Council archive · source document
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (46.0 MB): may take a few minutes to open.
Original PDF page 105, section 1. The text section number identifies this passage in the reader.
Jum Ue
BATE 7E.07
LE.
RAME TITLE. BOREAOL
A
ERTREVEGLE TEMPLATE Fre: COFFEY.GOT
OTES+Y
SRARY Fi_E: COFG:
TEAAGFI LI
PROJECT FI_E: GK:
72
For GEG 3 3 Issue 3 Fi
ue
Uti otP
coffey
&.. .
“# geotechnics
Borehole No. BH30
. - Sheet 2 of 2
Engineering Log - Borehole ProjectNo:__ GEOTKPARO1178AA
Client, HUTCHINSON BUILDERS Date staned: 2.6.2007
Principal: Data completed; 2,6.2007
Project: NOOSA SANCTUARY Logged by: uu
Borchole Location’ REFER PLAN Checked by: a
Urill modal and maunung: GCH 200 TRUCK MOUNTED Lasting: slop, -80° RL, Surface: NOT MEASURED
hala diameter: 106 mm Northing bearing: datum:
drilling information material substance
s
A c =x
xd notes o
5 samples, Be material of structure and
gl 2 al toate wie 2 s 3 a5 additional obsorvations
a] & |g18 aopth| & | BF xol type: plasticity of particle characteristics, 5 2
Btaog]@ § RL imeved oo | O colour, socondary and minos components. u
Ss M SAND: line lo mueschuin graincd, pale brown, wih W DB
some sik. (conanued) 4
“TSULTY SAND: {ina 10 course qrained, grey, with VD 7
somo clay. J
SPT ~)
1/600mm 7
N'SR 4
SILTY CLAY: high plasnelty, dark grey, VE 7
YY 3 7
uso GY 4
Ty 4
WY -
12
44 4
us0 4 Y CH | SANDY CLAY; high plasiicity, giey. St RESIDUAL
13
Borshole BN3O terminaled at Tam
14] J
13 4
16
Test Od Suppor Consistency/density incon
As auger Berewng” Mond N nit 1 notes, samples, toots classification symbols and ve very worl
AD suger eriteryg® © caning Ure undigtuibud suinpe SOmm aiamalne | goit aazaription Ss zon
RR rofferariconn Penetration Ue undistuibed sampin Gamm diameter paced on) unified classification r _
w wnshhnre 23 4 D crnturbad sampla st slit
HA ee = mong N slandiant panalralion lost (SPT) ore vst vory sit
HA hand nnger rofusal Nt SPT - aampie tecavered Taaleture H trad
oT diatube ‘water Ne SPY wath nal cane, o ay bb inanin
R blank bit LX 100s vaatnr aval v vané swat (kPu) Momais ML vory hosed
v vb oa faker ssh P piuseprenutur Wowet Le loose
1 TC Bil Ls bulk sampia lati Tl Mo median done,
“bil Shown by suffix Pe watar inflow & sawic@ontiunital sump we tue al D dense
eg. Ant AE wrster cuttin R refused ‘ VD vary Garest
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.