 First Flush Device
First flush device/s to divert initial flows (first 12mm of rainfall or hose-down) to the vegetated
area.
The initial runoff from the site’s roof area will be directed to the non-disturbed vegetated areas via a
first flush device/s. This will ensure that accumulated loose material collected in the initial roof runoff
during a rainfall event is collected and diverted to landscape/garden areas before flows enter the
rainwater tank. A first flush device has a set limit on its capacity to convey flows. Once the initial
runoff from a rainfall event meets this capacity of the first flush device, the remainder of flows for the
event are diverted to the Lawful Point of Discharge.
6.4.2 Bioretention Basin
A minimum 30m2 surface area bioretention basin.
Bioretention basins remove contaminants and sedimentation from stormwater runoff via infiltration
through layers of soil media. The basin is made of a 400mm filter media layer, a 100mm transition
layer and a minimum 200mm drainage layer located above the silty sand sub-strata. The basin is to
be vegetated, as per the landscape architect’s recommendations or with suitable plants listed in
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 15
Section 16
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Table 19 of the Bioretention Technical Design Guidelines (Water by Design, 2014). These plants
provide additional treatment and will prevent clogging of the basin. Runoff within the bioretention
area gradually infiltrates the soil layers, assuming the in-situ soil of the area is sand. This assumption
is based on the neighbouring Geotechnical Report (Refer Appendix I) undertaken by Coffey
Geotechnics for the Noosa Sanctuary Project, which states that the site location has sandy soil
texture up to a minimum depth of 10m. It is recommended that a hydraulic conductivity test be
performed by an experienced geotechnical engineer at the detailed design phase to confirm the soils
permeability and infiltration capability.
6.5 Rainwater Harvesting – Reuse Minimum Sizing of Rainwater Tank
To satisfy Council’s code performance outcomes by reducing the need for mains water, the roof area
is to be connected to a rainwater tank with a minimum capacity of 5,000L in accordance with
Department of Housing and Public Works MP4.2 – Rainwater Tanks and Other Supplementary Water
Supply Systems. For the eight proposed cabins this equates to a total rainwater tank volume of 40
kL. Each rainwater tank is to be plumbed to be available for outdoor cleaning, washing machines
and toilet flushing in accordance with Council’s WSUD Planning Scheme Policies.
6.5.1 Internal Demand
To calculate expected internal demand, the following assumptions were made:
Toilet requires 25 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Laundry requires 21 L/day (per person) in accordance with Table 4.4 of the MUSIC Modelling
Guidelines 2010;
Peak occupancy of two (2) people per dwelling for the proposed 16x 2-bedroom units for the
holiday accommodation in accordance with Table 4.3 of the MUSIC Modelling Guidelines 2010.
Based on these assumptions the required volume for the internal demand component of the
rainwater tank is calculated as;
25 L/day (per person) + 21 L/day (per person) x 2 people per dwelling (peak) = 92 L/day
Daily demand (representing indoor use) = 92 L/d * 16 units = 1,472 L / day = 1.472 kL / day
6.6 MUSIC Model
The sites stormwater run-off for both the pre and post development were modelled using MUSIC
(version 6.3.0) and the water quality objectives for South East Queensland specified in the SPP 2017
of 80% TSS reduction, 60% TP reduction, 45% TN reduction, and 90% Gross Pollutants reduction.
Since the site slopes toward Weyba Creek which is a High Ecological Value waters, the post-
development pollutant discharge cannot be more than that of the pre-development discharge
according to The Noosa Plan 2020 Water Quality and Drainage Code.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 16
Section 17
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Figure 4 – Treatment Train for Pre-Development
The treatment train effectiveness and residual loading of the above MUSIC model are presented in
Figure 5.
Figure 5 - Results for the Pre-Development Model
Figure 6 - Treatment Train for Proposed Development
The treatment train effectiveness and residual loading of the post-development MUSIC model is
presented in Figure 7 and Figure 8.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 17
Section 18
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Figure 7 - Results for Post-Development Model at Bioretention Basin (Infiltration Node)
Figure 8 - Results for Post-Development Model at Receiving Node
As shown above in Figure 7, a significant pollutant reduction is shown at the bioretention basin node.
Figure 8 illustrates that the total suspended solids, total phosphorus and gross pollutants will have a
significant decrease with the implementation of this stormwater quality improvement device, being the
bioretention basin. A slight increase (3.4% or 0.09 kg/yr) in total nitrogen is found in the post-
development scenario when considering the receiving node and the existing surrounding vegetated
surface.
Based on a Geotechnical Report undertaken by Coffey Geotechnics for the Noosa Sanctuary Project,
the site location has sandy soil texture up to a minimum depth of 10m, which we predict enables the
site to infiltrate runoff. Since the majority of the stormwater runoff from the roof will be re-used by the
rainwater tanks and the rest of the runoff is intended to infiltrate onsite through the bio-basin, no
discharge will be proposed from the site. It is recommended that a hydraulic conductivity test be
performed by an experienced geotechnical engineer at the detailed design phase to confirm the soils
permeability and infiltration capability.
Currently it is assumed that a silty sand sub-strata will have a hydraulic conductivity of approx. of
4 × 10−6 m/s, for a 30 m2 bioretention basin infiltration area, this equates to a yearly capacity of 3,784
𝑚3 /yr which exceeds the infiltration rate of the receiving node being 2.9 ML/yr (2,900 𝑚3 /yr). It is
therefore understood that the existing subgrade will have sufficient capacity to infiltrate all treatable
flows with no additional stormwater infrastructure required to be implemented to the downstream
waterway.
Details of the MUSIC model are attached within Appendix H for further information.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 18
Section 19
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Refer to Appendix C for the Preliminary Layout Plans prepared by ADG.
6.7 On-site Treatment Lifecycle Costs
A lifecycle cost analysis is not a part of the scope of this report. All the recommended water quality
treatment infrastructure lies within the development site and it shall be maintained and serviced by the
owners of the development at no cost to Council.
6.8 Water Quality Monitoring
No water quality monitoring is proposed for this development at this stage due to the nature of the
development and the expected pollutant levels.
6.9 Maintenance
Maintenance of the SQIDs will be the responsibility of the owners of the development. The
maintenance should be carried out in accordance with the manufacturer’s recommendations.
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 19
Section 20
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
7 CONCLUSION
In preparing this report, we have achieved all requirements for Site Based Stormwater Management
Plans as described in the State Planning Policy (2017), Noosa Shire Council Planning Scheme
Policies, Queensland Urban Drainage Manual (QUDM) 2016, Plumbing and Drainage Code
AS3500.3 and Australian Rainfall and Runoff Guideline (ARR).
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA Page 20
Section 21
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Appendix A
Site Survey
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Section 22
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 23
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 24
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 25
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 26
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 27
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 28
Skyline Surveyors
Suite 11C
Brightwater Corporate Centre PHONE
07 5493 4877
69 Attenuata Drive
MOUNTAIN CREEK QLD 4557
E: [email protected]
W: www.skysurv.com.au
Section 29
Section 30
RACV Noosa Resort: 94-142 Noosa Drive, Noosa Heads
ADG Ref: 22366 C R10 Rev04 14.12.22.docx
December 2022
Appendix B
Architectural Drawings
BRISBANE / DARWIN / GOLD COAST / HOBART / MELBOURNE / PERTH / SUNSHINE COAST / SYDNEY / TOOWOOMBA
Section 31
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 20/06/22 CONSULTANTS REVIEW ZT
B 24/10/22 DA RFI ZT
C 28/10/22 DA RFI ZT
D 10/11/22 DA RFI ZT
E 15/11/122 RFI ZT
F 02/12/22 RFI ZT
G 05/12/22 RFI ZT
1
A65-07
30 SQM BIO
10m WIDE RETENTION
FIRE BUFFER AREA
MANAGED ZONE
RL 10.410
18 CARPARKS
CABINS 1 & 2
UP
100
00 EMT X
1825
EMT B
LINE
NG
LDI
RL 11.022
BUI
CABINS 15 & 16
3
1 A65-09
A65-09
RL 10.730 CABINS 3 & 4
RL 11.022
EMT A
CABINS 13 & 14
LOT 3
0
400 RL 11.367
2 CABINS 11 & 12
A65-09
CABINS 5 & 6
RL 11.367
RL 11.640
CABINS 9 & 10
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
CABINS 7 & 8 60
00 BOAQ 4487
RL 11.810
BUILDING DESIGNERS
ASSOCIATION
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
CONCEPT DESIGN
@
142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
DRAWING TITLE
SITE PLAN
N DATE SCALE @ A1 DRAWN CHECKED
05/12/22 1 : 250 AS TB
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 21-0910_ A10-01 G
Section 32
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 25/03/22 TREE SURVEY UPDATES ZT
B 19/04/22 REVISION A ZT
C 29/04/22 SITE REVIEW TB
D 28/10/22 DA RFI ZT
E 15/11/122 RFI ZT
TR294
TR375
TR321 10 8°
50'
TR313 447
TR314
7..1
1115
5
TR320
TR292 12.4
00
TR 319 TR318 TR312 TR311
TR322
TR374 TR315 TR301
TR317 TR 310
TR298 297 TR293 TR291
TR316 TR299 TR
TR323
TR300
TR324 TR309
TR325 TR296
TR1
14
.914
TR336
27.9
54 TR290
27
TR 30
TR327 30
29
TR2
.529
TR
TR328 TR337
28.5
TR326 TR308 TR303
28
TR335 TR 302 TR295 TR284
TR373 TR330 TR6
TR329 TR286
TR307
TR283
TR333
TR338 TR3
TR306
TR285
TR331 T9 855
8
TR4 17.9
TR332 TR282
TR334 TR281
TR288
TR280 TR275
66.2
TR202 TR5
.266
TR7
44
TR276
TR339 TR277
TR200
TR340 TR287
TR342
TR346 TR198
3399
TR289 TR196 TR8
.8.8
TR195
9944
TR278 TR197
58
32
.19
TR273
1°
TR279 TR188
5
29
TR372 TR344
'23
TR189
"
TR341 TR 343 TR190 108°50'
TR192 5 6..1
56
TR 1
19 14
40
0
TR345 TR271
TR272 TR201
TR270
TR274 TR187
99.6
.699
88
TR193 TR9
111.
1.3377
TR347
66
TR186 TR10
TR194
CABINS 1 & 2
TR269 TR199
TR11
TR369
TR370
TR268 UP
44.2
TR12
.255
88
TR184
TR371 TR209
TR203
TR368
TR208 TR13
TR206
22.9
TR267
.944
5.237
TR178
00
5.237
TR183 2
TR207 TR181 TR15
TR204 TR18
TR266 TR14
TR179 10
10 8°
8°50
50''
TR180 2 3.23
23 .230
0
TR205 TR19
TR210 TR16
TR185
4.858
4.858
TR366 TR213 TR175 TR20
TR174
TR212 TR177 TR21
TR211
TR170TR1172
CABINS 15 & 16
TR17
TR365 TR163TR164 TR173
TR18 TR17
TR367 TR167 TR169
TR215 TR165 TR176
TR214 TR162
TR166
TR364
TR168
TR23
TR22
TR216
TR218
12A
TR154
77
TR161
.255
99.2
TR217 TR219
TR265 TR159
TR263 TR158 157 TR153
TR264 TR
TR220
TR160
TR151 TR152
CABINS 3 & 4
TR24
TR221 TR156
TR150
TR25
TR363 TR149
TR155
6
""
.8006
TR148
'1'155
TR147
2233.8
Section 33
°388
55°3
TR262 TR146
2200
TR227
CABINS 13 & 14
TR222
TR362 TR228
3
.4993
TR226
99.4
TR229
TR223 TR230
TR225
TR145
TR26
TR233
TR224 TR144
TR361 TR231
TR234 TR232
TR235
TR238
TR261 TR237
TR236
TR241
4.320
4.320
TR143 TR27
TR239
TR240
TR260
TR28
TR259 TR242
TR244
TR258 TR245
TR360 05
0.5 "
'50
6.4
1
6.456
02
6°
TR243
56
23
TR246
T7
TR247 TR140 TR29
TR358 TR30
TR141 TR139
TR248
TR249 TR142
341°2
49.7
TR137
36
CABINS 11 & 12
7'25
TR138
"
TR 250
TR33 188
.91 "
TR357 99.9 0'2'20
6.245
6.245
TR251 TR31 8°
3
TR34 22
TR252
TR136
TR253 TR 35
TR32
SPECIES LEGEND TR359
TR254
TR36
TR356
A. DEAD TR255
TR135 TR 38
TR37
B. UNIDENTIFIABLE
CABINS 5 & 6
""
88
'4'455
.911
99.9
°100
77°1
2200
TR39
TR134 TR40 TR41
1. PANDANUS CABINS 9 & 10 T5
6.136
17A
TR133 6.049
2. BROAD LEAFED PAPERBARK TR355 T1
42
TR42
TR
3. SWAMP MAHOGANY
TR256
4. CHEESE TREE TR354
TR43
TR132
44
TR44
TR
5. WATTLE TR257
1300
TR13
TR
'10"
183°46'10"
13.020
13.020
183°46
6. CAMPHOR LAUREL 1299
TR12
TR TR 1288
TR12 TR131
TR45
1277
TR12
TR
7. PICCABEEN PALM
TOOWOOMBA | BRISBANE | MOOLOOLABA
8. WEEPING LILLY PILLY 47
TR47
TR www.aspectapm.net
1266
TR12
TR
46
TR46
TR ABN 96 071 786 948 ACN 071 786 948
1244
TR12
TR
9. FOREST RED GUM 1255
TR12
TR
BOAQ 4487
1233
TR12
TR
10. BEACH BIRDS EYE TR353
CABINS 7 & 8 TR48
51
TR51
TR
11. TALLOW WOOD TR 50
TR50
BUILDING DESIGNERS
ASSOCIATION
TR349
GENERAL NOTES
12. MACARANGA THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
13. TUCKEROO TR49 SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
TR352
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
14. BLUEBERRY ASH IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
3341
41°2
32
°2 7'
7'25
25 "
"
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
15. CADAGHI
°°00 722
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
87
5""
6..8
Section 34
'25
336
55'2
244
TR350 DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
222
TR348 TR122 NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
16. MAGENTA CHERRY PERMISSION OF ASPECT .
PROJECT
17. QUANDONG SPECIES TR121 TR52
RACV NOOSA RESORT - ECO
TR351
18. BRIBIE ISLAND PINE
T6
RESORT
1200
TR12
TR FOR
TR54
19. SOAPY/ RED ASH
TR114
TR115 ROYAL AUTOMOBILE CLUB OF
20. PINK EUODIA TR 1166
TR11
1188
TR11
1177 TR
VICTORIA
TR11
TR
CONCEPT DESIGN
TR53 @
TR102 TR119
TR55 142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
DRAWING TITLE
TR103
TR104
TR56
TR57
TREE SPECIES PLAN B
N DATE SCALE @ A1 DRAWN CHECKED
15/11/122 1 : 250 AS TB
DRAWING No. ISSUE
1:250
0 2 4 6 8 10 20 21-0910_ A10-04 A E
[OCR of page images]
SPECIES [email protected]
O
B. UNIDENTIFIABLE
1. PANDANUS
4. CHEESE TREE
5. WATTLE
7. PICCABEEN PALM
9. FOREST RED GUM
10. BEACH BIRDS EY
11. TALLOW WOOD
12. MACARANGA
13. TUCKEROO
14. BLUEBERRY ASH
15. CADAGHI
18. BRIBIE ISLAND PI
19. SOAPY/ RED ASH
®eeoeeeseeeeeeeoeeveeevoe @ @
20. PINK EUODIA
2. BROAD LEAFED PAPERBARK \
3. SWAMP MAHOGANY
6. CAMPHOR LAUREL a
8. WEEPING LILLY PILLY
16. MAGENTA CHERRY
17. QUANDONG SPECIES
“CABINS 1 & 2-7)“
t ~
)\
yg I!
=p CABINS 1
| @- } i
r HL iS
“CABINS 11
E { Ques
. K
ii
CONCEPT DESIGN
IMPORTANT:
ALL DRAWINGS MUST BE READ IN CONJUNCTION WITH
THE GENERAL NOTES SHEET
AMENDMENT SCHEDULE
ISS DATE DESCRIPTION BY
A 25/03/22 TREE SURVEY UPDATES ZT
B 19/04/22 REVISIONA ZT
C 29/04/22 SITE REVIEW TB
D 28/10/22, DARFI ZT
E 15/11/122 RFI ZT
ASPECT
A
TOOWOOMBA | BRISBANE | MOOLOOLABA
www.aspectapm.net
ABN 96 071 786 948 ACN 071 786 948
BOAQ 4487
we Ol!
Australian
‘tute of
chit
st
institute of [UMMM BUILDING DESIGNERS
Archi
itects
GENERAL NOTES
THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
‘SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS’ LIABILITY
IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
DRAWINGS ARE PROTECTED BY THE LAWS OF COPYRIGHT AND MAY
NOT BE COPIED OR REPRODUCED WITHOUT THE WRITTEN
PERMISSION OF ASPECT .
PROJECT
RACV NOOSA RESORT - ECO
RESORT
FOR
ROYAL AUTOMOBILE CLUB OF
VICTORIA
@
142 NOOSA DRIVE, NOOSA HEADS
QLD 4567
DRAWING TITLE
TREE SPECIES PLAN B
DATE SCALE @A1 DRAWN CHECKED
15/11/122 1:250 AS TB
DRAWING No. ISSUE
21-0910_ A10-04 A E
The text continues on section 35.
Used in these records
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.