Original source · versioned page text
SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 96, section 1. The text section number identifies this passage in the reader.
MOVEMENT SUMMARY
Site: 101 [12_Grant St_Noosa Dr_Sunshine Rd - Base 2025
PM Peak (Weekend) (Site Folder: Site 2)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
New Site
Site Category: (None)
Roundabout
Vehicle Movement Performance
Mov Turn Mov Demand Arrival Deg. Aver. Level of 95% Back Of Prop. Eff. Aver. Aver.
ID Class Flows Flows Satn Delay Service Queue Que Stop No. of Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
South: Sunshine Beach Road (S)
1 L2 All MCs 256 0.4 256 0.4 0.271 6.1 LOS A 1.8 12.9 0.61 0.58 0.61 50.1
2 T1 All MCs 20 0.0 20 0.0 0.271 6.1 LOS A 1.8 12.9 0.61 0.58 0.61 53.3
3 R2 All MCs 355 3.1 355 3.1 0.332 10.8 LOS B 2.5 17.8 0.61 0.64 0.61 48.9
3u U All MCs 58 1.9 58 1.9 0.332 13.0 LOS B 2.5 17.8 0.61 0.64 0.61 49.0
Approach 688 1.9 688 1.9 0.332 9.1 LOS A 2.5 17.8 0.61 0.62 0.61 49.4
East: Noosa Drive (E)
4 L2 All MCs 386 2.8 386 2.8 0.321 5.9 LOS A 2.5 17.9 0.65 0.57 0.65 52.8
5 T1 All MCs 244 1.8 244 1.8 0.266 6.5 LOS A 1.9 13.4 0.65 0.57 0.65 49.3
6 R2 All MCs 4 25.0 4 25.0 0.266 12.5 LOS B 1.9 13.4 0.65 0.57 0.65 50.6
6u U All MCs 8 0.0 8 0.0 0.266 13.7 LOS B 1.9 13.4 0.65 0.57 0.65 51.5
Approach 643 2.5 643 2.5 0.321 6.3 LOS A 2.5 17.9 0.65 0.57 0.65 51.7
North: Grant Street (N)
7 L2 All MCs 5 0.0 5 0.0 0.069 12.5 LOS B 0.5 3.4 0.88 0.77 0.88 47.2
8 T1 All MCs 11 0.0 11 0.0 0.069 12.7 LOS B 0.5 3.4 0.88 0.77 0.88 47.4
9 R2 All MCs 20 0.0 20 0.0 0.069 17.8 LOS B 0.5 3.4 0.88 0.77 0.88 42.6
9u U All MCs 1 0.0 1 0.0 0.069 20.0 LOS B 0.5 3.4 0.88 0.77 0.88 46.7
Approach 37 0.0 37 0.0 0.069 15.7 LOS B 0.5 3.4 0.88 0.77 0.88 45.0
West: Noosa Drive (W)
10 L2 All MCs 27 0.0 27 0.0 0.283 6.1 LOS A 2.1 14.6 0.66 0.57 0.66 49.1
11 T1 All MCs 301 1.1 301 1.1 0.283 6.1 LOS A 2.1 14.6 0.66 0.57 0.66 49.6
12 R2 All MCs 203 0.0 203 0.0 0.283 11.8 LOS B 1.9 13.7 0.68 0.69 0.68 45.1
12u U All MCs 63 3.4 63 3.4 0.283 14.1 LOS B 1.9 13.7 0.68 0.69 0.68 37.6
Approach 595 0.9 595 0.9 0.283 8.9 LOS A 2.1 14.6 0.67 0.62 0.67 46.9
All Vehicles 1963 1.8 1963 1.8 0.332 8.2 LOS A 2.5 17.9 0.65 0.61 0.65 49.4
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise Level 5 | Processed: Tuesday, 13 May 2025 11:11:57 AM
Project: C:\Users\AshleySchalken\TTM\2022 Synergy Projects - Brisbane\22BRT0122 3 – 7 Serenity Close, Noosa Heads – Proposed Hotel
resort\6 - Analysis\1_SIDRA\22BRT0122_01_OPW.sip9
Document Set ID: 24005503
23806879
Version: 2,
0, Version Date: 07/08/2025
01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.