44 September 2006

RPG Consulting Engineers
PO Box 2112
Noosa Heads QLD 4567

Dear Sir/ Madam

UNDERGROUNDING OF OVERHEAD MAINS - CNR THOMAS ST &
GYMPIE TCE.

Thankyou for your letter dated 11/09/2006, reference (6181rga2) requesting
preliminary costs and conditions for the undergrounding of existing overhead
electricity mains, as detailed on your attached plan.

\ advise your client is required to pay a capital contribution of approximately
$213,400.00 (GST inclusive) to have the construction completed based on
the following:

1. ENERGEX has clear access to our 0-900mm alignment, with no other
services impeding our construction methods.

2. ENERGEX is not responsible for the reinstatement of the footpath. Any
reinstatement costs have not been allowed for in this estimate.

3. If other services require relocation as a result of the intended works, it will
be at your clients cost.

4. The proposed scope of works is UG of existing OH mains, cnr Thomas St
& Gympie Tce, Noosaville, refer to the attached section of mains map.

This cost is preliminary only and is subject to a detailed design and estimate,
management approval and approvals from statutory authorities to complete
the construction. If you wish to proceed, please forward a design fee of
$21,340.00) (including $1,940.00 GST). Please enclose final design
requirements, such as any special streetlight requirements, with the design
fee. An offer to complete the works will be forwarded to you approximately 14
weeks after payment has been received. The design fee is not refundable,
however, will be deducted from the final offer amount.

Note that the offer will not be a fixed cost as actual costs are to apply.

Please note that this information is valid for 60 days only. Construction work
will not be programmed for commencement prior to receipt of final payment.

energex

Enquiries

Col Hall

Telephone

(07) 5470 8427

Facsimite

(07) 5470 8407

Email

[email protected]

Energy Delivery

2 Progress Road
Maroochydore Qld 4658
Telephone (07) 5470 8439
Facsimile (07) 5470 8407

Corporate Office

150 Charlotte Street
Brisbane Qld 4000

GPO Box 1461

Brisbane Qld 4001
Telephone (07) 3407 4000
Facsimile (07) 3407 4609
www.energex.com.au

ENERGEX Limited
ABN 40 078 849 055

Used in these records

About this file

File size
988 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05_1189 - Change to Development Approval Condition - Condition 42 [As Published].pdf · 988 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.