Skip to the record
For the highest quality transcripts.

Original source · versioned page text

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)

of 180

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 61, section 1. The text section number identifies this passage in the reader.

                                                           NOOSA COUNCIL
                                                        REFERENCE DOCUMENT
                                                        OPW25/0042 23 SEP 2025




            Traffic Impact Assessment (TIA)

                      Development Transport Demand

                      Existing Traffic Demand

            Colliers conducted traffic counts on Friday, 8th July 2022 and Saturday, 9th July 2022 to establish the existing
            traffic volumes during the weekday and weekend peak-hour periods at the following intersections:

                 •    Noosa Drive / Grant Street; and
                 •    Noosa Drive / Coral Tree Avenue; and
                 •    Grant Street / Banksia Avenue.

            The following peak periods were as follows:

                 •    Noosa Drive / Grant Street / Sunshine Beach Road:
                         o Friday, 8th July 2022
                                 ▪ AM Peak period:                   8:30am to 9:30am
                                 ▪ PM Peak Period:                   3:15pm to 4:15pm

                            o    Saturday, 9th July 2022
                                     ▪ PM Peak Period:                  1:00pm to 2:00pm

                 •    Noosa Drive / Coral Tree Avenue:
                         o Friday, 8th July 2022
                                 ▪ AM Peak period:                      9:00am to 10:00am
                                 ▪ PM Peak Period:                      3:15pm to 4:15pm

                            o    Saturday, 9th July 2022
                                     ▪ PM Peak Period:                  1:00pm to 2:00pm

                 •    Grant Street / Banksia Avenue:
                         o Friday, 8th July 2022
                                  ▪ AM Peak period:                     8:30am to 9:30am
                                  ▪ PM Peak Period:                     3:00pm to 4:00pm

                            o    Saturday, 9th July 2022
                                     ▪ AM Peak period:                  10:15am to 11:15am

            Detailed surveyed traffic volumes observed during the weekday/weekend AM and PM peak-hour periods are
            attached in Attachment A – Survey Data.

                      Development Traffic Demand

            The Bulk Earthworks traffic generation rates is based on a ‘first principles’ basis. It is anticipated that there
            will be 180 trucks per day. Only 10 (ten) vehicles per hour (vph) are expected in both the AM/ PM Peaks.

            Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
            Reference: 22BRT0122

Document Set ID: 24005503
                  23806879
Version: 2,
         0, Version Date: 07/08/2025
                          01/01/1900
Log in to download the original file

SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published).pdf · 18.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.