Original source · versioned page text
SUPERSEDED NEGOTIATED - OPW25 0042 - REFERENCE DOCUMENT (As Published)
Very large file (18.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 74, section 1. The text section number identifies this passage in the reader.
Attachment B — Network Diagrams 2022 Survey TRAFFIC NETWORK DIAGRAM 1 2022 SURVEY VOLUMES ALL VEHICLES Legend: Weekday AM Peak* Weekday PM Peak* Weekend PM Peak* Survey Date: Friday, 8 July 2022 Saturday, 9 July 2022 Serenity Close *Peak hours for each intersection as nominated DEVELOPMENT SITE color BIROG e100 $ 3 oo 53 o 1 8 0 2 58 a Ik tc 6 tH - 2 3 a Ee 8 ° i 0 8 14 25 —t} 0 18 10 5 14 16 9 fo 7 2 276 +/o 2 3 8 511 402 405 —]0 21 16 186 70 41 25 3 1 2 1 afaid ob 58 ajo J Job tL 6 103 a1 Noosa Drive JT tf F Plt pw 2s ti 1 1 1 9 «0302 48/t 7 10 4 = 359 556 455 237 19 320 53} 208 308 224 234. 18-325 «53 |¥- 215 430 354 peoy yseag aulysuns Site: 3-7 Serenity Close, Noosa — Proposed Resort Complex Reference: 22BRT0122 Document Set ID: 28606809 Version: @, Version Date: 07/08/2026 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.