Council archive · source document
treeremoval23weybaparkdrive1 · OPW13/0315
Attached to the e-mail Development Application for Removal of Vegetation - OPW13/0315.
| | | | Integrated Development Assessment System form Application details—IDAS form 1 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: e complete this form (Application details—I/DAS form 1) e¢ complete any other forms relevant to your application e provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the applicant.) Name/s (individual or company name in full) CAN een 6REE NAL G H For companies, contact name Postal address 23 WEIBA PAR DRIVE NOOSA-_[(tEADS OAS CAS FFE Contact phone number Mobile number (non-mandatory) Fax number (non-mandatory) e-mail address (non-mandatory) eet daitlin aveenhalal, UJ @ “hotwail. co Department of Infrastructure and Planning @® Derby
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
LIL 1. What is the nature of development proposed? (tick all applicable box/es) LE] material change of use of premises [_] building work NM operational work | reconfiguring a lot 2. What type of approval is being sought? [X| development permit LE] preliminary approval LE] both—provide details below 3. Is the application for a mobile and temporary environmentally relevant activity (ERA)? [Xx] No | Yes—complete table A and then go to question 5 Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate 4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row) Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the premises L] street address/lot on the plan C] street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in water e.g. jetty, pontoon) Street address Lot on plan description | Local government area Unit | Street | Street name and official suburb/ | Post- | Lot no. Plan type Seep Legge ationy no. no. locality name code and plan no. 23 | Wesha Pole Dives KP a OT] ok vashine Coast Voosn Heads ET] XS |LADARE | Svashuae Coas Rew 1 onn\ Coun a \ 2 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 3
Remove Large Gum Tree in Rear East Corner of yard. The tree threatens the property and our children as large limbs have fallen in the past few storms (already caused damage to garden and trampoline and balustrading on deck).
Page 4
LIL Table E Name of owner/s of the land [| The owner’s written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land [| By making this application, I, the applicant, declare that the owner has given written consent to the making of the application. 9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials. Refer to the notes at the end of this form for more information) Xx No [_] Yes—complete table G Table G—state owned resources (provide details for each state resource in a separate table) Nature of state-owned resource Nature of evidence required (tick the applicable box and attach a copy of the L] Evidence of an allocation of, or an entitlement to, the resource evidence to this form) Cl Evidence the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or an entitlement to, the resource | Evidence the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or an entitlement to, the resource 10. Identify if any of the following apply to the premises (tick applicable box/es) | adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H | on strategic port land under the 7ransport /nfrastructure Act 1994—complete table | L] in a tidal water area—complete table J Table H Name of water body, watercourse or aquifer 4 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 5
LL 16. List below all of the forms and supporting information that accompany this application (include all IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made on-line using Smart eDA) Description of attachment or title of attachment Method of lodgement to assessment manager Se EMAL SITE PLAN \otATING Trees e4¢lL 17. Applicant’s declaration IX} making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Notes for completing this form Question 8: e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. | e Owner’s consent is not required for a mobile and temporary ERA. | Question 9: e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: e The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. e Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au. 6 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 6
| | | Integrated| Development Assessment System form Building or operational work assessable against a planning scheme—IDAS form 6 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) This form must be completed for development applications for building works or operational work assessable against a planning scheme. You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: e complete Application details—/DAS form 1 e complete any other forms relevant to your application e provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. Allterms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be used for development on strategic port land under the 7ransport Infrastructure Act 1994. This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au 1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es) L] building work—complete table A xX operational work—complete table B Table A uilding work made assessable in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? Freee What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) LE] development permit EL preliminary approval Are there any current approvals associated with this application? (e.g. material change of use) List of approval reference/s Date approved Date approval lapses Department of Infrastructure and) Planning WN Oa OY overnment
Page 7
LIL Applications for operational works involving stormwater drainage drawings showing: [| confirmed e existing and proposed contours e drainage locations, diameters and class of pipe, open drains and easements e¢ manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels ¢ inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels Applications for operational works involving water reticulation drawings showing: L] confirmed e kerb lines or edge of pavement where kerb is not constructed ¢ location and levels of other utility services where affected by water reticulation works e pipe diameter, type of pipe and pipe alignment e water main alignments e water supply pump station details (if applicable) e minor reservoir details (if applicable) © conduits e location of valves and fire hydrants e location of house connections (if applicable) e location of bench marks and reference pegs Applications for operational works involving sewerage reticulation drawings showing: LE] confirmed ¢ location of all existing and proposed services e location of all existing and proposed sewer lines and manhole locations ¢ location of all house connection branches e kerb lines or edge of pavement where kerb is not constructed e chainages e design sewer invert levels ¢ design top of manhole levels e type of manhole and manhole cover ¢ pipe diameter, type of pipe and pipe alignment e location of house connections (if applicable) e sewer pump station details (if applicable) Applications for operational works involving street lighting drawings showing: LE] confirmed e location of all light poles and service conduits ¢ location of all other cross road conduits e type of wattage and lighting e any traffic calming devices e additional plans for roundabouts and major roads (if applicable) e details of any variations to normal alignment e details of lighting levels 4 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 8
LIL Applications for operational works involving public utility services drawings showing: Cl confirmed e any existing light poles and power poles e any existing underground services e details of proposed services e alternation to existing services Applications for operational works involving landscaping works drawings showing: CI eonfirmed e the location of proposed plant species e aplant schedule indicating common and botanical names, pot sizes and numbers of plants e planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge e the location and type of any existing trees to be retained © construction details of planter boxes, retaining walls and fences e the proposed maintenance period ¢ irrigation system details Notes for completing this form: e This form can also be used for development applications for building works or operational works assessable against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy—please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. 5 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 9
Gum Tree in Rear Corner: Large Limbs have fallen in past year causing damage to the property, and potential concern as could be fatal to children (if underneath). Half of the tree leans over the property, threatening future damage to property.
Page 10
Used in these records
treeremoval23weybaparkdrive1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.