Council archive · source document
Proposal Plans · MCU20/0072
Plans and drawings: the text below has words only, no drawings.
Very large file (13.2 MB): may take a few minutes to open.
1 2 3 4 5 6 7 8 9 10
30850
13650 3450 13750
3400 3400 3450 3400 3450 3400 3450 3450 3450
(150) EE03
(150) EE03
(150) EE03
(150) EE03
(150) EE03
(150) EE03
(150) EE03
(150) EE03
(150) EE03
(1100) EE01
(1100) EE02
(1100) EE02
(1100) EE01
ME03 ME03 ME03
(300) EE01
(300) EE01
(300) EE01
(300) EE02
(300) EE01
(300) EE02
(300) EE02
(300) EE01
(300) EE02
(300) EE02
ME03
ME03 ME03 ME03 ME03 CL01
ME03
LT02
EQ01
LT02 LT02
LT02
A A
(300) EE01
(300) EE02
(300) EE01
(300) EE02
(300) EE01
(300) EE02
(300) EE01
(300) EE02
(300) EE01
(300) EE02
(300) EE01
(300) EE02
ME01 ME01 ME01 ME01 ME01
(1100) EE01
(1100) EE02
LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03
ME02
ME02
(300) EE02
(300) EE01
ME04 ME04 ME04 ME04 ME04 ME04 ME04
(300) EE01 (300) EE01
(300) EE02 (300) EE02 LT01
EE06 EE06
LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03
Proposed New Building
CL02
9600
(300) EE01 (300) EE01 EQ02
(300) EE02 (300) EE02
LT02
CL02
(300) EE01
LT04 (300) EE02
12000
(300) EE01
LT03 (300) EE02 LT03 LT03
ME02
LT03 LT03 LT03 LT03 LT03 LT03
ME02
ME04 ME04 ME04
ME04 ME04 ME04 ME04
(1050) EE10
(1050) EE10
(1000) EE05
(1000) EE05
(300) EE01
(300) EE02
(1050) EE10
(1000) EE05
(300) EE02
(300) EE02
(300) EE01
(300) EE01
(300) EE02
(300) EE02
(300) EE01
(300) EE01
(300) EE02
LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03 LT03
LT01 LT01 LT01 LT01
B B Drawings - Architectural
(1000) EE05
(1050) EE10
(300) EE02
(300) EE01
(450) EE09
(450) EE09
(450) EE09
(450) EE09
Sheet Content Rev
(450) EE09
(450) EE09
(300) EE01
(300) EE02
FN01 FN01 FN01 FN01 FN01FN01 FN01FN01 FN01FN01 FN01 FN01 FN01FN01 FN01
2400
A-000 Schedules - Building Shell I
CL01 A-001 Site Plan I
LT02 LT02 LT02 LT02 LT02 LT02 LT02 LT02 A-100 Ground Floor Plan I
A-101 Roof Plan I
C C A-200 Elevations I
A-300 Ground Floor RCP I
A-500 Section & Details I
I Moved ramp, Added deck, stairs & windows 15.07.2020 CB
H Moved Staff Room 30.06.2020 CB
3400 3400 3450 3400 3450 3400 3450 3450 3450 G Bigger Breakout Room 2 29.06.2020 CB
F Adjusted Building Location and added RL's, Moved Stairs and 26.07.2019 JP
Module 1 Module 2 Module 3 Module 4 Module 5 Module 6 Module 7 Module 8 Module 9 Ramp
E Resizing of Buildings and Layouts. Relocated Office Moved 19.07.2019 JP
D For Client Approval 31.08.2018 IC
Iss. Description Date By
1. Ground Floor RCP
1 : 100
FOR APPROVAL
General Notes & Disclaimers
COPYRIGHT AUSCO MODULAR PTY LTD. THIS DOCUMENT MAY NOT BE
• Wall/Ceiling/Roof frames built to Ausco REPRODUCED OR HAVE ITS CONTENTS DIVULGED WITHOUT WRITTEN
Backbone framing design standards. Title
AUTHORITY.
• Building chassis designed to Ausco
Standard Chassis drawings.
• All work must be done in accordance with
Ground Floor RCP
Manufacturing - Ceiling
Frame Tag
Manufacturing - Electrical Equipment
Description Phases Qty. Installed
the relevant Australian/New Zealand
Standard(s) and the National Construction
(MQB)
Tag Frame Crs. Lining Insulation EQ01 PE Cell 3 By Ausco
Code.
CL01 Engineered steel frame, 400 Versilux, 6mm, H-mould (White), to - EQ02 Smoke Alarm 240V 1 By Ausco • Furniture, plumbing, & electrical
75mm "Lipped C" section eaves & verandah representations are indicative. Appearance Project
CL02 Engineered steel frame, 400 Plasterboard, 10mm, TSF (White) R4.0 Glass
Manufacturing - Lighting Fixtures
may vary depending on supplier. 30.85x12m Learning Centre-
• Loose items to be packed for transport.
SG (B190)
75mm "Lipped C" section Wool Bats
Tag Description Lamps Qty. Installed • Site, stairs, ramp and building skirting
Client
Manufacturing - Mechanical LT01 Light, Emergency Exit compliant to AS2293.1, ceiling 1 6 By Ausco indicative only. Size, fall and location to suit
Tag Description Qty. Installed
mounted site conditions. Constructed to comply with Good Shepard Lutheran
LT02 Vandal resistant light, 18W, clear 1 13 By Ausco AS1428.1.
ME01 AC, Split system, indoor unit, 7.1kW pipework concealed in wall 5 By Ausco LT03 Fluorescent batten, 2x36W, diffused 2 38 By Ausco Manufactured to Wind Speed: B190 College
ME02 AC, Split system, indoor unit, 5.0kW pipework concealed in wall 4 By Ausco LT04 LED 3W Emergency Surface Mount 1 By Ausco Manufactured in: MQB
ME03 Split System Reverse Cycle, Outdoor unit, packed and installed on 9 By Ausco
site
Intended Location: Noosaville, QLD
ME04 Ceiling fan, 1400mm 15 By Ausco
Manufacturing - Electrical Fixtures
Client Approval Drawn By Drawn Date Scale
A2
Tag Description Qty. Installed
EE01 Draw wire, with plate 31 By Ausco Client: Good Shepard Lutheran College IC MAR 18 1 : 100
EE02 GPO, 2 gang, 10A, single pole 32 By Ausco Checked By Check Date
Approved by: DIMENSIONS ARE IN MM
EE03 Isolator Switch, 20A, single pole WP 9 By Ausco
AAD MAR 18
15/07/2020 7:01:07 PM
EE05 Switch, 2 gang, 1 way, single pole 4 By Ausco DO NOT SCALE
Company: Project No. Order No.
EE06 Floor Box, flush mounted, -'Commander F4BP' 2 x GPO 2 gang 2 By Ausco
10A single pole & 4 x Draw wire with plate
EE09 General purpose outlet, weatherproof, 10A, single pole 6 By Ausco
Date (dd-mm-yyyy): 0240100047 -
Drawing No. Sheet Issue
EE10 Switch, 2 gang, 1 way, single pole - Ceiling Fan 4 By Ausco
- A-300 I
Signature:
Designed by: Brisbane
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.