                                                                                                                            ~ FAWNG OBJECTS                                                                      S, MANUAL TASKS                                                                               7, CONRNED SPACES
                       WHS Report Notes
                       1. FALLS, SUPS TRIPS                                                                                 LOOSE MA TERJALS OR SMALL OBJECTS                                                    Components lllithin this design with a mass in excess of 25kg shoIJd be lifted                EXCAVATION
                                                                                                                            Construction, mainlenaoce or demolillon worK on or crOLI"ld this bUilding is         by two or more workers Of by mechanical lifting device. V\t1ere this is not                   Construction of this building and some maintenance on lhe building win require
                       .} WORKING AT HEIGHTS                                                                                likely to involve persons working above ground level or above floor levels.          practical. suppliers or fabricators should be required to limrt lhe COOlponent                excavation and installation of tlems wtlhin exca~ations. Wlere practical.
                                                                                                                            'MEre lhis OCOJrsone or more of the following measll'es should be taJ<ento           mass.                                                                                         inslallalion should be carried out using meltKids which do not reqUlre wcaers to
                       DURING CONSTRUCTION                                                                                  avoid objects falling from the area where the work is being carried oul onto         AI material packaging, building and maintenance componenls $/"lOiAd cle<:uly                  enter ttle exca\latlon. 'Mlere this is nOl practICal, adequate support for the
                       'Mlereve! possible, components for this buildlflQ should be prefaOlicaled off.                       persons bekYw.                                                                       sOOwthe total mass of packages ¥ld where practical att tlems should be stored                 excavated area srould be provided to prevent collapse. Wamng sig'ls and
                       s~e or at ground le'lello minmise the risk of wor1<~ faning more than two                            1.              Prevent Ol' restriCt access to areas below where the WO(k is         on Me in a way wt\ich minimises bending before liftlOQ. Advice shoutd be                      barriers to prevent accidental or unauthorised access 10 an excavations should
                       metres. However, construction of this building will feqJire wor1<ers 10 be                           being carried out.                                                                   provided on safe lifting methOOs in all weas where lifting may occur.                         be provided.
                       working at heights where a fall in excess of two metres is possible and irljury                      2.              Provide toe boards 10 scaffolding Ol' work platforms.                Construclion, maintenance and demolrtion of this building will rel:f,lire the use of          ENCLOSED SPACES
                       is likely to resul frtr'n such a falL The builder should provide a suitable barrier                  3.              Provide protective Slruclure below the work a'ea.                    portable tools and equipment. These should be fully mafllained in accordance                  Enclosed spaces wittlin thiS lxJildng may present a risk to persons entemg for
                       wherever a person is required 10 wor1l. in a Sltualioo where laUing more than                        4.              Ensll'e thal all persons belON the work il'ea have Personal          with marufaetu"er's speciflC3licns and not used 'Nhere faulty or (in the case of              oonslnJdion. mainten3'1ce or any other purpose. The desi!11 doCLmentahon
                       two metres is a possibihty,                                                                          Prolective Equipment                                                                 electrical el:f,lipment) nol carrying a current electrical safety tag. AJI safely             calls for waming signs  em     barrier5 to lI'l8lJlhorised access. These should be
                                                                                                                                                                                                                 guards or devices should be reg.Jlariy d'lecked ai1d Personal Protective                      maintained throu~         the life of lhe building. Wlere workers are required 10
                       DURING OPERATION OR MAINTENANCE                                                                      BUILOING COMPONENTS                                                                  Equipment should be used in accordance wtlh mamiaCl:lJ'ers SpecifICation.                     enler enclosed spaces air testing equipment aoo Personal Protective
                                                                                                                            Oiling construction. renovation or demolition of this blildlng. parts of the                                                                                                       Equipment should be provided..
                       Cleanng and mainlentl1ce of mOOws. walls. roof or other components of this                           structure rou(jng fatricated steelwork, heavy panels m ffii'J'ly other               6. HAZAROOUS SUBSTANCES
                       buildlll9 will require persons 10 be situated Yhlere a fall from a heighl in excess                  compooents will remain standIng priC't' 10 or after supporting parts are in place.
                       of two metres is possible. Y\t!ere this type of activity is required. scaffolding                    Contractors shoold ensure thallemporary bracing or other required support is          ASBESTOS                                                                                     8. PUBUC ACCESS
                       ladders or trestles should be used in accordance with relevant codes of                              in place at all times when collapse whid'l may injure persons in the area is a        This building may have been constructed prior to 1990 and therefore may                      Public access to construction and demoltlion srtes lWld to areas lIlder
                       practice. regulations or legislation.                                                                possibiltly.                                                                          contain asbestos either i1 cladding malerial or in fire relardant insulatiorl                maintenance causes risk 10workers and public. Warning signs and secLl'e
                                                                                                                            Mechanicallrtting of materials and components dlling construclioo,                    material. The builder shoLJd dleek and. d necessary. take aPJ:foprla1e action                barriers to lI1aulhorised access should be ;:tovided. Wlere electrical
                       b! SUPPERY OR UNEVEN SURFACES                                                                        maintenance or demolition ;:tesents a risk of falhng objects. Contractors             before demolishing, e:uttng, sanding, ciilling or ottlerwise disturbing the existlflg        installalioos. excavations. plCl1t or loose materials are presenllhey should be
                                                                                                                            should ensure thai appropriale lifting devices are used. thai loads are properly      structure.                                                                                   secured wtlen not fully supervised.
                       FLOOR RNISHES                                                                                        sectred WId that access to areas below the load is prevented or reslricted.           POWOERED MATERIALS
                                                                                                                                                                                                                  Many materials used in the conslruclion of this building can cause harm if                   9. OPERATIONAL USE OF BUlLOING
                       The owner is responsible for the selectoo of Slrface finishes in the peOestri3'l                                                                                                           inhaled in powrlered form. Persons workirYJ on or in the lxJildtlg cilring
                       trafficable areas of this bllilamg. SlI'faces soould be selected in accordance                       3, TRAFAC MANAGEMENT                                                                 construction. operational mainlenarce Of demolrtlOO should ensure good                        This building has been designed to requirements of the c1assiflCalion identified
                       wrth AS HB 197:1999 acd ASlNZ 4586:2004.                                                                                                                                                   venlilaUon and wear Personal Protective Equipment including protection againsl               on the drawings. The specific use of the building is not known allhe time of the
                                                                                                                            PiYking of vehicles or loadinglunloading of vehicles on this roadway may              irhalatlOn wNle using pOWdered material or when sWiding, drilling, cutting C1                design and a lLrther assessment of the worXplace heahh and safety issues
                       STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                             cause a traffic hazil'd. DurirYJ construclic;n, maintenance or demolition of this    otherwise dlsturtling or creating powdered material.                                          should be undertaken at the time of fit-out for the end-user.
                       Due 10 design restrictions for this buildng, steps andiex' ramps are IlduOed in                      building designated parking for workers and loading areas should be provided.         TREATED TIMBER
                       the building which may be a hazard 10 woriers carrying objects or otherwise                          Trained traffiC management persamel should be responsible for the                    The design ollhis tuilding i'ldudes provision for the irdusion 01 treated limber              10. OTHER HIGH RlSKACTMTY
                       occupied. Steps should be clearly marlled with both visual and tactile warning                       supervision of these areas.                                                          within ttle struch.re. Dusl or fumes from ttlis material can be harmful. Persons              All electrical work should be carried out in accocdance with Code of Practice
                       during construction. maintenance, demolrtion and at all limes when the building                                                                                                           WOf1I:ingon or in the building durng construction. operational maintenWlce or                 Managing Electncal Risks al the Workplace. AWl 3012 and all licensing
                       operates as a workplace.                                                                             Construelion of this buildng will require loading and lTIloading of materials on     demoltlion should ensure good ventilalion and wear Personal Prolective                        requirements.
                       Building owners aM occupiers should monrtor the pedestrian access ways                               lI1e roadway. Deliveries shovtd be well planned to avoid coogestion of loading       Equipment irclJdJng protection against inhalation of harmful material when                    AI 'NOI'k USing Plart shOLJdbe mea out in accordCl'lte with Code of Pr&cbce
                       and in particular access to areas where maintenance is routinely carried out                         areas and trained traffIC maMgefl'lent perSOlYlei should be used to supervise        Sandrig. OOlll'lg eutl'rlg or using {realeeltimber in any way tnal may cause                  Managing Risks 01 Plant at the VltJrkp/ace
                       to ensure that slXfaces have not moved Of cracked so lhat they become                                loadir'9lunloading areas.                                                            harmful material 10 be released. Do not blJl1 trealed limber.                                 All work should be carried out n accordance with Code of PractIce: Managing
                       uneven ~d present a lrip hazard. Spills, loose material. stray objects or any                                                                                                             VOLATILE ORGANIC COMPOUNDS                                                                    Noise and Preventing Hearing Loss at Work
                       other matter that may cause a slip or trip hazard shl:l\Ad be decrled or                             Busy constru::tion and demolition sites present a risk of colhsion where             Many types of glJe. solvents. spray packs. parns. vamishes and some cleaning                  Due to the history of serious irv;idents tl is recommended thai partiOJlar care be
                       removed from access ways.                                                                            deliveries and other traffic are movllg within the site. A traffiC managemeot        matenals and disinfectants have dangerous emissioos. Areas INhere these we                    exercised when undErtaking work ilvotving sleel c:oostruction and cooaete
                       CCIltradors should be required 10 maintain a tidy work sile dlling constructiOn,                     plan supervised by trained traffIC management personnel should be adopted            used shoLJd be kept well vertilated while the material is being used and fa' a                placement. AI the above applies.
                       maintenance or demolition 10 reduce the risk of trips and falls in the workplace.                    for the work s~e.                                                                    period after installation Personal Protective Equipment may also be required.
                       Materials for construction or maintenance shoold be stored in designated                                                                                                                  The manufacturer's recommendalions foe use must be carefully considered aI
                       areas 'iNlay from access wtftS and worX areas.                                                       ~ SERVICES                                                                           aJltimes.
                                                                                                                                                                                                                 SYNTHETIC MlNERAL RBRE
                                                                                                                            RLflltre of seNices durio;j excavalion or Olher activity creates a variety of        Fbeglass. rockwool, ceramic a1d other material used for thermal or sound
                                                                                                                            risks including release of hazardous material. Existing services are lcealed on      insulation may conlain synthetic mineral fibre which may be harmful if inhaled or
                                                                                                                            or aroond this site. \'\tlere known, these are iden1ified on the plans bUl the       if tl comes in contact with ttle skfi, eyes or other sensrtive parts or the body.
                                                                                                                            exact location and extent of services may vary from that indicated $ervices          Personal Protective Equipment irdJdlOg protection against ilhalation of
                                                                                                                            s/lolJd be located usirYJ <rI approlXiale service (slXil as Dial BefOfe You Dig).    harmful material sholJd be used when installing rernovirYJ or wortl:ing ne ••. bulk
                                                                                                                            appropriate excavation practice should be used and, where necessary.                 insulation material.
                                                                                                                            specialist contractors should be used.                                               TIMBER FLOORS
                                                                                                                                                                                                                 This building contains timber floors which have an applied finish. Areas where
                                                                                                                                                                                                                 flf'lishes are applied should be kepi well ventilated dlIing sCllding and
                                                                                                                           Overhead power lines ere near or on thiS s~e. These pose a risk of                    application and for a period after insta~ation. Persona! Protective Equipmert
                                                                                                                           electrocution if struck or approached by lifti1g devices or other plant and           may also be reql.ired. The manufacturer's recommenOations for use must be
                                                                                                                           persons 'NOrking above ground level. ~re        there is a danger of this             carefully considered at an times.
                                                                                                                           occurring. p:ov.'er lines should be. where pradlcal, disconnected or relocated
                                                                                                                           Wlere this is rot practical adequale warning in the form of bright coloured
                                                                                                                           tape Of s;gnage should be used or a prolective barrier provided.




,
I
j
!

Ijr.Rii'E'i:vIiInD:AATTE"'-----nD"Es<;;ci'Ri>liPPO'TliIO"NJ------TCs;cpiPErC"IF"'IC'"A
                                                          •.TnIOmiN'NliOiiTECi'<S'----"----------------------T----~--:----------------------,-;""=W.::;':;;nnE:::----------,----l

~
          A   24-'-'5ISSUED
                         FORCOMMENTS                                                      """",D""'''''~lO,,T'''''''",FE"'''!TO''''''D''''''''
                                                                                          l.AU.DlMl'6CHST08£CHfClICAHDYiWIEDONWaEFGU
                                                                                                                                                             PROPOSED SHOP ADDITIONS                                                                         sou       I       5   pac e
                                                                                                                                                                                                                                                                                                           l' 1071
                                                                                                                                                                                                                                                                                                          TE     5455 3651                                           SAFE DESIGN REPORT
                                                                                                                                                                                                                                                                                                                                                                                                                       A3
     :=                                                                                   CON!olEtKWG ,mOOOM
                                                                                          lAU~~TOCOMPl''''''lTHTlUtJlDltiGCOO£orfJJSTUUA,                                                                                                                                                                 P A U l @S 0 U l SPA C E ,C 0 M. A U

1I                                                                                        .
                                                                                          AflEVANTS.u.S1AIlPAROSMoiD lOCAl,lJJl}()R1!V   AfQ\JlAfMEPffi
                                                                                            wAmctOS£TlXlOA!iOPE~;hGIIlWAROSTO&EflmIlWITHUfTorF
                                                                                          HINGmOAU.OwTilfOOORTO![RE~OV[IlWHEIlClOSED.
                                                                                                                                                            LOT6 on N21827
                                                                                                                                                                                                                                                                                                          WWw     • SOUl 5PACE ,C 0 M ,A U


                                                                                                                                                                                                                                                                                                          OSSA lie 1160074      •   ABN 81600841459
                                                                                                                                                                                                                                                                                                                                                                  r,;;;;;;;---r;;;;;;;;;-;::-""T.=;;;;--!-';;;;---j
                                                                                                                                                                                                                                                                                                                                                                     OlUWN
                                                                                                                                                                                                                                                                                                                                                                     Paul Hindes
                                                                                                                                                                                                                                                                                                                                                                                                    ;~~~~15
                                                                                                                                                                                                                                                                                                                                                                                                    S;16:43 PM
                                                                                                                                                                                                                                                                                                                                                                                                                      5CAU
                                                                                                                                                                                                                                                                                                                                                                                                                      1: 200

i                                                                                         S",FE,," ••"~I'~'''_',,",,'COM''''''"'''~ IS NOOSA DRIVE, NOOSA HEADS
                                                                                          CO'6OO:TKlN                                                                                                                                                        bu,"ld,"ng des,"gn                           23 PALUMA ST SUNRISE BEACH QLD 4567                                -
                                                                                                                                                                                                                                                                                                                                                                     OAAWI ••••• "'G                                  RE'ilSION

I
'"
                                                                                          W6""W"'6CO'''''''''''              """"'''''''>1',00''''''
                                                                                          USEDV.1TltOUl THE (OIlSE'flOF 1I1f AlfIHQI(
                                                                                                                                                     FOR CAMMERAY INVESTMENTS PTY LTD                                                                                                                                                                                WD08                                             A
Log in to download the original file

MCU14_0053 - Response to information request.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.