App B - Effluent Information

of 16

Page text read automatically using OCR, there may be inaccuracies

Appendix B
Effluent Information
Application for a Development Permit –
Material Change of Use for Short-Term
Accommodation in a 46.5m² dwelling.

122 Musa Vale Road, Cooroy 4563 QLD
Lot 304 on SP118015




James Austin & Jody Austin




                                      22nd April 2026

Log in to download the original (App B - Effluent Information.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 15 pages

Page 2

                                                                                  Building & Plumbing Services
                                                                                    Direct Telephone | 5329 6480
                                                                            Email | [email protected]




                                                                                Application Number PL23/0174

                  25 June 2024


                  Dream Modular Homes
                  Invalid Address


                  Dear Sir/Madam

                                       Compliance Certificate For PL23/0174
                                           Plumbing and Drainage Regulation 2019
                  1.        PROPERTY DETAILS

                  Application No:              PL23/0174
                  Street address:              122 Musa Vale Rd COOROY QLD 4563
                  Real property description:   Lot 304 SP 118015

                  2.        APPLICATION DETAILS
                  Secondary Dwelling - 8 Fixtures & AES
                  3.        INSPECTION RESULTS

                  Council's decision is to issue a Compliance Certificate for the regulated work (that is
                  plumbing and drainage work and/or on-site sewerage work) in relation to the scope of work
                  mentioned above.
                  The work was inspected on the following dates at the respective stages. Where a stage of
                  work was not assessed by a Council Plumbing Inspector; a Form 3 - Covered Work
                  Declaration was obtained from the responsible person.

                       STAGE OF WORK                                                 INSPECTION DATE

                       Drainage                                                      07/11/2023
                       Land Application Area                                         20/10/2023
                       Final Inspection                                              12/01/2024

                  If you have any questions about the content of this Certificate, please contact Council’s
                  Plumbing Services as detailed above.

                  Yours faithfully




                  Owen Hewitt
                  PLUMBING INSPECTOR




Document Set ID: 23075699
Version: 1, Version Date: 25/06/2024

Page 3

                  cc

                  JL Austin & Mr JN Austin
                  130 Kadumba St
                  YERONGA QLD 4104




                  WR GARLAND
                  37 THE DECKS
                  WURTULLA
                  QLD 4575




Document Set ID: 23075699
Version: 1, Version Date: 25/06/2024

Page 4

       GENERAL NOTES: This form is to be used for the purposes of section 81 of the Plumbing and
       Drainage Regulation 2019 (PDR).

       1. Description of                 Street address (include number, street, suburb/locality and
          land                           postcode)
                                         122 Musa Vale Rd COOROY QLD 4563
                                         Lot and plan:
                                         Lot 304 SP 118015
                                                                                                            Local
                                         Shop/tenancy                                                       government
                                         number                               Storey/level                  area
                                                                                                            Noosa
                                         (if applicable)                      (if applicable)
       2. Permit details                Permit number                                     Date issued
                                         PL23/0174                                        13 July 2023

       3. Declaration/s
                                       1.        This certificate applies to all of the work authorised to be carried
                                         out under the permit
       Local government or
       the public entity may in         or
       certain circumstances
       accept verification from        2.        This certificate applies to part of the work authorised under a
       the responsible person            permit.
       that certain work not
       inspected     by     local
       government complies              If two (2) applies, provide a description of work covered by the certificate.
       with    the      relevant
       standards.
       4. Certification                This form certifies that the relevant local government or the public entity
                                       has decided to issue a Final inspection certificate for the work described
                                       above.

                                         The work is compliant, operational and fit for use.

                                        Date the inspection was carried
                                                                                             12 January 2024
                                        out

                                        Certificate number (if applicable)                   Not Applicable

                                        Issued by
                                                                                             Noosa Council
                                        (insert local government name/public entity)


                                        Date issued                                          25 June 2024




Document Set ID: 23075699
Version: 1, Version Date: 25/06/2024

Page 5

 iDesign
                                                                                       Sunshine Coast Office
                                                                                       PO Box 6218
                                                                                       Mooloolah Valley Q4553
    wastewater                      solutions                                          P. 0407 887 321
    Biowater Designs Pty Ltd QBCC Lic 1049265                                          E. [email protected]




                                     PROPOSED DETACHED STUDIO


                                       SITE & SOIL EVALUATION



                                                    Lot 304 SP 118015

                                           Address: 122 Musa Vale Road, Cooroy

                                                   Area: 415650.84m2

                                                  Date: 21st April 2023

                                       Reference No: NC/2023/AES/122MusaV




INDEX:

1.0 Introduction:
2.0 Site Description:          p2
                                                                    IMPORTANT DIRECTION
3.0 Soil Investigation:                                             Do not install from this design until it is
                                                                    Stamped and Approved by the Local Authority.
3.3 Soil Classification                                             Council may make changes to this design as part
4.0 Recommendations:            p3                                  of the approval process. Only install from Stamped
                                                                    Approved Plans and refer to the Approval Permit for
5.0 Design Calculation                                              possible changes.
5.1 AES Infiltration Bed Design: p4
AES Calculator            p5
7.0 Design Drawings       p6
                                                                                                                 reuse
7.1 Design Drawings       p7
Borelogs                  p8                                                                                     recycle

Site Classification       p9
                                                                                                                 retrieve
Articulation Joint Illustration      p10
Inspection Port           p11                                                 C Copyright Lance Picton 2023 design & content. 1/11

Page 6

1.0 Introduction:
Biowater Designs Pty Ltd, in accordance with AS/NZS1547-2012 ( Domestic Wastewater Management ) and the
Queensland Plumbing & Wastewater code (QPW) 2019 Version 1, was commissioned to undertake a Site & Soil Evaluation
in the Noosa Council at 122 Musa Vale Road, Cooroy.

The results form the basis of our recommendations for on site wastewater disposal.

Our site investigation and field work was performed on Tuesday 11th April 2023 after a period of dry weather.

The investigation was undertaken to determine the soil profile and Long Term Acceptance Rate (LTAR) of the site in order
to accommodate a proposed new 1 bedroom detached studio. No laundry facilities will be provided in the studio.

NOTE: This evaluation was undertaken at the owner’s request after considerable discussion regarding environmental issues
of this site and preferred design of the Land Application Area.




2.0 Site Description:
2.1 Existing Buildings: Main dwelling and sheds. The existing dwelling does not form part of this assessment.


2.2 Site Factors:
The site is a large rural allotment the area is 415650.84m2.

The proposed Land Application Area is moderately sloping (5-15%).

The proposed Land Application Area has very good exposure to sun and wind.

Erosion, mass movement or land slip was not observed on this site. There are no visible rock outcrops on this site.

The proposed Land Application Area has approximately 100% grass cover.

There are no creeks, dams, bores or waterways on the site or adjoining sites within the setback requirements under the
Queensland Plumbing and Wastewater Code for Advanced Secondary effluent.

No groundwater was encountered to a depth of 2000mm.

There is no evidence of fill in the proposed Land Application Area.

Rain water will not transverse this site from adjoining properties during heavy rains.

Concentrated run-off from this property will not transverse adjoining properties during heavy rains.

Soils were dry and there is no evidence of soil surface cracking in the LAA. No evidence of compaction or seepage areas.
Salinity is not evident.


3.0 Soil Investigation:

3.1 Drainage Pattern: Linear Planar
3.2 Method:
Soil testing was conducted by Ground Drill Pty Ltd on 11th April 2023 to a depth of 2000mm within the proposed
Land Application Area. See borelogs page 8.

The soils were visual one textually classified in accordance with Table E1 AS/NZS 1547:2012.
Strongly structured Light Clays. Category 5 adopted.

Smooth plastic ball that can be rolled into a rod; slight resistance to shearing between
thumb and forefinger; forms a ribbon 50-75 mm long. Category 5 adopted.
The Site Classification has been completed by Ground Drill Pty Ltd and indicates class “P” site. See page 9.
Articulation Joints are therefore required and must be designed by a suitable qualified person.


                                                                                  C Copyright Lance Picton 2023 design & content.   2/11

Page 7

3.3 Soil Classification



                                                    Soil Classification - Adopted
        Borehole Nos                                                                                  1&2
        Soil Category Adopted                                                                           5
        Indicative Drainage                                                                       Poorly Drained
        Structure                                                                                    Strongly
        Texture                                                                                    Light Clay
        Indicative Permeability P (m/d) as Ksat*                                                    0.12 - 0.5
        Recommended DLR (AS/NZS 1547 / 2012)                                                           10




      4.0 Recommendations:
      4.1 Treatment Facility:
     The on-site treatment facility to service the new studio is to be an Advanced Enviro-Septic System (AES). This
     system has a Chief Executive Approval # 15/2019 for Advanced Secondary Effluent. The Person Equivalent (PE) for
     this system is to be no less than 3.

     A new min 3000L all waste septic tank is to be installed to service the detached dwelling.

     All wastewater from the detached dwelling is to be directed to the septic tank then to the AES bed.

     The Land Application Area is to be an Advanced Enviro-Septic Infiltration Bed of 36m2.

     All work is to be done by appropriately trained and licenced plumbers/installers.




      5.0 Design Calculation - Detached Dwelling
      The serviceable life of the Land Application Area will be compromised if the design flow is exceeded. Any
      proposed changes to the position of the Land Application Area, System Type or House Design will require a
      reassessment of this site. For our calculations we have assessed the design flow as follows:

                                                    Design Calculation
         DLR (mm/d) (secondary quality effluent)                                                      10
         Hydraulic load (lt/day/person) Tank Water / 2 bedrooms                                       120
         Design Flow Q (lt/day)   PE: 3                                                               360
         Design sizing calculation                                                           L = Q /(DLRxW)
                                                                                                  = (360 / 10)
         Disposal area A+B (square metres) AS/NZS1547:2012                                           36m2
         Nominated Configuration (metres) AES System Design Calculations                 = 9m x 4m (L xW) 36m2
         A new min 3000L septic tank is required.                                            AES System PE 3




                                                                                  C Copyright Lance Picton 2023 design & content. 3/11

Page 8

5.1 AES Infiltration Bed Design.            Advanced Enviro-Septic System

The AES Bed Design is to be a gravity fed, below ground system. See system design drawings page 6.

The total bed base required is 36m2 (9m x 4m). Bed is to be installed as shown on the site plan. See drawings page 6 for bed
profile. A minimum 4m setback is required to any tree.

The entire bed base it to be ripped 250mm parallel to the AES pipes and gypsum applied at 1kg per m2.

Coarse washed sand will be referred to as “system sand” and must meet the specifications of the system manufacturer.
System sand will need to be placed around AES pipework and for the infiltration area as shown on the attached drawings.

System pipe bed dimensions (Area A) are 6.6m x 1.35m and a total minimum sand depth of 750mm. 300mm of course washed
sand is to be spread to form a base and 2 rows of 2 lengths of AES pipes installed as per the attached drawings.

A further infiltration area (Area B) is to be constructed around and below the pipe bed as per the site drawings and a minimum of
150mm system sand to be spread over the entire infiltration area.

Pipes are to be covered by a minimum of 150mm of system sand. A further 150mm of site soil is to be mounded over the sand to
prevent surface water entering the bed. After all settlement the AES Bed is to have a minimum 150mm cover of site soil.

Beds are to be constructed in accordance with the AES Design and Installation Manual and all plumbing works in accordance with
the QPW code. All site work is to be carried out by a licenced plumber and all AES horizontal pipes layed with the aid of a laser
or dumpy level to ensure absolute compliance with the manufacturers installation guidelines. This is critical for correct operation.

Oxygen Demand Vents are to be installed as per the AES Design & Installation Manual. The high vent (100mm - on the studio)
must be a minimum of 3m higher than the AES low vent and provide unrestricted air flow through the entire system.

Two Inspection Ports are to be installed, one in the centre of the pipe bed and another at the furthest point from the influent to AES
Pipes. See Installation Instructions Appendix A - page 11.

Care must be exercised to prevent machinery access on the AES bed during and after construction.




      6.0 Setback Regulations:

                                                                                  Secondary          Advanced Secondary
        Recommended Separations Distances - Surface Irrigation
                                                                                  Effluent                Effluent
          Dwellings & recreation areas                                                10m                   10m
          Water edge of swimming pools                                                 6m                    6m
          Property boundaries, paths & walkways                                    2m uphill             2m uphill
                                                                                   4m down hill          4m down hill
          Top of bank of permanent water course, creek, lake, waterway etc.             30m                 10m

          Bore or Dam for domestic or stock use                                         30m                   10m
          Vertical depth of seasonal water table                                       0.6m                   0.3m
          In ground potable water tank. Note some authorities require 15m               6m                     6m
          Sub-Surface Irrigation same as above except for;
         Dwelling & recreation areas                                                    4m                     4m

     NOTE: The local government authority may upon considering the public health and environmental risks
     reduce or increase the distances in the above table.
    Regards,




    Lance Picton jp.
    Site Classifier
    QBCC Lic: 1049265
                                                                                     C Copyright Lance Picton 2023 design & content.   4/11

Page 9

5/11


[OCR of page images]
 

 

’ ADVANCED
J ENVIRO-SEPTIC Advanced Enviro-septic Design Calculator v9.0 ©

“Always The First Option”
AES The World Leader in Passive Solutions ©

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Address 122 Musa Vale Rd Cooroy. State QLD Post Code
Client Name Jody Austin Date of Site Visit
Designers Biowater Design Pty Ltd Desaners Ph SO ieemadond “ence Meee
Lic Plumber TBA Pramber Ph TBA Plumb Drainer Le TBA
Council Area Noosa Designers AES 1 Date 21.04.2023,
This Calculator is a guide only, receiving soil classification, surface water, water tables and all other site constraints addressed by the qualified designer.
Enter AES L/m loading rate, "30" for ADV Secondary or "38" Secondary 30 >> This design is for an ADVANCED SECONDARY system
Is this anew installation Y or N Y >> Minimun single vent size is 80mm or 2 x 50mm house vents
Number of Bedrooms 1 >> This is not used in ANY Calculation. If not known use N/A or 0.
Number of persons 3 >> A septic tank outlet filter is NOT RECOMMENDED
Daily Design Flow Allowance Litre/Person/Day 120
Number of rows required to suit site constraints 2 >> The maximum length of a single AES pipe run is 30m or 10 PIPES
Infiltration Soil Category from site/soil evaluation. CATEGORY 5 >> Catagory may require design considerations. Ref AS1547
Design Loading Rate based on site & soil evaluation DLR (mm/day) 10 >> Soil conditioning may be necessary. Ref AS1547 & Comments.
Bore log depth below system Basal area 1.5m >> Min depth 1.5m. Check water table/restrictive layer
Is this design a GRAVITY system with no outlet filter? Y or N Y >> GRAVITY. A House Vent & LOW VENT required on this system

 

 

 

PLEASE CHECK YOU HAVE FALL FROM TANK TO AES SYSTEM PIPES

 

 

COMMENTS :-" The outcome must be important to everyone. "

- Ripping of receiving surface required in clay soil structures in Cat 4

 

In addition refer to AS 1547. Always excavate & rip parallel to the site slope/AES pipe.
- Specialist soils advice & special design techniques will be required for clay dominated soil having dispersive or shrink/swell behaviour. Refer AS1547
- Designers need to be familar with special requirements of Local Authorities. ie - Minimum falls from Septic tank outlets to Land application areas ete

- Plumbers are reminded good construction techniques as per AS1547 are especilly important in these soil types. Refer AS1547 & AES installation Instructions

AES System Calculator Outcomes AES dimensions

 

 

 

 

 

 

 

 

 

 

 

 

Total System load - litres /day (Q). 360 Wd AES System Extension Area
Min Length of AES pipe rows to treat loading 6.25 Im Length:(L)
Number of FULL AES Pipe lengths per row 2 Iths Width:(W)

‘Sand Depth

Total Capacity of AES System pipe in Litres 848 ltr, : 0.75m 0.15m

‘Area m2 8.9 m2 27.4 m*2
USE CUT LENGTHS OF PIPE IN THIS DESIGN? (ENTER Y) | | >>stope percentage must be 0% & infiltration footprint must be level for this design
IF YOU WISH TO USE A TRENCH EXTENSION DESIGN OPTION ENTER "Y" Y Enter Custom Width in metre 4
AES INFILTRATION FOOT PRINT AREA- L=Q/(DLR x W) Length Width Minimum AES foot print required
The length & width of excavation required for this design is >> 9.00m x 400m = 36.0 m2 total

 

 

 

AES pipes are best centered in the trench parallel to the site slope

 

 

 

   

 

AES System Bill of Materials. Chankar Environmental Use Only

AES-PIPE AES 3 metre Lengths required 4 Iths

|AESC AES Couplings required 2 ea

|AESO. AES Offset adaptors 4 ea a ADVANCED on

ENVIRO-SEPTIC

AESODV AES Oxygen demand vent 1 ea “Nature's Wastewater Solutions”

AES-IPB AES 100mm Inspection point base 2 ea

TD Kit 4 4 Hole Distribution Box Kit ea

TD Kit 7 7 Hole Distribution Box Kit ea Digitally signed by Steve Dennis

VS43-4 Sweet Air Filter VS43-4 ea DN: cn=Steve Dennis, o=Chankar

AES DESO Double Offset Adaptors ea Enviromental, ou=Design Review, |
email=steve@enviro-

TOTAL SYSTEM SAND REQUIRED (Estimate Only) 13 m3 .
septic.com.au, c=US
Please email your AES Calculator (EXCEL FORMAT), Site Layout & AES Design to Date: 2023.04.22 17:30:13 +10'00'
designreview @enviro-septic. comau— designreview @enviro-septic com au

 

[> The AES Calculator is a design aid to allow checking of the AES components, configuration and is a guide only. Site and soil conditions referencing AS1547 are
calculated and designed by a Qualified Wastewater Designer.
|> Chankar Environmental accepts no responsibility for the soil evaluation, loading calculations or DLR entered by the designer for this calculator.
|> AES pipes can be cut to length on site. They are supplied in 3 meter lengths only.
> AES ONLY supply AES components as detailed in the Bill of Materials.
> SEPTIC Tank & other components including SAND will need to be sourced from other suppliers. Refer to our WEBSITE www.enviro-septic.com.au OR 07 5474 4055
AES-Design-V9.0-Calculator © Copy Right - Chankar Environmental Pty Ltd 20/1/2022

 

 

 

5/11

 

 

Page 10

7.0 Design Drawings      This plan is site specific for 122 Musa Vale Road, Cooroy


                                                                                                                                                      9000mm

                                                                                                                                                      6000mm
                      Note:
                      Correct installation of connectors
                      in AES Manual page 9.                                                                                                                                                                         Inlet




                                                                                 1350mm
                                  level

                                                                                                                                                                   Inspection Port                                                                 Low Vent
                                        AES pipe
                                                   pack sand
                                                       under                                                                                                                                                                               300mm
                                                                                                                                                                                                                                                        Ground level
                                                                                          Area A


                                                                4000mm
                                                                                                               Infiltration Area (A) 9000 x 1350mm




                                                                                                      Area B                                                                      Entire bed base is to be ripped
                                                                                                                         Infiltration Area (B) 9000 x 2650mm                      250mm parallel to AES Pipes
                                                                                                                                                                                  Gypsum applied at 1kg / m2.




                                                                                                                                                                                   Not to scale
                                                                                      Inspection Port


                                                                                                                                          150mm



                                                                                                                                      300mm                               300mm
                 Imported sand (course washed)
                                                                                                                                                           150mm
                 Backfill with site soil min 150mm cover over sand                                                                        300mm                        Sand
                 and mound soil over bed to prevent water access.
                                                                                                                                         AES Sand Coverage Minimums



                                                                                                                                                                                                                     IMPORTANT NOTES PLEASE READ.

                                              troP noitcepsnI            mm003                                                                                                                           The installer MUST refer to the Advanced Enviro-Septic Design & Installation
                                                                                                   Natural Ground Level 6                                                                                Manual provided. If you do not have a copy of this manual please contact Chankar
                                                                                                                            % slope      Inspection Port                                                 Environmental and a copy will be emailed FREE.
                                                                             150mm
                                               150mm
                                                                                                                                                                                                         Sections C, D, & E of the Design and Installation Manual are of particular relevance
                                                                                                                                                                                                         when installing an Advanced Enviro-Septic System.
                                                                          300mm
                                                                                                                                                                                                         THIS IS NOT A SEPTIC TRENCH AND MUST BE INSTALLED AS PER THE
                                              300mm                                                                                                                                                      AES DESIGN AND INSTALLATION MANUAL GUIDELINES.

                                                                          Rip 250mm parallel to pipes. Gypsum 1kg / m2                                                                                   Ensure you have the correct sand and all fittings to complete the installation if you
                                                                                                      2650mm
                                                                                                                                                                                                         are unsure of anything please contact Chankar Environmental (07) 54 744 055 or
                                                           1350mm
                                                                         Scale 1:30 @ A3                                                                                                                 Biowater Designs 07 54 947 620 or 0407 887 321.




                                                                                                                                                                                                                                               C Lance Picton 2023 all rights reserved           6/11

Page 11

                                                                                                                            Proposed Cottage
  SITE PLAN; This design is site specific for 122 Musa Vale Rd, Cooroy.


                                                                                                                                                                                                                                                           INSERT




                                                                                                                                                                                                                                                                        Ac
                                                                   INSERT




                                                                                                                                                                                                                                                                          ce
                                                                                                                                                                                                                                                                            ss
                                                                                                                                  d a ry




                                                                                                                                                                                                                                                                               Rd
                                                                                                                                                  d
                                                                                                                                               ss R
                                                                                                                                   oun
                                                                                                                            e rn b
                                                                                                                        East 4m

                                                                                                                                           Acc e
                                                                                                                        139.4
Note:

Installer to select exact position and orientation of AES
system in vicinity of Bh1 & Bh2. and maximize setback
from large tree.                                                                                                                                  Site cut
                                                                                            Proposed 1
                                                                                            bedroom studio




                                                                                                                                                       12
                                                                                                                                                                Min 3000L septic




                                                                                                                                                       .4m
                                                                                                                                                                tank (indicative position)


 Notes: This report is based on information and                                                                                                                BH#1
 plans provided by the owner in addition to the
 site information at the time of investigation.                                                              Large
 It does not take into account any event, whether                                                            tree
 by human intervention and/or by nature that occurs
 after the date of the site investigation which affects                                                                           213.8 rn bounda            BH#2
 the results and findings contained within this report.
                                                                                                                                  South



 In the event that the site conditions change or
                                                                                                                                       4m
                                                                                                                                        e



 the proposed development is altered in any way,
 this office is to be notified to determine what if any
 affect they may have on this design. Should a
 re-design be required, further fees may apply.
                                                                                                                                                  ry




                                                                                                                                                                                                                                      C Lance Picton 2023 all rights reserved              7/11
 IMPORTANT DIRECTION                                                                                 Plan of:
                                                                          Biowater Designs Pty Ltd                                                      Client:                          This plan to be read in conjunction with the      All works must comply with AS/NZS1547:2012
 Do not install from this design until it is                                                         Lot 304 SP 118015                                  James & Jody Austin              attached report.                                  and the Qld Plumbing and Wastewater code.
 Stamped and Approved by the Local Authority.                             PO Box 6218
                                                                                                     122 Musa Vale Rd                                   Ph: 0405 602 750                 The proposed Land Application Area must be
 Council may make changes to this design as part                          Mooloolah Valley Q 4553
                                                                                                     Cooroy                                                                              installed and positioned as per this plan.
 of the approval process. Only install from Stamped                       Ph: 07 54 947 620
 Approved Plans and refer to the Approval Permit for
                                                               N          Mob: 0407 887 321
                                                                                                                                                                                         Construction of any permanent structures
                                                                                                                                                                                         within the designated area is prohibited.
 possible changes.                                                        Site Classifier:                                                              Date:                                                                              SCALE:
                                                                                                     Local Authority:                                                                    Care must be taken to ensure no traffic or fill                            Site Area: 415650.84m2
                                                                          Lance Picton jp                                                               21st April 2023                                                                    Approx 1: 350 @ A3       Land Application Area: 36m2
                                                                                                     Noosa Countil                                                                       in the designated area during construction.
                                                                          QBCC Lic 1049265

Page 12

Borelogs:




            8/11


[OCR of page images]
Borelogs:

 

Percolation Borehole Logs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Perct Soil Description Perc2 Soil Description

0 TOPSOIL SANDY SILT, Brown, Fine to 0 TOPSOIL SANDY SILT, Brown, Fine
Medium Grained Sand, With CL-Ci Clay, to Medium Grained Sand, With CL-CI
Firm, Dry to Moist Clay, Firm, Dry to Moist

100 |SANDY CLAY (CI-CH), Orange Brown, 100 |SANDY CLAY (CI-CH), Orange
Fine Grained Sand, With Fine to Coarse Brown, Fine Grained Sand, With Fine
Grained Gravel, Trace Silt, Firm, Dry to Coarse Grained Gravel, Trace Silt,

Firm, Dry

200 200

300 300

400 400

500 500

600 600

700 700

800 800

900 900

1000 1000

1100 1100

1200 1200

1300 1300

1400 | SANDY CLAY (CI-CH), Mottled Grey 1400 |SANDY CLAY (CI-CH), Mottled Grey
Brown, Fine to Medium Grained Sand, Brown, Fine to Medium Grained Sand,
With Fine to Coarse Grained Gravel, With Fine to Coarse Grained Gravel,
Stiff, Dry to Moist Stiff, Dry to Moist

1500 1500

1600 |Perc1 Terminated 1600 |Perc2 Terminated

1700 1700

1800 1800

1900 1900

2000 2000

2100 2100

2200 2200

2300 2300

2400 2400

2500 2500

*- DCP restarted down the borehole

PP- Pocket Penetrometer
SS — Shrink-Swell

SWL -Standing Water Level
1SS-indicative Shrink-Sweill

R - Refusal

 

8/11

Page 13

9/11


[OCR of page images]
 

 

Introduction

The purpose of this report is to classify the site in accordance with AS2870-2011. This report
is based on the field investigation/Iab testing and information if any provided by the client.
This report relates exclusively to the tested locations and the above-mentioned structure.
Further investigation may be required. Bore logging was carried out in accordance with
AS1726-2017 Geotechnical Site Investigations.

Site Classification

Class “P” (Due to uncontrolled fill, poor bearing capacity &
trees)

Based on the soil profiles the site would have the characteristics of
an 'H1' site with an approximate Ys of 40-45mm if not a “P”.

Important Notes Relating to the classification. Attached.

Allowable Bearing Capacity

An approximate bearing capacity of 100kpa was encountered as per the below:
* 1200mm below existing ground surface level in the Silty CLAY at BH1.
700mm below existing ground surface level in the Silty CLAY at BH2.

This is a suggested founding depth only, greater depth may be required due to the following.
Bearing capacity can be highly variable over the allotment these depths are specific to the
test locations. Actual founding depth should be nominated by the designing engineer whilst
taking construction and footing type, fill, underground services, retaining walls, settlement,
proposed cut/fill and any trees into account.

 

 

9/11

Page 14

                                                 Articulation design can be prepared by the following people:
Illustration Only: Articulated Plumbing Joints   • a Registered Professional Engineer of Queensland with relevant competency
                                                 • a person who holds a hydraulic services design licence issued by the QBCC under the QBCC cAt
                                                 • a person who holds either a trade contractor or nominee supervisor plumbing and or drainage
                                                 licence issued by the QBCC under the QBCC Act.
                                                 They can only prepare an articulation design for work that is for: o the licensee's personal use, or o
                                                 use in drainage work to be performed by the licensee personally.
                                                 Due to the specialised nature of articulation design, it is recommended that practitioners are
                                                 experienced in this field and are confident in their ability to undertake the work competently.”




                                                                                                                                                10/11

Page 15

                                                                                                                11/11




                                                                         -
                                                                         o
                                                                                                  t-
                                                                                                  lL
                                                                                                  o
                                                 {U                      E
                                                                         E                        l-
                                                                                                  5
                                                 \t
                                                 ()
                                                                         5
                                                                         3'                       o
                                                                         lr                dr-
                                                                         2                 2
                                                                         o
                                                 $u                      C'
                                                                                           td
                                                                                           c'
                                                 63                      E
                                                                          o
                                                                          L
                                                                                           !,
                                                 o\1
                                                 ts                      !(t
                                                                         td
                                                                         iE
                                                                         CI
                                                 H*                      UI
                                                                   -,li H
                                                                   l-
                                                                   l-
                                                                   F
                                                                   tJ
                                                                   ."
                                                                   lrl
                                                                   o
                                                                   E
                                            a                      o-
                                            =
                                            6                                  |o    rO
                                                                                     tF
                                                                                                       rt
                                                                                       t                    a
                                                                              (F     1a-               rF
                                                                              .?
                                            F                                 o  a
                                                                                     o                 3    a
                                            g                                 ct     ct                C}
                                            Ut
                                                                         u
                                                                         I
                                                                         l-                            $
                                                                   0*
                                                                   ut i;
                                                             $
                                                             {
                                                       051   il    9d
                                                             ln    as
                                                             =:
                                                             HR r inz
                                                                  l{ut
                                                             IFi
                                                             F$E
                                                             €rt
Appendix A - Inspection Port Installation




                                                                                            t.,;.o
                                                                                                       -
                                                                                                       J
                                                                                            E
                                                                                            LlE
                                                                                               6
                                                                                            IK
                                                                                            3tr
                                                                                            i5
                                                                                            iE,I
                                                                                            HE
                                                                                            zvt
                                                                                                g,
                                                                                            Ei
                                                                                             .a
                                                                                            1?N
                                                                                                       .l
                                                                                            rd h,
                                                                                            l-F
                                                                                            9?

Page 16

.
G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.