Skip to the record
Every meeting, every word.

Original source · versioned page text

TIA - Application decision - s62A (PA) - Approval_1 (003)

Attached to the e-mail MCU22/0194 - SRA application correspondence - Referral agency response – with conditions..

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                       Condition
 No. Conditions of Development Approval
                                                                                       Timing


       (c)    The road access works must be designed and constructed in
              accordance with:
              Institute of Public Works Engineering Australasia (IPWEA), Standard
                Drawing RS-049 & RS-050 – residential driveway.
              Department of Transport and Main Roads' Road Planning and
                Design Manual, 2nd Edition; and
              Department of Transport and Main Roads' Guideline: Treatment
                options to improve safety of pedestrians, bicycle riders and other
                path users at driveway.
 2     A path user sight triangle area must be provided clear of walls, fences,        Prior to the
       structures (including advertising devices) and any vegetation and               commencement
       landscaping must remain below 0.5m in height to ensure driver visibility is     of the use and
       unobstructed as shown on the Site Plan, prepared by Ausmar Homes,               maintained at all
       dated 26 October 2022, reference sheet 0.001, revision C, as amended in         times.
       red.
 3     Direct access is prohibited between Lot 106 on C5604 and Cooroy - Noosa         At all times.
       Road at any other location other than the permitted road access location
       described in Condition 1.


Reasons for the decision
The reasons for this decision are as follows:
  a) Vehicular access must not compromise safety of the users of the state-controlled road
     network.
  b) The safety of users of the state-controlled road network is the primary consideration for all
     works in a state-controlled road corridor.
  c) The number of access points to a state-controlled road will be minimised to ensure the
     through traffic carrying function of the road is maintained.

Please refer to Attachment A for the findings on material questions of fact and the evidence or
other material on which those findings were based.

Information about the Decision required to be given under section 67(2) of TIA
1. There is no guarantee of the continuation of road access arrangements, as this depends on
    future traffic safety and efficiency circumstances.

2. In accordance with section 70 of the TIA, the applicant for the planning application is bound by
   this decision. A copy of section 70 is attached as Attachment B, as required, for information.

Further information about the decision
1. In accordance with section 67(7) of TIA, this decision notice:
       a) starts to have effect when the development approval has effect; and
       b) stops having effect if the development approval lapses or is cancelled; and



                                                                                             Page 2 of 12
Log in to download the original file

TIA - Application decision - s62A (PA) - Approval_1 (003).pdf · 381 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.