Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                          COMMENTS
 PO5                                                              AO5                                                          Development will comply
 For reconfiguring a lot or operational works, development        In the Flood Hazard Overlay, or in areas otherwise
 does not directly, indirectly or cumulatively alter the flood    determined to be subject to the DFE or DSTE,
 characteristics external to the development site for all         development ensures:
 flooding and inundation events up to and including                        1. there is no loss of on-site flood storage
 the DFE or DSTE based on:
                                                                              capacity;
              1. current climate conditions; and                           2. all changes to level, depth, duration and
              2. incorporating an appropriate allowance for the               velocity of floodwaters are contained
                 predicted impacts of climate change.                         within the site for all flood events up to
                                                                              and including the DFE based on current
                                                                              climate and predicted impacts of climate
                                                                              change at 2100;
                                                                           3. there is no acceleration or retardation of
                                                                              flows, or any retardation in flood warning
                                                                              times, elsewhere on the floodplain and to
                                                                              any overland flow paths; and
                                                                           4. there is no increased stormwater ponding
                                                                              on sites upstream, downstream or in the
                                                                              general vicinity of the site.

 Resilient building design and form                               AO6.1                                                        Development will comply
 PO6                                                              Buildings are designed to integrate well with the street
 Development ensures that building design and building form:      level and the levels of adjoining properties to facilitate
          1. accounts for potential flood risk;                   pedestrian flows and visual and physical connectivity
          2. is resilient to flood events; and                    between the footpath and ground floors.




Page 4 of 9
June 2021

Log in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.