MOVEMENT SUMMARY
Site: 101 [4_Grant St_Noosa Dr_Sunshine Rd - Base+dev
2025 AM Peak (Weekday) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout
Vehicle Movement Performance
Mov Turn Mov Demand Arrival Deg. Aver. Level of 95% Back Of Prop. Eff. Aver. Aver.
ID Class Flows Flows Satn Delay Service Queue Que Stop No. of Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
South: Sunshine Beach Road (S)
1 L2 All MCs 194 6.2 194 6.2 0.223 6.7 LOS A 1.4 10.4 0.62 0.60 0.62 49.5
2 T1 All MCs 9 0.0 9 0.0 0.223 6.4 LOS A 1.4 10.4 0.62 0.60 0.62 53.3
3 R2 All MCs 329 4.6 329 4.6 0.319 11.1 LOS B 2.3 16.8 0.63 0.65 0.63 48.8
3u U All MCs 53 2.1 53 2.1 0.319 13.2 LOS B 2.3 16.8 0.63 0.65 0.63 48.9
Approach 585 4.8 585 4.8 0.319 9.8 LOS A 2.3 16.8 0.63 0.64 0.63 49.1
East: Noosa Drive (E)
4 L2 All MCs 235 5.1 235 5.1 0.245 6.6 LOS A 1.7 12.3 0.65 0.60 0.65 52.7
5 T1 All MCs 227 2.9 227 2.9 0.209 5.9 LOS A 1.5 10.7 0.61 0.55 0.61 49.3
6 R2 All MCs 7 0.0 7 0.0 0.209 10.9 LOS B 1.5 10.7 0.61 0.55 0.61 51.5
6u U All MCs 13 0.0 13 0.0 0.209 13.1 LOS B 1.5 10.7 0.61 0.55 0.61 51.5
Approach 482 3.9 482 3.9 0.245 6.5 LOS A 1.7 12.3 0.63 0.57 0.63 51.3
North: Grant Street (N)
7 L2 All MCs 3 0.0 3 0.0 0.136 11.4 LOS B 0.9 6.6 0.86 0.76 0.86 47.7
8 T1 All MCs 27 0.0 27 0.0 0.136 11.6 LOS B 0.9 6.6 0.86 0.76 0.86 48.0
9 R2 All MCs 49 0.0 49 0.0 0.136 16.7 LOS B 0.9 6.6 0.86 0.76 0.86 43.2
9u U All MCs 1 0.0 1 0.0 0.136 18.9 LOS B 0.9 6.6 0.86 0.76 0.86 47.3
Approach 81 0.0 81 0.0 0.136 14.8 LOS B 0.9 6.6 0.86 0.76 0.86 45.4
West: Noosa Drive (W)
10 L2 All MCs 35 0.0 35 0.0 0.241 5.8 LOS A 1.7 12.3 0.63 0.56 0.63 49.4
11 T1 All MCs 246 3.5 246 3.5 0.241 5.9 LOS A 1.7 12.3 0.63 0.56 0.63 49.8
12 R2 All MCs 160 2.7 160 2.7 0.263 11.6 LOS B 1.8 12.8 0.66 0.68 0.66 44.9
12u U All MCs 93 2.4 93 2.4 0.263 13.8 LOS B 1.8 12.8 0.66 0.68 0.66 37.7
Approach 534 2.9 534 2.9 0.263 9.0 LOS A 1.8 12.8 0.64 0.61 0.64 46.4
All Vehicles 1682 3.7 1682 3.7 0.319 8.8 LOS A 2.3 16.8 0.65 0.62 0.65 48.8
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:54 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9
Document Set ID: 24005503
23806879
Version: 2,
0, Version Date: 07/08/2025
01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.