Approved plan - Site Based Stormwater Management Plan - Job Ref SC-8407 - Revision B - 24 March 2020

Attached to the e-mail SARA Referral agency response with conditions - MCU20/0027 & RAL20/0004.

of 27

Page text read automatically using OCR, there may be inaccuracies

SC-8407 – 45 Maple Street, Cooroy                                                              9


4.3.5    Outlet Condition
The subject site is not impacted by regional flooding or tidal backwater.


4.3.6    On-Site Detention
It is calculated from the development site plan that the proposed development will increase impervious
areas on the site. The proposed increase in impervious areas has the potential to increase peak flow rates
to the existing drainage system. To mitigate potential increases in flow rates it is planned to detain
stormwater flows on-site and discharge at a mitigated rate to the existing stormwater infrastructure system.


Mitigation of flow is provided by the following volumes:
        Catchment A – Minimum 60kL of on-site detention volume.

A concept drainage layout plan has been included as Appendix A of this report.

Log in to download the original (Approved plan - Site Based Stormwater Management Plan - Job Ref SC-8407 - Revision B - 24 March 2020.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.