Table 3-2: Summary of Sidra Outputs (Grant Street / Noosa Drive / Sunshine Beach Road Roundabout)
Scenario DOS Average Delay LOS 95th Percentile Critical Queue (m)
Overall Worst Movement Overall Worst Sunshine Noosa Grant Noosa
Movement Beach Dr (E) St (N) Dr
Rd (S) (W)
Weekday - AM Peak Hour
2022 Survey 30% 9 sec 18 sec (RT Grant St N) A B 16 m 12 m 6m 12 m
2025 Base 32% 9 sec 19 sec (UT Grant St N) A B 17 m 12 m 6m 13 m
2025 Base + 32% 9 sec 19 sec (UT Grant St N) A B 17 m 12 m 7m 13 m
Earthworks
Weekday - PM Peak Hour
2022 Survey 40% 9 sec 20 sec (UT Grant St N) A B 20 m 24 m 6m 15 m
2025 Base 43% 9 sec 21 sec (UT Grant St N) A B 21 m 26 m 6m 16 m
2025 Base + 43% 9 sec 21 sec (UT Grant St N) A B 22 m 26 m 7m 16 m
Earthworks
Weekend – PM Peak
2022 Survey 32% 8 sec 19 sec (UT Grant St N) A B 17 m 17 m 3m 14 m
2025 Base 33% 8 sec 20 sec (UT Grant St N) A B 18 m 18 m 3m 15 m
2025 Base + 33% 8 sec 20 sec (UT Grant St N) A B 18 m 18 m 4m 15 m
Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W - West
The analysis indicates that the roundabout is expected to operate at suitable levels at the 2025 assessment
year, with Earthworks traffic included, with a worst-case DOS 43% (less than 85%, practical capacity limit of
roundabout) and overall LOS A. The addition of the Earthworks traffic has no notable impact to key
operational metrics, with minor change to average intersection delay and at most an increase in queuing of
1m (less than 1 vehicle length - approx. 6.0m).
Based on this assessment, the proposed development is considered to have negligible impact on the
operations of the Grant Street / Noosa Drive / Sunshine Beach Road roundabout intersection.
Analysis of Grant Street / Banksia Avenue
Ultimately, access to the subject development will be achieved with the addition of a fourth (western) leg to
the existing Grant Street / Banksia Avenue roundabout intersection.
However, during Bulk Earthworks this access will not be in place and haulage vehicles will gain access to the
subject site at three (3) proposed temporary access locations as highlighted in Figure 3-3 overleaf from
Avada Traffic’s Traffic Management Plan (TMP). All Earthworks traffic will be turning in / out from the Grant
Street eastern approach and Banksia Avenue northern approach. Therefore, the intersection will remain as
per the existing arrangement.
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122
Document Set ID: 24005503
23806879
Version: 2,
0, Version Date: 07/08/2025
01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.