Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
necessary for access, and safe construction at any one
time.
AO14.3 To be complied with at detailed
For buildings: design / construction stages.
1. upstream runoff is diverted around
the construction site;
2. sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and waterways ,
wetlands or drainage lines either on
or off the site; and
3. temporary or permanent downpipes
are connected to the stormwater
system before laying the roof; or
4. Localized erosion is avoided by
directing flow from downpipes over
non-erosive areas.
AO14.4 To be complied with at detailed
Chemical flocculants used as part of an erosion and design / construction stages.
sediment control plan do not harm the environmental
values within receiving waters.
AO14.5 To be complied with at detailed
design / construction stages.
Page 10 of 12
June 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdfRelated documentApplication case desk ↗
About this file
- File size
- 46.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.