Council archive · source document
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG · MCU22/0118
Plans and drawings: the text below has words only, no drawings.
Very large file (46.0 MB): may take a few minutes to open.
Original PDF page 32, section 2. The text section number identifies this passage in the reader.
°388
55°3
TR262 TR146
2200
TR227
CABINS 13 & 14
TR222
TR362 TR228
3
.4993
TR226
99.4
TR229
TR223 TR230
TR225
TR145
TR26
TR233
TR224 TR144
TR361 TR231
TR234 TR232
TR235
TR238
TR261 TR237
TR236
TR241
4.320
4.320
TR143 TR27
TR239
TR240
TR260
TR28
TR259 TR242
TR244
TR258 TR245
TR360 05
0.5 "
'50
6.4
1
6.456
02
6°
TR243
56
23
TR246
T7
TR247 TR140 TR29
TR358 TR30
TR141 TR139
TR248
TR249 TR142
341°2
49.7
TR137
36
CABINS 11 & 12
7'25
TR138
"
TR 250
TR33 188
.91 "
TR357 99.9 0'2'20
6.245
6.245
TR251 TR31 8°
3
TR34 22
TR252
TR136
TR253 TR 35
TR32
SPECIES LEGEND TR359
TR254
TR36
TR356
A. DEAD TR255
TR135 TR 38
TR37
B. UNIDENTIFIABLE
CABINS 5 & 6
""
88
'4'455
.911
99.9
°100
77°1
2200
TR39
TR134 TR40 TR41
1. PANDANUS CABINS 9 & 10 T5
6.136
17A
TR133 6.049
2. BROAD LEAFED PAPERBARK TR355 T1
42
TR42
TR
3. SWAMP MAHOGANY
TR256
4. CHEESE TREE TR354
TR43
TR132
44
TR44
TR
5. WATTLE TR257
1300
TR13
TR
'10"
183°46'10"
13.020
13.020
183°46
6. CAMPHOR LAUREL 1299
TR12
TR TR 1288
TR12 TR131
TR45
1277
TR12
TR
7. PICCABEEN PALM
TOOWOOMBA | BRISBANE | MOOLOOLABA
8. WEEPING LILLY PILLY 47
TR47
TR www.aspectapm.net
1266
TR12
TR
46
TR46
TR ABN 96 071 786 948 ACN 071 786 948
1244
TR12
TR
9. FOREST RED GUM 1255
TR12
TR
BOAQ 4487
1233
TR12
TR
10. BEACH BIRDS EYE TR353
CABINS 7 & 8 TR48
51
TR51
TR
11. TALLOW WOOD TR 50
TR50
BUILDING DESIGNERS
ASSOCIATION
TR349
GENERAL NOTES
12. MACARANGA THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH ALL
RELEVANT BUILDING CODES AND STANDARDS. NO AMENDMENTS
13. TUCKEROO TR49 SHALL BE MADE WITHOUT THE APPROVAL FROM ASPECT AND/OR
RELEVANT LOCAL AUTHORITY.THESE DRAWINGS ARE SUPPLIED ON
TR352
THE CONDITION THAT, IN THE EVENT OF ERROR, ASPECTS' LIABILITY
14. BLUEBERRY ASH IS LIMITED ONLY TO THE COST OF AMENDING THESE DRAWINGS.
3341
41°2
32
°2 7'
7'25
25 "
"
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON SITE BEFORE
15. CADAGHI
°°00 722
COMMENCING ANY WORK OR PRODUCING SHOP DRAWINGS. THESE
87
5""
6..8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.