Jun O7 O7 04:54p p.16
coffey ep geotechnics
Engineering Log - Borehole rei GEOTKPAROTITBAA
Borehole No. BH36
Project No:
Client: HUTCHINSON BUILDERS Date started: 17,5.2007
Principal: Data completed: 17.5.2007
Project: NOOSA SANCTUARY Logged by: T™ 5
Borehole Location: REFER PLAN Checked by: db
drill model and maunting! JACRO 350 Easting: slope: +30" R.L, Surface: NOT MEASURED
holo diamotor: 100 mm Nofhing bearing: datum:
Grilling information material substance
=
& <
iz notes 8 material structure and
Ble samplos, g 8 g additional observations
8 5 x yy | fests. ote = 2
3 S| wy éepih} Boil type: plaatclty of pavticla characteristics, 2
gy é 123] 4] 4 RL jmeveeq] ™ colour, secondary and minor components. @
x SILTY SAND: Tine to medium grainod, groy, W B
iJ brown. (continued) “
6S 4
¥ MD 7
4
w
% onal
a SPT
tai 3,5,4 7
E Neo 4
= t
w 4
“ 10 TH | SANDY CLAY: high plastoity, grey. F RESIDUAL
8 Y 4
Fa PPogokPs
rd . 4 Y 7.
8 uso 4 Y 4
a 4
Fy vs WG 4
4 §0-30-20
a 4 -
&
w + St 4
ai 4 4
3 4 Y Vit +
5 wy
x PP=200KPa
&
& 4 -
= =
x 4
SG -
y 4 Borehole BH36 terminated at 12.5m 4
3
uy 4 4
is 13
o — 4
ao
au 4 -
a
= - 4
>
nd 4 |
e
a 2 4
_
= 14
n
8 . 4
x
= 4 4
g 7 7
6 4 4
a
Z 154 4
it
5 - 4
BM
3 4 -
%
Ee 4 4
16
mathe Baap part ‘oonsistenay/donelty tnciax |
AS augor scrowing* Mo mud Non notes, sampios, toxts clagsification aymbols pia VS vory cof |
ag Algor dlling* c casing Lbs undturbnd samplia 5omm chamator soll description 8 soll i
SP RR vollenitricites ponstration Una undistuded saripla 6am diamelar based 04 unified classiticanon we !
a) w washhora 7 aA B tsiohurtiecs campie . 5 si i
a at sysiam -
wa} CT cable toot Eat mogieg a N nctam p an asl (S#T) vi very sutt
Sy A Juan auger Wi No SPT - sample rocoversd rrolature 4 hora
Oot amtunn, water Ne SPT with cali cana Body Tb ifable i
way? Hiank hil YY 18/1708 watnr lover v vane: shane {kPa} Momont vi very loose |
ol v Veit Se aniiain shown P prassummeter wwe . tees :
alt TG hit . Oe yulk exunpie. Wo plastic imi ay medium dans
p. | "DU shown by sutfic be writer inflow L enviranmental sample Wa, ligule fini D gonon
Ep ao. ADT a watar outtiows R rattan vo very danse
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.