Skip to the record
For the highest quality transcripts.

Council archive · source document

Proposal Plans · MCU20/0072

Plans and drawings: the text below has words only, no drawings.

Very large file (13.2 MB): may take a few minutes to open.

Log in to see the plans as drawn
                   1                 2              3                 4                      5                       6                    7                      8                            9                         10
                                                                                                       30850




                                                                                                                                                                 ?


A                                                                                                                                                                                                                                                                      A




                                                                                                                                                                                                                                               Proposed New Building
                                                                                                                                                                          5°
            9600




                                                                                                                                                                                                                9600
    12000




                                                                                                                                                                                                                                       12000
                                                                                                                            RF01




B                                                                                                                                                                                                                                                                      B
            2400




                                                                                                                                                                                                                2400
                                                                                                       RF01




                                                                                    5°
C                                                                                                                                                                                                                                                                      C
                                                                          PL01




                        3400              3400           3450                     3400                 3450                  3400                     3450                     3450                    3450
                                                                                                                                                                                                                                                                             I       Moved ramp, Added deck, stairs & windows                      15.07.2020     CB
                                                                                                                                                                                                                                                                             H       Moved Staff Room                                              30.06.2020     CB
                       Module 1          Module 2       Module 3                 Module 4            Module 5              Module 6                Module 7               Module 8                Module 9
                                                                                                                                                                                                                                                                             G       Bigger Breakout Room 2                                        29.06.2020     CB
                                                                                                                                                                                                                                                                             F       Adjusted Building Location and added RL's, Moved Stairs and   26.07.2019     JP
                                                                                                                                                                                                                                                                                     Ramp
                                                                                                                                                                                                                                                                              E      Resizing of Buildings and Layouts. Relocated Office Moved     19.07.2019     JP
                   1                 2              3                 4                      5                       6                    7                      8                            9                         10                                                   D       For Client Approval                                           31.08.2018     IC
                                                                                                                                                                                                                                                                            Iss.                              Description                            Date         By



                       1. Ground Floor Roof                                                                                                                                                                                                                                                  FOR APPROVAL
                               1 : 100


                                                                                                                                                                                                              General Notes & Disclaimers
                                                                                                                                                                                                                                                                                         COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE
                                                                                                                                                                                                              • Wall/Ceiling/Roof frames built to Ausco                                   REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
                                                                                                                                                                                                                Backbone framing design standards.                         Title
                                                                                                                                                                                                                                                                                                                  AUTHORITY.
                                                                                                                                                                                                              • Building chassis designed to Ausco
                                                                                                                                                                                                                Standard Chassis drawings.
                                                                                                                                                                                                              • All work must be done in accordance with
                                                                                                                                                                                                                                                                             Roof Plan (MQB)
                                                                                                                                                                                                                the relevant Australian/New Zealand
                                                                                                                                                                                                                Standard(s) and the National Construction
                                                                                                                                                                                                                Code.
                                                                                                                                                                                                              • Furniture, plumbing, & electrical
                                                                                                                                                                                                                representations are indicative. Appearance                 Project
                                                                                                                                                                                                                may vary depending on supplier.                              30.85x12m Learning Centre-
                                                                                                                                                                                                              • Loose items to be packed for transport.
                                                                                                                                                                                                              • Site, stairs, ramp and building skirting                     SG (B190)
                                                                                                                                                                                                                                                                           Client
                                                                                                                                                                                                                indicative only. Size, fall and location to suit
                                                                                                                                                                                                                site conditions. Constructed to comply with                  Good Shepard Lutheran
                                                                                                                                                                                                                AS1428.1.
                                                                                                                                                                                                              Manufactured to Wind Speed: B190                               College
                                                                                                                                                                                                              Manufactured in: MQB
                                                                                                                                                                                                              Intended Location: Noosaville, QLD

                                                                                                                                                                                                              Client Approval                                              Drawn By            Drawn Date         Scale


                                                                                            Frame
                                                                                                 Manufacturing - Roof
                                                                                                                                                         Sheet
                                                                                                                                                               Drawings - Architectural
                                                                                                                                                                       Content                    Rev         Client:    Good Shepard Lutheran College                              IC          MAR 18 1 : 100                                              A2
                                                                                                                                                                                                                                                                           Checked By          Check Date
                                                                   Tag       Frame           Crs.      Cladding          Lining       Insulation
                                                                                                                                                         A-000   Schedules - Building Shell        I
                                                                                                                                                                                                              Approved by:                                                                                          DIMENSIONS ARE IN MM
                                                                                                                                                                                                                                                                                 AAD            MAR 18




                                                                                                                                                                                                                                                                                                                                                                       15/07/2020 7:00:57 PM
                                                                                                                                                         A-001   Site Plan                         I
                                                                   RF01 Engineered steel 1100       Custom Orb (Deep -              R1.8 Glass Wool                                                                                                                                                                     DO NOT SCALE
                                                                                                                                                         A-100   Ground Floor Plan                 I          Company:                                                     Project No.                                      Order No.
                                                                        frame purlins,              Ocean)                          Foil
                                                                        75mm, "Lipped C"
                                                                        section
                                                                                                                                                         A-101
                                                                                                                                                         A-200
                                                                                                                                                                 Roof Plan
                                                                                                                                                                 Elevations
                                                                                                                                                                                                   I
                                                                                                                                                                                                   I          Date (dd-mm-yyyy):                                                 0240100047                                   -
                                                                                                                                                         A-300   Ground Floor RCP                  I                                                                       Drawing No.                                             Sheet                  Issue

                                                                                                                                                                                                                                                                                 -                                                 A-101 I
                                                                                                                                                                                                              Signature:
                                                                                                                                                         A-500   Section & Details                 I

                                                                                                                                                                                                                                                                                                                                           Designed by: Brisbane

Used in these records

About this file

File size
13.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Proposal Plans.pdf · 13.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.