Original PDF page 113, section 1. The text section number identifies this passage in the reader.
www.invarion.com
Client: CMI Investments Location: Serenity Close, Noosa Heads
Road Type Two-way Divided Plan Number: CMI-1AP-25040286 Speed Zone 50 km/h
RISK ASSESSMENT
RISK RATING
Elimination
Work not to commence - review
16-25 Extreme
control measures immediately.
Safety/Environmental Safety/Environmental
Safety Consequence of Risk:
Substitution Likelihood of Risk: Hierarchy of Control:
Senior supervisory management to
S5 - Catastrophic 1. Elimination ensure all controls are in place work
S4 - Major
Engineering 5 - Almost Certain S3 - Moderate
commences. Strict monitoring of
2. Substitution 10-15 High control measures. Work shall be
Controls S2 - Minor conducted with supervision and or
4 - Likely S1 - Insignificant 3. Separate co-worker i.e. person involved with
Administrative activity must not work alone.
Controls 3 - Moderate Environmental Consequence
4. Engineering,
of Risk:
Design/Redesign Responsibilities must be defined
2 - Unlikely E5 - Disaster and understood by those involved
PPE 5-9 Medium
E4 - Environmental Harm 5. Administration, Training before commencing work. Minimal
1 - Rare E3 - Environmental Nuisance supervision required.
E2 - Insignificant Effect 6. PPE, Environmental
E1 - Day to day Issue Controls 1-4 Low Control by routine measures.
CONSEQUENCES
LIKELIHOOD
S5- CATASTROPHIC / E5- DISASTER S4- MAJOR / E4- ENVIRONMENTAL HARM S3- MODERATE / E3- ENVIRONMENTAL NUISANCE S2- MINOR / E2- INSIGNIFICANT EFFECT S1- INSIGNIFICANT / E1-DAY TO DAY ISSUE
5 - ALMOST CERTAIN 25 20 15 10 5
4 - LIKELY 20 16 12 8 4
3 - MODERATE 15 12 9 6 3
2 - UNLIKELY 10 8 6 4 2
1 - RARE 5 4 3 2 1
Potential Risk Initial Risk Control Measures Revised Risk Actions
Source Event Risk Evaluation Likelihood Consequence Rating Options Likelihood Consequence Rating Who What
Specifications / Standards / Practices
1
Clarity of applicable 1. Copies of relevant Document onsite
specifications, Application of incorrect or expired 1. Reference Library available holding ALL 1. Client 2. Ensure that TGS is drafted to
standards, rules and specifications, standards, rules and current versions of the COP, MUTCD, required standards
policies including policies leads to confusion regarding 3. Ensure that Signs and Devices are
AGTTM, QGGTM 2. TMD
Present at this installed as per the TGS review
conflict between mandatory safety regulations leading Moderate Major High 2.Records of Client Requests Unlikely Major Medium
location relevant documentation prior to
requirements from to inconsistent application and 3.Review of all documentation Prior to 3. TMI commencing shift
RIM / PCBU etc. worksite not in line with required commencing works. 4. Ensure that they hold license's and
Documentation of safety standards 4. TC competencies that are valid and
superceded standards suitable for works undertaking
2 1. Provide accurate information
1. Remove cones from Centre of narrow
relating to Road conditions and
roads at TC station. 1. Client
If Work site conditions change and this environment
1. Monitor work site conditions
2. Amend sign placement to accommodate
Variation of Design Source / Event becomes a concern a Site 2.
2 .Consider site conditions
Contact details suppliedand road
obstacles and provide line of sight to TCD 2. TMD
MUTCD Present
Change in position of TCD due to road Not at at
present this
this Specific Risk Assessment shall be layout limitations
3. Report any changes to conditions
Moderate
Rare Minor
Minor Medium
Low 3. Repeat sign on same side of road if Unlikley Minor Low
AGTTM layout and environmental conditions location undertaken and if the situation is unable to 3.
to Adjust with in tolerances contact
PC or Supervisor
unsuitable to duplicate on other side of road 3. TMI
QGTTM be addressed Contact Supervisors and/or TMD if adjustments
4 Report any changes exceed
to the Team
4. Remove duplicate signage when unsafe
TMD for further actions tolerance
leader
to implement due to road layout or 4. TC
4. Evaluate TC station and sign
environmental reasons
positioning
3
If Work site conditions change and this 1. Client 1. Monitor work site conditions
Length Of Shuttle flow operation Source / Event becomes a concern a Site 2 .Notification
Contact details supplied allow
Design outside scope 1. Review by person competent in area 1. of requirements
exceeds guide. Not present 2. TMD 3. Report any changes to conditions
MUTCD Present at at this
this Moderate Minor
Specificthe
outside Risk Assessment
scope of MUTCDshall be
AGTTM time for design and consultation
Traffic Light operations greater than 2 location Rare Low
Medium undertaken and if the situation is unable to Unlikely Minor Low to PC ortasks
Supervisor
AGTTM location QGTTM 2.Direct to qualified persons
way operations beRPEQ
addressed Contact Supervisors and/or 3. TMI 4 Report any changes to the Team
QGTTM 2. Design and Sign off 3. Setup TGS as per instructions
Road safety Barrier Systems TMD for further actions leader
4. TC
Document Set ID: 24005451
23806881
Version: 1,
0, Version Date: 06/08/2025
01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.