Approved plan - Site Based Stormwater Management Plan - Job Ref SC-8407 - Revision B - 24 March 2020

Attached to the e-mail SARA Referral agency response with conditions - MCU20/0027 & RAL20/0004.

of 27

Page text read automatically using OCR, there may be inaccuracies

SC-8407 – 45 Maple Street, Cooroy                                                            11



5.0 Flood Hazard Overlay and External Catchment
The subject site is not affected by regional flooding impacts.




6.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies State and Council planning scheme policies.


        Rainwater harvesting and re-use is adopted to reduce the demand on Council’s existing
         infrastructure;
        Best practice and practical water quality improvement methods;
        60kL of peak flow mitigation volume is required of the development; and
        Formalisation of drainage regimes in accordance with QUDM including inter-allotment drainage
         and dedicated drainage easements.

Log in to download the original (Approved plan - Site Based Stormwater Management Plan - Job Ref SC-8407 - Revision B - 24 March 2020.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.