Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 161, section 1. The text section number identifies this passage in the reader.

     Traffic Management Plan – 25040286

          9. EMERGENCY ARRANGEMENTS AND CONTINGENCIES
          9.1 Traffic Incident Procedures

     In the event of an incident or accident, whether or not involving traffic or road users, all work shall cease and
     traffic shall be stopped as necessary to avoid further deterioration of the situation. First Aid shall be
     administered as necessary, and medical assistance shall be called for if required.

     Road plant within the work area that may impact on any services requiring access to a crash site will be
     cleared from the area quickly as necessary.

          9.1.1     Serious Injury or Fatality

     In the case of serious injury or fatality occurring within the traffic management site all work shall cease
     immediately, machinery and vehicles turned off and the area cleared of personnel as soon as possible. Traffic
     Controllers (and other personnel if necessary) shall be deployed immediately to ensure no traffic or other road
     users approach the area.

     An Ambulance and Police shall be called on telephone number 000 where life threatening injuries are
     apparent.

     All road workers and traffic management personnel shall preserve the scene leaving everything in situ, until
     direction is given by Police or WorkSafe.

     A site-specific detour route and/or road closure point will be determined, signed and controlled by traffic
     management personnel and advised to Police, who will take charge of the site upon arrival. Detour routes will
     be determined so as to cater for all types of vehicles required to use them. An example of how to manage an
     emergency can be found in Section 5 of AGTTM Part 10.

     All site personnel shall be briefed on control procedures covering incidents and crashes that result in serious
     injury or fatalities.

     If it is determined that a road closure point is required on X Street, to preserve the site, detour routes will be
     put in place to the West at L Road and to the East at Q Street. The exit to X Street from L Road will also need
     to be closed. This will be signed and controlled by traffic management personnel with road closure, detour
     signs and / or other devices outlined in Section 5 of AGTTM Part 10. This detour will be advised to Police, who
     will take charge of the site upon arrival. The RAV mapping system indicates Q Street and L Road can be
     accessed via P Road and all will cater for all heavy vehicle types that access X Street.

          9.1.2     Minor Incident or Vehicle Break Down within Site

     Broken down vehicles and vehicles involved in minor non-injury crashes shall be temporarily moved to the
     verge as soon as possible after details of the crash locations have been gathered and noted. Where
     necessary to maintain traffic flow, vehicles shall be temporarily moved into the closed section of the work area
     behind the cones, providing there is no risk to vehicles and their occupants or workers. Suitable recovery
     systems shall be used to facilitate prompt removal of broken down or crashed vehicles. Assistance shall be
     rendered to ensure the impact of the incident on the network is minimised.

     Any traffic crash resulting in non-life-threatening injury shall be reported to the Qld Police Service on 000.

     Details of all incidents and accidents shall be reported to the Site Supervisor and Project Manager using the
     incident report form or similar.




Document Set ID: 24005412
                  23806880Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 37
Version: 1,
         0, Version Date: 06/08/2025
                          01/01/1900             [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.