Approved plan - Site Based Stormwater Management Plan - Job Ref SC-8407 - Revision B - 24 March 2020
Attached to the e-mail SARA Referral agency response with conditions - MCU20/0027 & RAL20/0004.
SC-8407 – 45 Maple Street, Cooroy 7 4.0 Stormwater Quantity Management 4.1 Background The subject site has an existing fraction impervious of 30%. The proposed works will increase this fraction impervious to approximately 80%. The proposed Medical Centre will subsequently require on-site detention to ensure non-worsening to the downstream drainage infrastructure. In preventing nuisance to the downstream Balance Lot, a formal inter-allotment drainage system is proposed in accordance with QUDM. The software package XP-STORM was used to model the site and calculate an on-site detention volume as described in the following sections. 4.2 Methodology XP-STORM V2017.2.2 has been used to model the site in its current and post-developed state. The modelling has been undertaken to determine detail design parameters of on-site detention to replicate pre- development peak flow rates. As the development falls within the ‘Commercial’ development category (QUDM), the (10% AEP) storm event was adopted for sizing the minor design drainage system. Events ranging up to and including the 1% AEP storm event were analysed to compare pre/post development discharges ensuring ‘non-worsening’. The development modelling and analysis undertaken was based on the information provided by the detailed site survey and preliminary architectural layouts.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.