Original source · versioned page text
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG
Jum UF UF Us acPp p.2 coffey oe geotechnics SPECIALISTS MANAGING THE EARTH 6 June 2007 Hutchinson Builders Locked Bag 3002 Toowong Qid 4066 Attention: Wyatt Kennedy Dear Sir, RE: CENTRAL FACILITIES BUILDING, NOOSA SANCTUARY NOOSA DRIVE, NOOSA GEOTECHNICAL REPORT 1.0 INTRODUCTION Coffey Geotechnics Pty I.td (Coffey) was commissioned by Mr Chris Stevenson of Hutchinson Builders to undertake geotechnical investigations and analysis in order to determine the footing design parameters and Classification in accordance with AS2870 - 1996 for the central facilities building at the Noosa Sanctuary Development in Noosa Drive in Noosa. Itis understood that the proposed building consists of a two storey building above ground with 2 single storey tanked basement carpark below ground. 2.0 SITE DESCRIPTION The Noosa Sanctuary site is located at the toe of a dunal slope off the southeastern side of the mouth of Weyba Creek. It is bound in the south by Noosa Drive, in the north and west by the estuarine wetlands at the outlet of Weyba Creek and at the eastern end by an adjacent development. The earthworks on the site were previously undertaken under a Level 1 Overview conducted by Bowler Geotechnical The northern side of the site ig now level at an elevation of about RL 2.6 metres AHD. Bowler report that the uppar peaty soils were removed prior to the placement of fill and ali fill has been certitied as controlled fill in accordance with AS2870-1996. The building site lies between an access track and a lagoon on the site, The area is level with a cover of mawn grass. There are no trees in near proximity to the site. Coffey Geotechnics Pty Ltd ABN 93 056 929 483 GEOTKPAR1 T78AAVA 1/36 Kerryl Street Kunda Park QLD 4556 Australia PO Box 5537 Maroochydore QLD 4558 Australia T (+81) (7) 6445 4952 F (+61) (7) 5445 3764 www.coftey.com.au
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.