Council archive · source document
Appendix 1 Gateway Drive Code Assessment Ver1 · MCU15/0031
Attached to the e-mail MCU15/0031 & OPW15/0057 Development Application.
MCU to establish Entertainment and Dining Business (Type 1 Food and Beverage)
MCU to establish Industrial Business – Type 2 Production, Alteration, Repackaging and Repairing
2/18 Duke St Sunshine Beach
Lot 11Gateway Drive, Noosaville
Acceptable solutions
Specific Outcomes Proposal Outcomes
(if self-assessable)
or stormwater quality improvement
devices are incorporated into the design
to treat run-off prior to run-off exiting
from the premises.
22 Justification for additional driveways may need to be supported by a detailed Traffic Study. See PSP 1 for details.
Table 14-50 — Carparking and Manoeuvring
Acceptable solutions
Specific Outcomes Proposal Outcomes
(if self-assessable)
14.114 Carpark Design and Layout
O7 Sufficient carparking is provided to S7.1 The number of parking and loading bays Complies – Provision is made
accommodate the number and type of vehicles is not less than the minimum number specified for 16 onsite car parking spaces
likely to be generated by the development in Table 14-51 Vehicle Parking Requirements; which includes a shared
having regard to the specifics of the use disabled space. 8 of the
including— carparking spaces are in
a) the type and intensity of land use; tandem but as this number
b) any existing parking available on the site; meets the staff requirements
c) hours of operation; this operation is considered
d) likely numbers of users; acceptable. A carparking study
e) the peak parking demand periods of uses was undertaken at existing
on the site; and operations on staff numbers,
f) the availability of alternative carparking. vehicle movements relating to
customers and delivery of
products. The proposed
carparking design provides
sufficient carparking to
accommodate the number and
type of vehicles by the
proposed development.
O8 The layout of the development provides S8.1 Parking bays, manoeuvring areas, Complies - Existing parking and
adequate, clearly defined and easily queuing areas, loading, set down and pickup maneuvering areas are clearly
accessible— areas and driveways are designed to the defined
a) on-site vehicle parking and manoeuvring standards set out in Sections 2 and 3 of
areas; and Australian Standard AS 2890.1 Parking
b) loading and manoeuvring areas for delivery Facilities (Part 1: Off-street Carparking) and AS
and service vehicles 2890.2 – Off-street Parking (Part 2:
Commercial Vehicles);
AND Complies – One loading bay is
S8.2 The number of loading bays is not less provided.
than the minimum number specified in Table
14-51.
O9 Parking areas are located where they will S9.1 Carparking areas are accessed from rear Complies - Refer Appendix 3
not unduly conflict with pedestrians and will laneways where practicable. Proposal Plans and Appendix 4,
not dominate the streetscape. SCG Consulting Engineers Plans
for details.
Page 13 of 22
PT010115 VER 1.1 060215
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 1 Gateway Drive Code Assessment Ver1.pdfRelated documentApplication case desk ↗
Appendix 1 Gateway Drive Code Assessment Ver1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.