Log in to see the plans as drawnTRAFFIC MANAGEMENT
The first operation will be the installation of the micro piles and
excavation of footings. During this stage the builder shall engage
the services of a traffic management company to ensure there is no
interference to the general traffic using Park Road. Traffic
controllers will be required to be present to divert vehicles during
the installation of micro piles and excavation of footings.
Traffic controllers will divert all vehicle deliveries and departures to the
site on Park Road. The timing of deliveries shall be such that they do
not coincide with peak usage times in Park Road.
Refer to Traffic Guidance Scheme prepared by Evolution Traffic
Control for details of proposed traffic management.
The builder warrants that using the procedures nominated above the
elevated terrace can be safely constructed with minimal impact on the
environment oincluding the protected trees.
Original Construction management plan produced by
STEFAN PRYSTUPA, B.Eng (Civil); M.I.E.Aust; C.P.Eng; RPEQ Sep 2017
JOB NO. 17543
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.