Original source · versioned page text
Delegated Report - Code - Planning RAL22 0016
Author Development Planner, Georgina Schramm Development Assessment APPLICATION DETAILS Application No. RAL22/0016, OPW22/0180 Applicant CP 125JS P/L TTE Proposal Development Permit for Reconfiguring a Lot – (1 Lot into 2 Community Title Subdivision), and Operational Works – Drainage Work, Stormwater, Earthworks & Landscaping Properly Made Date 30 September 2022 Information Request Date 30 September 2022 Information Response Date 14 November 2022 Decision Due Date 24 January 2023 Report Completed Date 23 January 2023 Report Reviewed By Nadine Gorton 30.1.2023 PROPERTY DETAILS Property Address 6 Wyandra St Noosa Heads Qld 4567 RP Description Lot 40 RP 139776 Land Area 599m² Existing Use of Land Dwelling house STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Medium Density Residential Precinct Not Applicable Local Plan Area Noosa Heads Overlays Landslide Hazard Bushfire Hazard Assessment Type Code PROPOSAL The application seeks approval for a Reconfiguring a Lot – Subdivision by Community Title Scheme (1 into 3 lots), and Operational Works – Drainage Work, Stormwater, Earthworks & Landscaping. Proposed Lot 1 is approximately 333m2, and proposed Lot 2 an area of 258m2, with common property of 8m2 along the common wall and fence line between the units. The proposed subdivision is to take effect come completion of the Material Change of Use (Dual occupancy). The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Proposal Plan Figure 3 – Approved Site Plan in association with MCU22/0058 Figure 4 – Proposed Landscaping Planting Plan site details Background The site until recently housed a single storey Dwelling House with Wyandra Street being the primary frontage. The site has two vehicle crossovers, the most northern appearing to be unformalized. A development permit for the purpose of a Material Change of Use - Dual Occupancy and Building Works for Demolition was issued 21 September 2022, subject to conditions, see Figure 3 for layout. The applicant has since acted on the development permit and has removed the dwelling from the site. Site Description The subject site is 598m2 with frontage to both Wyandra and Safari Streets. The land falls a total of 5 metres from the upper corner of the allotment to the Wyandra/Safari Street intersection Surrounding Land Uses Land adjacent to the site is park land, land north of the site is a single dwelling. The subject site and existing sites along Wyandra and Safari Street has been rezoned with the new planning scheme (Noosa Plan 2020). assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Medium Density Residential Zone Code; Noosa Heads Local Plan Code; Reconfiguring a Lot Code; Works Codes; Landslide Hazard Overlay Code. The subject site is located in Noosa Heads and is zoned Medium Density Residential. The proposed use is identified as a consistent use within the zone and is required to follow a code assessable application process. The application has been found to generally comply with all applicable statutory instruments. Reconfiguring a Lot Code PO27 Community title subdivision only occurs once construction of approved buildings on site is completed. PO29 Community title subdivision for residential purposes only occurs— where lots are located close to services and facilities; in the Low density residential zone, Medium density residential zone, High density residential zone, Tourist accommodation zone or Centre zone; where they are consistent with the character of the locality they are located in; if appropriate house site areas and car parking needs can be accommodated; where they are supplied with adequate infrastructure to meet the needs of users; where they minimise adverse effects on the environment; if they are of suitable shape and slope to minimise constraints to development; and if they are sufficient areas to provide reasonable amenity for users. The proposed subdivision is located on the corner of Safari Street and Wyandra Street. The proposed buildings on the premises address each respective frontage, which respective vehicle crossovers. With the site having dual frontage it lends itself to having an appearance similar to a single dwelling from each respective street, subdivision by CTS will not alter the character of the location the development is located in. The proposed lots are regular in shape and will have connection to appropriate services and infrastructure. The proposal complies with the Performance outcomes. Landscaping The material change of use development permit relating to the proposed operational works and subdivision included conditions relating to landscaping works and species substitutes. The applicant has since amended the landscaping plans for approval in conjunction with the operational works component of the application. Proposed landscaping works is consistent with the material change of use and complies with the Landscaping Code of the Noosa Plan 2020. cONSULTATION Referral Agencies Not Applicable Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Development Engineer – as conditioned. The proposed development sets out to demolish an existing residence and construct a duplex on a corner lot. Prior to this development approval, Council issued a Material Change of Use approval (MCU22/0058) for the proposed development on 21 September 2022. A site-specific Geotechnical Report has been provided as the site is encumbered by Council’s landslide hazard overlay. The recommendations have been incorporated into the proposed design. As part of a change to the zoning with The Noosa Plan 2020, Council have conditioned the construction of a 1.8m wide Wyandra Street footpath and a 1.5m Safari Street footpath to align with all active and future developments. Engineering believe that all relevant compliances can be achieved and recommend the following conditions be included. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No RAL22/0016 & OPW22/0180 for a Reconfiguring a Lot – Subdivision by Community Title Scheme (1 into 3 lots) situated at 6 Wyandra St Noosa Heads Qld 4567 and described as Lot 40 RP 139776, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: RAL22/0016 Street address: 6 Wyandra St Noosa Heads Qld 4567 Real property description: Lot 40 RP 139776 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Reconfiguring a Lot – Subdivision by Community Title (1 into 2 lots) Development Permit for Operational Works - Drainage Work, Stormwater, Earthworks & Landscaping CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions RECONFIGURATION OF LOT When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date - - Community Title Subdivision Plan prepared by Jack Lewis 7 December 2022 Currency Period This development approval lapses if the use has not happened by 30 January 2027 unless an application to extend the currency period is approved by Council. Boundary Encroachments Certification must be submitted to Council from a Licensed Surveyor which certifies that: the setback/s to any new boundaries for any existing buildings remaining on the site comply with the relevant provisions of the planning scheme and the Building Act 1975, unless varied by this Decision Notice all constructed access and roadworks (including associated fill batters and retaining walls) are fully contained within a dedicated reserve or registered easement all utility services and connections (eg. electricity, telecommunications, water, sewerage) are wholly located within the lot they serve or alternatively included within an easement all retaining walls and structures are fully contained within the lot they retain any fill, including fill batters, are wholly contained within the subject site and not on adjacent properties for the community title scheme, the road pavement changes required by this Decision Notice accurately demarcate the boundaries of the public and private land. Plan Sealing Prior to Council issuing the Plan Seal, all works described within this Decision Notice and the Higher Order approval MCU22/0058 must be completed and certified by a Council representative. OPERATIONAL WORKS APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 20220078-C20 D Bulk Earthworks Plan Prepared by RECOR 28 October 2022 20220078-C21 D Bulk Earthworks Section Prepared by RECOR 28 October 2022 20220078-C31 D Driveway Sections Sheet 1 of 2 Prepared by RECOR 28 October 2022 20220078-C32 B Stormwater Sections Prepared by RECOR 28 October 2022 20220078-C33 D Stormwater Catchment Plan Prepared by RECOR 28 October 2022 20220078-C30 D Roads and Drainage Layout Plan Prepared by RECOR 28 October 2022 22117-OPW-01 E Site Layout Plan, prepared by Element Design Landscaping Architecture 23 January 2023 22117-OPW-02 E Planting Plan (Ground level), prepared by Element Design Landscaping Architecture 23 January 2023 22117-OPW-03 E Planting Plan (Level 01), prepared by Element Design Landscaping Architecture 23 January 2023 22117-OPW-04 E Details Plan, prepared by Element Design Landscaping Architecture 23 January 2023 22117-OPW-05 E Plant Lists & Specification Plan, prepared by Element Design Landscaping Architecture 23 January 2023 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 30 January 2025, unless an application to extend the currency period is approved by Council. SITE SPECIFIC CONDITIONS Bonds A compliance bond of $10,000 is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be held once Council's Construction Engineering Officer has confirmation that the bond monies have been received by Council. The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. Bonds must: meet the requirements of council’s relevant Planning Scheme Policy for performance and uncompleted works. be calculated using a schedule of works and relevant bond equation include GST. have approval of the bond calculations and amount from Council prior to lodgement. be lodged with Council and accompanied by the Bond Administration Fee/s. be requested for release by writing to Council, when relevant approval requirements have been met. PRIOR TO COMMENCEMENT OF WORKS Engineering All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction Maintenance of safe vehicle and pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased Proposed fencing to the site during the construction phase of the development Adequate parking arrangements for construction workers Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice. The relevant conditions of the higher order Material Change of Use approval MCU22/0058 to which this approval relates. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines; The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserve/Reinstatement Safe vehicle and pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Pathways All pathways must be constructed in accordance with the following requirements: All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065. Provision must be made for disabled access at all kerb crossings associated with pathways, in accordance with Council's current standards. All paths must have a slip resistant surface Expansion and contraction joints must provide a flush finish. Installation of joints by saw cutting is preferred to ensure a smooth ride for cyclists The required work includes any modifications to ensure the footpath finishes flush with all existing service covers and the like, or alternatively these services are raised or altered, so as not to create a pedestrian safety hazard Pathways must: terminate in a manner that ensures smooth transition to existing surfaces for public safety be designed and constructed to comply with the Disability Discrimination Act (DDA), Access to Premises Standard, Austroads and relevant sections of AS1428 Design for access and mobility Site Access and Driveways Driveway crossovers must be constructed in accordance with council’s Standard Drawings RS-049, RS-050 and any associated addendum. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring properties Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing the Plan of Survey. Fall protection must be provided to retaining walls that are over 1m high. Slope and batters are a maximum grade of: 1 in 6 where in proximity to waterbodies 1 in 4 for grassed areas. 1 in 3 for planted areas 1 in 2 for combined structural engineering and planting solutions. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Erosion and Sediment Control Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection Regulation 2019) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system, natural waterways, any downstream stormwater filtration system or adversely impacting on other properties. The sediment and erosion control design and measures have NOT been approved, it is the site's Supervising Engineer who is responsible for ensuring that the sediment and erosion control measures have: Been duly designed by an RPEQ or CPESC and constructed in accordance with "best practise" methods, Been revised by an RPEQ or CPESC to address the issues raised by changes in the projected construction schedule and/or methods, Been revised to address predicted rainfall events, and Achieve the desired environmental outcomes. Council may request further controls to be installed should the implemented measures be found inefficient. The erosion and sediment control measures must be designed, installed and maintained in accordance with the supervising engineer instructions and the current best practice standards * (Refer to Advisory Note). The developer must ensure sediment does not leave the site or enter onto adjoining properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or machinery. It is essential to implement appropriate approved erosion and sediment control measures throughout the site during all phases of construction including vehicle shakedown pad/grid (or similar) at the access to the construction site. Where sediments or other contaminants are deposited on a road, they must be removed so as not to enter Council’s drainage system or waterways. Prior to the completion of the development and commencement of use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Landscaping Works Landscape works must be supervised, undertaken and certified by qualified persons*. All works must be completed in accordance with this Decision Notice. (* Refer to Advisory Note) Where damage occurs to any Council asset as a result of the development works, it must be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works. Street trees must: Meet AS2303 Tree stock for landscape use. Be located in accordance with engineering requirements for safe vehicle and pedestrian sight lines. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. PRIOR TO COUNCIL SIGNING THE PLAN OF SURVEY Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. As Constructed Plans and ADAC XML Files (Council) Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory “As-Constructed” records must be submitted to Council. The bundle of “As Constructed” information shall include: As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and; ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed) prepared in accordance with industry standards and recorded in “MGA - UTM56 / GDA94” projection. Please Note: Further information and advice relating to the as-constructed drawing presentation, as-constructed survey capture and associated guidelines for preparation of a compliant ADAC XML digital file are available on the webpage titled “As-Constructed Guidelines” and accessible at the Noosa Council Website: Planning & Development / Development Tools & Guidelines / As-Constructed Guidelines. The “As-Constructed” drawings will require certification by a: Qualified experienced Civil Engineer (RPEQ) confirming design intent and conformance with applicable standards and specifications, along with the relevant descriptions of assets, services and structures and; Licensed Surveyor in regard to the cadastral and locational information, levels and applicable survey datum. The data must be in accordance with Council’s “Planning Scheme Policy 6 – Engineering Design Standards”, and fully detail the levels for all engineering works including but not limited to the drainage network and structures, finished ground and pavement surface levels. On Maintenance All municipal works must be accepted ‘On Maintenance’ by Council in accordance with Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On Maintenance’, the supervising RPEQ must submit to Council: certification that all works have been undertaken and completed in accordance with the requirements of this Permit as Constructed details in accordance with Council’s Planning Scheme Policy maintenance and operational manuals for all proprietary or site specific devices Off Maintenance Prior to requesting an Off Maintenance inspection the developer must provide a written request for the Off Maintenance inspection. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged where: a Council inspection reveals works do not comply with approval requirements submitted certification falsely states works comply with approval requirements. A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Community Title Scheme - Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority. General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawings RS-049, RS-050 and RS-056 (a copy is attached). Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Qualified Person, for the purpose of erosion and sediment control is a Certified Professional in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional Engineer of Queensland (RPEQ). As a general rule, a site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. Qualified Person Qualified Person, for the purpose of: Supervising landscape works and preparing a landscape certification, is considered to be a landscape architect, landscape designer or horticulturist with a minimum of three years current experience in the field of landscape design. Undertaking landscape construction and establishment works is considered to be a person with five years current experience in commercial landscape construction projects. Undertaking, supervising tree works and preparing arboriculture certification, is considered to be a person with a minimum three years current experience in tree protection, hazard identification/mitigation and AS2303 Tree stock for landscape use assessment and either: International Society of Arboriculture (ISA) certification; or A Diploma of Arboriculture. Managing Fauna protection, preparing Fauna reporting and certification and calculating compensatory habitat, is considered to be an Ecologist or Environmental Scientist with a minimum of three years current experience in the field of fauna assessment and management. Advertising Devices All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1 (Administration) 2015 including both temporary and permanent signage. All freestanding, pylon or pole signs or signage that is illuminated requires approval from Council prior to being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is prohibited from being erected in the Shire. Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges property notes Not applicable. VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Building Works All building work. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available online at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 4 of 6 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image2.tmp (image text)] SNLagdls lavas <A aa5 SON 2 ‘Common Property (8m?) proposed Lot 2 (~258m?) bier | sown Community Title Subdivision Prepared by JL V1 Date: 7/12/2022 [Attachment: image4.tmp (image text)] WYANDRA STREET Kase wee oe wes seucrrsonue cameos race wT a aca ES in RAISED CORTEN STEEL EDGE a fee aii SESEPSSTOREE war oO fee a XXX ‘se.ects rose e zoo seceroucron ren “NEW CROSLOVER < erro < = ir (Uo WATER TANK a P : (SOE covers sesame | || Lrcecrone — SHEET 02 - PLANTING PLAN (Ground Level) - OPERATIONAL WORKS " of 5 10 FOR COUNCIL APPROVAL @]_ element design Fas element design,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.