Original source · versioned page text
APPROVED Negotiated Decision Notice MCU17/0028
Officer: Patrick Murphy Direct Telephone: 53296436 Our Reference: MCU17/0028, REC17/0012 & OPW17/0120: Your Reference: 16/4325 20 November 2017 Tea 4 Two Pty Ltd TTE C/- Max Watterson & Associates PO Box 639 COOROY QLD 4563 Dear Sir/Madam Negotiated Decision Notice Sustainable Planning Act 2009 I refer to your application and the representations you made in respect to the decision notice. On 16 November 2017 Council decided your representations. Details of the decision are as follows: application details Application No: MCU17/0028, OPW17/0120, REC17/0012 Street Address: 23 Tewantin Road Cooroy Real Property Description: Lot 102 C 5604 Planning Scheme: The Noosa Plan (28 October 2016) Decision details Council on decided to issue the following type of approval: Development Permit for Material Change of Use of Premises - Multiple housing Type 2 - Duplex Development Permit for Operational Work (Engineering Works) Development Permit to Reconfigure a Lot - 1 Lot into 2 Lots In relation to representations, Council on 16 November 2017 decided to: A. Refuse to delete condition 3. B. Refuse to change condition 29. Relevant period of approval The relevant period for this development approval is 4 years starting the day that this development approval takes effect assessment manager conditions Material Change of Use Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date T42S1 Site Plan 15.03.2017 T42E1 Elevations - Existing house 15.03.2017 1 of 6 Site Plan drawn by Ausmar 13.03.2017 2 of 6 Ground Floor drawn by Ausmar 13.03.2017 3 of 6 Elevations drawn by Ausmar 13.03.2017 4 of 6 Elevations drawn by Ausmar 13.03.2017 Dedication Prior to the commencement of the use a two (2.0) metre wide strip extending across the full length of the frontage to Olivine Lane is to be dedicated to Council as ‘Road’. Roof pitch and eaves The roof of the new dwelling must have a roof pitch of no less than 12 degrees and have minimum 600mm eaves to at least 75% of the perimeter of the building. Landscaping The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan for that specific area. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. External Works All works required in the Tewantin Road road reserve must be completed prior to the commencement of the use. Site Access and Driveways A sealed access driveway must be provided from Tewantin Road and Olivine Lane to all parking and manoeuvring areas of the development. The works must include in particular driveway crossovers generally in accordance with Council’s standard drawings RS-049 and RS-050 Tewantin Road. Approval from the Department of Transport and Main Roads for the final design of the site access and driveway works in Tewantin Road must be submitted in writing to Council prior to the commencement of the works. All works must be completed and accepted by the Department of Transport and Main Roads prior to the commencement of the use. Olivine Lane The existing access driveway from Olivine Lane may be retained provided that certification from a Registered Professional Engineer of Queensland (RPEQ) is submitted to Council. The certification must state that the driveway is in good order and is suitable for the intended use. If the certification cannot be provided the existing driveway must be removed and replaced with a compliant driveway. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. Fencing and Walls Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary must either: not exceed a maximum height of 1.2m be of open construction. The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Car Parking Car parking spaces must be provided and marked on the site in accordance with the approved plans. The car parking must include in particular cross falls and gradients in accordance with Australian Standard AS/NZS2890.1:2004. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The development must be constructed so as not to concentrate or redirect stormwater runoff onto neighbouring properties. Electricity and Telecommunication Services Reticulated electricity and telecommunication services must be provided to each lot in accordance with the standards and requirements of the relevant service provider. Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments. Where the development involves excavation or filling over, or adjacent to, drainage, water supply or sewerage infrastructure, all access chamber surface levels must be adjusted to provide a freeboard of 100mm above the finished ground surface level. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. RECONFIGURING A LOT Plan No. Rev. Plan/Document Name Date 16-4325AA Plan showing details of Lot 102 on C5604 drawn by Max Waterson and Associates 20.12.2016 16-4325AB Plan of proposed Reconfiguration of Lot 102 on C5604 (Community Title Scheme) drawn by Max Waterson and Associates 30.03.2017 Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for plan sealing. operational works APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 1622-01 C Site Plan prepared by Callaghan and Toth for that part within the subject site June 2017 1622-02 C Driveway Layout & Sediment Control Plan prepared by Callaghan and Toth for that part within the subject site June 2017 1622-03 C Driveway Detail Plan prepared by Callaghan and Toth for that part within the subject site June 2017 1622-06 C Structural Detail Plan prepared by Callaghan and Toth for that part within the subject site June 2017 1622-07 C Driveway Longitudinal Section prepared by Callaghan and Toth for that part within the subject site June 2017 T42L1 Landscape Plan 15.03.2017 PRIOR TO COMMENCEMENT OF WORKS Engineering All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “pre start” meeting. A condition report including photographs of the frontage of the site (Olivine Lane and Tewantin Road) must be completed and submitted to Council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction; Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased; Proposed fencing to the site during the construction phase of the development; Adequate parking arrangements for construction workers. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Works programme identifying key components of the works and their respective durations. Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues. identification of complaint management procedures including: contact details for the on-site manager; dispute resolution procedures. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction must be notified to Council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. Landscaping Works The development must be landscaped in accordance with these conditions and the approved landscape plans prior to the commencement of use. A minimum pot sized 100L street tree must be installed in the Tewantin road frontage and: Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC). Be located in accordance with engineering requirements for safe vehicle and pedestrian sight lines. Be of an approved Council species suitable for the location and of local origin. Planted in accordance with Planning Scheme Policy 3 Landscaping Plants and Guidelines. Landscape works must be supervised, undertaken and certified by a horticulturist. All works must be completed in accordance with this Decision Notice. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Pavement Design and Construction Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Electrical conduits or other services proposed to be installed within existing and proposed road reserves under existing sealed carriageways, concrete pathways, concrete/sealed driveways or significant vegetation must be installed by boring. Trenching is not permitted, unless specifically approved by Council. Site Access and Driveways Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossovers/driveways: The driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. The driveway must be constructed so as not to concentrate or redirect stormwater runoff onto neighbouring properties. Underground service conduits for water supply, electricity and any other services must be provided as part of the access driveway. Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path. The property access must be located a minimum of 1m clear of existing power poles, streetlights or other signage. The developer is responsible for any necessary relocation of existing services to provide this clearance and must contact the relevant service authorities and comply with their requirements in relation to these works. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing the Plan of Survey. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (e.g. by blocking or interfering with natural overland flows). Construction of all internal stormwater drainage works must comply with the relevant section/s of Australian Standard AS/NZS 3500.3. Environment Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). Prior to the commencement of the use, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to advisory notes). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. A final inspection and approval of the new works and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange for the inspection. referral agency conditions The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Schedule 7, Table 2, Item 2 – State Controlled Road The agency provided its response on 7 June 2017 (Reference No. SDA-0517-038949). A copy of the response is attached. Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Schedule 7, Table 3, Item 1 – State Controlled Road The agency provided its response on 7 June 2017 (Reference No. SDA-0517-038949). A copy of the response is attached. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Preparation of a Preliminary Construction Management Plan A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges). property notes Not Applicable preliminary approval overriding planning scheme Not Applicable further development permits required Development Permit for Building Work self assessable codes Not Applicable submissions Not Applicable reasons/grounds for approval The Assessment Manager considers the decision conflicts with the planning scheme and the following are sufficient grounds to justify the decision despite the conflict. Refuse to delete condition 3 for the following reasons The condition is consistent with the Noosa Plan requirements for the Cooroy and Lake Macdonald Locality and surrounding properties consistently have roof forms of at least 12 degrees. The roof of the new dwelling will be visible to adjoining properties and from Kauri Street. The increased height attributed to the increased roof pitch will not result in development that is excessively bulky. Refuse to change condition 29 for the following reasons: Community Management Statement’s do not regulate development and provide no certainty as to what development will occur on the site. The proposed change is contrary to the outcome intended by the Noosa Plan as the Noosa Plan only permits smaller lots through community title subdivision where there is an approved development and the lot size is reflective of the approved development. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. DECISION NOTICE HISTORY Original Decision Notice 17 August 2017 Negotiated Decision Notice 16 November 2017, Yours faithfully Patrick Murphy Acting Manager, Development Assessment cc: Unitywater SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Enc: Appeal Rights Infrastructure Charge Notice Referral Agency Response Approved Plans/Documents Referral Agency Response SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] PD-DA-FM387/1-13/04/2010 Page 10 of 3 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 15 [word/footer3.xml] Page 13 of 15 [word/footer4.xml] PD-DA-FM387/1-13/04/2010 Page 1 of 3 [word/header3.xml] MCU17/0028 [Attachment: image4.png (image text)] a mm NOOSA COUNCIL [Attachment: image5.png (image text)] rmatgnoosa qagov au Attention: Patek Murphy esr warty Concurrence agency reponse—wttnconation 123 Tewantn Roa, Coooy QLD 4553 (Lat 102 on C5604) “Tne ete agency mate he development apptaondescrbed Dew was receved by ie Department or ntartuchre, Local Govemment and Planing under section 272 ot ‘ne Sustanatie Panning Ac 2008 on 3 May 217 Appcant tame ‘Apleant name: ‘Tea Two Py Ls Cr Max Waterson &Assocaies ‘Aplcant contact detats: PO BOXES ceegrasureys.com au te deta ‘ort some 23 Tewartn Rag, CooroyGLD A563 Laton pa: Lot 12 0 os608| Localgovermentarea: Noosa Sue Count Appeation detae Proposed devenpment Deviopnant Peri br Maier Change of USE oF Promises (Muse neuing Type 1 Dies) ‘Development Pernt for Rezontgurng 3 Lat 1 Leto 2 [Attachment: image6.png (image text)] ts) Beggar Pert operate Won egrets Aspects of development ana type of spprovs being sought Nature! Approval] Biet Proposal ot Tat evelopment _| “Type ‘Description aseesemant ‘seria Change | Sevecomen’ | Watpenavsng TypeT= [Cade Assessment use pemt [owes ‘econiguinga | beveopnent | tata 7a CET oe peme a a TE ESSERE pent eteral tigger “The cevslomantappicaton wae rerio daparnen under ne lowng proves ofthe Sutana Planning Reguiaton 200% Reteralngger ——Seheaue 7, Table, tem 2 State-contearoad cconatons ner secon 26712 oe Sustanane Planing Act 2009, econo set out _Atachment 1 mst ataced o any evelopment appro ‘Reasons for dectston to imposs conations ner secon 2691) one Susanne Panning Ac 2008, te department must stout he ‘reasons oe detsion o mposecondBons. These feasons are se oun Aachen 2. Furner saves “The cepanment ters urner ave about ne appoint he ppcant. The save est Approved pan and epectestions “The department requres the flowng Pan and specoabons set out eow adn _Atacoment «must be atacea o any getlopment appro ‘Drawinghaport Tile] —Pepareay | —Dala —] Retarancs | vasionioua| spk a av eopT Maal Sange ose an RaSoTNG ae. Sir [Eases [Sosa rest scopy of hs reponee nae been sto th apleat nar intormaten,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.