Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                 CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1                                                                          8
                                 L
                 MAP   2.2 S ITE IOONSTRAINTS
                                    CNE
                                         LD                                                        2.4       CONSULTATION PROCESSES
                                            ON
                                               OV
                                                 AN
                                                    DR
                                  EE
                                     NI
                                                                                                   Section 19.3.1.6 of the Strategic Plan requires that
                                        EC                  Potential Elf                          the master plan will be prepared in consultation with
                                          RE                                                        K RD
                 COMMERCE CT                 EK             Skink Habitat                 EENIE CREE
                                                RD                                                 relevant stakeholders including the developer, Noosa
                                                                                                   Council, State Government agencies and the local
LEO A
        LLEY R
                                                                                                   design community and the key stakeholders. It will
              D
                                                                                                   also include consultation with the general
                                                                                                   community.




                                                                      RO
                           ON ST
          ST




                                                                                                   In early 1999, Montbar Pty Ltd approached Noosa


                                                                        AD
                                                         Constraint
        ACTION




                                                                          13
                              TI




                                                                                                   Council for advice on Section 19.3.1.6. Noosa


                                                                             1
                       PRODUC




                                                                                                   Council gave consideration to the process for
                                                                                                   consultation that should be followed and protocols
                                                                                                   and guiding principles were established (Council
                                                                                                   Decision 15/04/1999). Consultation was to be
                                                                                                                                             a
                                                                                                   managed via a series of reference groups :
                                                            Significant
                                                            Constraint                             •       Design Reference Group;
                                                                                                   •       Business Reference Group;
                                                                                                   •       Community Reference Group; and


                                                                                                  •    State Agency Reference Group.
                                                                                                   This process commenced and continued until Spring
                                                                                                   1999, when representatives of Montbar advised that
                                                                                                   an application would be lodged. Up until lodgement
                                                                                                   of the application, the reference groups (including
                                                                             k




                                                                                                   Noosa Council representatives) had access to most,
                                                                          Cree




                                                                                                   but not all of that material accompanying the Montbar
                                                                       Eenie




                                                                                                   application referenced as Baseline Reports.
                                                                                                   From the Montbar application itself, the reference
                 The constraints that have influenced                               the            groups had not had access to:
                 considerations made in Map 2.2 have included:                                     a.    The various impact assessment reports;
                 •     Flooding;                                                                   b.    The Noosa Shire Business Centre MasterPlan;
                 •     Presence of acid sulphate soils;                                                  and
                 •     Ecological corridors;                                                       c.    The Material Change of Use Planning Report.
                 •     Proximity of potential development areas to                                 The process of consultation in the development of a
                       Eenie Creek;                                                                master plan initiated via Council’s decision of
                                                                                                   15/04/1999 remains incomplete. Therefore the
                 •     Environmental drainage corridors;                                           master plan accompanying the Montbar development
                 •     Potential elf skink habitat; and                                            application does not fulfil the requirements of Section
                                                                                                   19.3.1.6 of the Strategic Plan.
                 •    The location of the Noosa Airport.
                 For those areas that suffer significant constraint,
                 there are major influences for the development of the
                 site. Desirably, these areas should be left in their
                 natural state. For those other areas suffering
                 constraint, their influences are not as significant,
                 however there may be restrictions on the type or
                 scale of activity that can be supported in these areas.
                 2.3           CONSULTANT ADVICE
                 As part of the review of the Montbar application,
                 Noosa Council obtained advice from various
                 consultants. This Master Plan draws from that advice
                 and particularly that contained in:
                 •     Survey of Noosa Shire                     Retailers       (Urban
                       Economics, 2000a); and
                 •     Independent Review of the Strategic Plan
                       Provisions relating to the Noosa Shire Business
                       Centre (Urban Economics, 2000b).

                                                                                                   a
                                                                                                       The appendix at Section 6 on page 26 identifies
                                                                                                        membership of the various reference groups.
                                                                                                                                                               n
                                                                                                                                                          a Pla s
                                                                                                                                                        s
                                                                                                                                                   N o o uture
                                                                                                                                                 e        F
                 J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc                           Th o s ing
                                                                                                                                                  o
                                                                                                                                               Ch
Log in to download the original file

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1(PDF, 1MB).pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.