SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 138, section 1. The text section number identifies this passage in the reader.
Traffic Management Plan – 25040286
Initial Revised
Potential Risk Control Measures Action
Risk Risk
Evaluation
Consequence
Consequence
Likelihood
Likelihood
Source Event Options Who What
Rating
Rating
Risk
13 1. Ensure enough Staff to preform duties and
that regular inspection are made of the route to
1. Client ensure that is Hazard free. Client to provide
1. Ensure minimum lane requirements are met
notice to local residents.
as per Qld. Standards
Moderate
Present 2. TMD 2. Ensure that TGS is drafted to accommodate
Aggressive driver behaviour and lack of 2. Undertake works outside of peak hour traffic
Major
Major
Rare
High
Low
at this VRU. Ensure a safe detour has been drafted.
community acceptance of worksite 3. Notice to locals e.g. Letterbox drops
location 3. TMI 3. Ensure that Signs and Devices are installed
4. Refer to local road authority and site
as per the TGS. Regular safety checks of
supervisor
4. TC detour route.
4. Ensure that they are stationed in a position
to guide or assists VRU
1. Client
If Work site conditions change and this Source
1. Monitor work site conditions
Not / Event becomes a concern a Site-Specific
Works lead to excessive Traffic volumes not suitably 2. TMD 2. Contact details supplied.
Minor
Present Risk Assessment shall be undertaken and if
Rare
Low
and unacceptable traffic. accommodated leading to Congestion / 3. Report any changes to conditions to PC or
at this the situation is unable to be addressed
queues and delays. delays exceeds allowable levels 3. TMI Supervisor
location Contact Supervisors and/or TMD for further
Can be due to 4 Report any changes to the Team leader
actions
- not maintaining min 4. TC
available req. lanes 1. Client
If Work site conditions change and this Source
- closure of high-volume 1. Monitor work site conditions
Extended queue lengths, or road Not / Event becomes a concern a Site-Specific
roads Minor 2. TMD 2. Contact details supplied.
alignment factors affect sight distance to Present Risk Assessment shall be undertaken and if
Rare
Low
3. Report any changes to conditions to PC or
the end of queue, leads to network crash at this the situation is unable to be addressed
3. TMI Supervisor
risks location Contact Supervisors and/or TMD for further
4 Report any changes to the Team leader
actions
4. TC
1. Client
If Work site conditions change and this Source
1. Monitor work site conditions
Volume of traffic in remaining lanes is Not / Event becomes a concern a Site-Specific
2. TMD 2. Contact details supplied.
Minor
unacceptably high leading to traffic Present Risk Assessment shall be undertaken and if
Rare
Low
3. Report any changes to conditions to PC or
queues extend through nearby at this the situation is unable to be addressed
3. TMI Supervisor
intersections / roundabouts location Contact Supervisors and/or TMD for further
4 Report any changes to the Team leader
actions
4. TC
14 1. Client
1. Preset minimum QL based on road 1. Provide traffic data for the site
Moderate
Estimated Queue Calculated Queue Length incapable to Present classification 2. TMD 2.Review estimated QL and traffic data
Major
Major
Rare
High
Low
Length is impracticable hold minimum of one to two vehicles at this 2. Category 1 streets EQL minimum is 10m 3. Ensure that Signs and Devices are installed
due to insufficient room expected for road classification location 3. Category 2 streets EQL minimum is 30m 3. TMI as per the TGS and to monitor Queue Length
to hold potential traffic. 4. Category 3 streets EQL minimum is 30m 4. To monitor and communicate the QL to TMI
4. TC
Document Set ID: 24005412
23806880 Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 14
Version: 1,
0, Version Date: 06/08/2025
01/01/1900 [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.