Council archive · source document
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (46.0 MB): may take a few minutes to open.
Original PDF page 107, section 1. The text section number identifies this passage in the reader.
4un Ul Uf UT OTP p.14
coffey 2 geotec h n | cS Borehole No. BH35
Engineering Log - Borehole rae GEOTKPAROIITAAA
Project No:
Client HUTCHINSON BUILDERS Date started: 16,.5.2007
Principal; Data completed: 16.5,2007
Project; NOOSA SANCTUARY Logged by: ™
Borehole Location: REFER PLAN Checked by:
drill madel anu mounting: JACRO 350 Epstng: slape! ~90° RL. Surface: NOT MEASURED
hale diameter: 100 mm Northing baaring: datum:
Grilling information material substance
: notes 5 axles.
samples ee matarlal | PRP see structure and
gw[ Bie ellie ele vo {8 3 es) es} an? additional obsarvationa
x 5 . 5] ae iy a
a| & jas apn] 2] 2E Sol typo: plasticity or panile churstteristics, ae alae
5 Elao5|# RL en al oF colour, svoondary and mmor components, £8 U/l eeks
Ss . SN“ PSICTY SAND, fino to madum pramed, Prown, Ww Yo
# feonpnued) 4
<=
a 4
ui 4
“i
oS
x -|
ig
& —
2 S| SILTY CLAYLY SAND; ine fo medium graned.
é gray, with bands of randy clay, clayey sand.
Q SPT 7
e 45,4 J
a N&O 74
8 “5 a
tu EZ CH | SILTY SANDY CLAY: high plusticity, gray. 5 RESIDUAL
5 vs GZ Hi :
& h0-160-120} - WY -
a
~ GB 4
i iY J
i Y 7
g - Yj 4
a 4 4
5 12} Y 4
g Ye, PT) | pp-2s0KP
5 2 -4
u
5 Borehole GHIS terminated at 12.4m
5 "
B 4 +
5 13] =
o 4
uj 4
S 4 |
& 4
é 1
. 14 i
3 4
oO . 4
3 4 =|
6 4 J
4 18, 4
= 2)
~
& 4 |
a
Oo 4 “4
oe
m ~q
16
erethod Support conenstoncy/donuity index
AS ugar aciewing? M mud N all notes, samph clnzsinantion ayribats and va vary sat
AD amagar cnling? © sealing Usp ndinturtind sampla 50min digrmeler | soll description s Bal
Sy Rr eniloctitlosres pogotration Us undisiurbed sumuie 6mm diamntar | pasar an unified cleseification ts , tur
at Ww washbora a4 7 D Uslurbad sampin systam a
sl ct enbin too eo fale N mandard penatration sagt (SPT) vst very sti
ta hand auger smh nN SPT- sample recovered molstura a bie
ahar distal water Ne SPT with solid cons aay rb felobia
aps Ditnk bil YY 103 waterieval | Vv vane shnar (kPa) M moist ML very loose
oly Vint == an sain snewn B w sowal L b lwoue
& 7
al? TC tt | Hs i neg lint Mi madi Anns
ef show by sett Pe water inflow c efivionmantal sampla ve anes Dn gens
Bf ea AD —<€ wale puttinw R refusal vD very Uses
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.