Original source · versioned page text
Attachment 7B - Site Based Stormwater Manamgment Plan by ADG
Jun O7 O7 O4:39p coffey? geotechnics SPECIALISTS MANAGING THE EARTH Important information about your Coffey Report As a client of Coffey you should know that site subsurface conditions cause more construction problems than any other factor. These notes have been prepared by Coffey to help you interpret and understand the limitations of your report. Your report is based on project specific criteria Your report has been devcloped on the basis of your unique project specific requirements as understood by Coftey and applies only to the site investigated. Project criteria typically include the general nature of the project; its size and configuration; the localion of any structures on the site, other site improvements; the presence of underground utilitins; and the additional risk imposed by scope-of-service limitations imposed by the client. Your report should not be used if there are any changes to the project without first asking Cottey to assess how tactors that changed stibsequent to the date of the report affect the report's recommendations. Coffey cannot accept responsibility for problems that may occur due lo changed factors if they are not consulted. Subsurface conditions can change Subsurface conditions are crealed by nalural processes and the activity. of man. For example, water levels can vary with time, fill may be placed ona site and pollutants may migrate with time. Because a report is based on condilions which existed at the time of subsurface exploration, decisions should not be based on a report whose adequacy may have been affected by time. Consult Coffey to be advised how tirne may have impacted on the project. Interpretation of factual data Site assessment identifies actual subsurface conditions only at those points where samples are taken and whon they are taken. Data derived from literature and external data source review, sampling and subsequent laboratory testing are interpreted by geologists, engineers or scientists to provide an opinion about overall site conditions, their likely impact on the proposed development and recommended actions. Actual conditions may differ from those inferred to cxist, because no professional, no mattcr how qualified, can reveal what is hidden by Coffey Geotechnics Pty Ltd ABN 93 056 929 483 earth, rock and time. The actual interface between materials may be far more gradual or abrupt than assumed based on the facts oblained. Nothing can be done to change the aclual site conditions which oxist. but steps can be taken to reduce the impact of unexpected conditions. For this reason, owners should retain the services of Coffey through the development stage, to identify variances, conduct additional tests if required, and recommend solutions to problems encountered on site. Your report will only give minary recommendations —_ Your report is based on the assumption that the site conditions as revealed through sclective point sampling are indicative of actual conditions throughout an areca. This assumplion cannot be substantiated until project implementation has commenced and therefore your report recommendations can only be regarded as preliminary. Only Coffey, who prepared the report, is fully tamiliar with the background information needed to assess whether or not the report's recommendations arc valid and whether or not changes should be considered as the project develops. If another party undertakes the implementation of the recommendations of this report there is a risk that the report will be misinterpreted and Coffey cannot be held responsible tor such misinterpretation. Your report is prepared for specific purposes and persons . To avoid misuse of the information contained in your report it is recommended that you confer with Coffey before passing your report on to another party who may not be familiar with the background and the purpose of the report. Your report should not be applied to any project other than that originally specified at the time the report was issucd.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 7B - Site Based Stormwater Manamgment Plan by ADG.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.