Traffic Management Plan – 25040286
3.1 Risk Assessment
Initial Revised
Potential Risk Control Measures Action
Risk Risk
Evaluation
Consequence
Consequence
Likelihood
Likelihood
Source Event Options Who What
Rating
Rating
Risk
Specifications / Standards / Practices
1
1. Copies of relevant Document onsite
2. Ensure that TGS is drafted to
Clarity of applicable 1. Client
Application of incorrect or expired 1. Reference Library available holding ALL required standards.
specifications,
specifications, standards, rules and current versions of the COP, MUTCD, 3. Ensure that Signs and Devices are installed
Moderate
Medium
standards, rules and 2. TMD
Unlikely
policies leads to confusion regarding Present AGTTM, QGGTM as per the TGS review relevant documentation
Major
Major
High
policies including
mandatory safety regulations leading to at this 2.Records of Client Requests prior to commencing shift
conflict between 3. TMI
inconsistent application and worksite not location 3.Review of all documentation Prior to 4. Ensure that they hold licenses and
requirements from
in line with required safety standards commencing works. competencies that are valid and suitable for
RIM / PCBU etc. 4. TC
works undertaking
Documentation of
superceded standards
2
1. Client
If Work site conditions change and this Source
Variation of Design 1. Monitor work site conditions
Not / Event becomes a concern a Site-Specific
MUTCD Minor 2. TMD 2. Contact details supplied.
Change in position of TCD due to road Present Risk Assessment shall be undertaken and if
Rare
Low
AGTTM 3. Report any changes to conditions to PC or
layout and environmental conditions at this the situation is unable to be addressed
QGTTM 3. TMI Supervisor
location Contact Supervisors and/or TMD for further
4 Report any changes to the Team leader
actions
4. TC
3
1. Client
If Work site conditions change and this Source
Length Of Shuttle flow operation 1. Monitor work site conditions
Design outside scope Not / Event becomes a concern a Site-Specific
exceeds guide. 2. TMD 2. Contact details supplied.
MUTCD Present Risk Assessment shall be undertaken and if
Minor
Rare
Low
Traffic Light operations greater than 2- 3. Report any changes to conditions to PC or
AGTTM at this the situation is unable to be addressed
way operations 3. TMI Supervisor
QGTTM location Contact Supervisors and/or TMD for further
Road safety Barrier Systems 4 Report any changes to the Team leader
actions
4. TC
Document Set ID: 24005412
23806880 Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 10
Version: 1,
0, Version Date: 06/08/2025
01/01/1900 [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.