Council archive · source document
07/0012 - Response to Information Request [As Published] · 132007.12
It is also recommended that warning signage and linemarking be located on the pathway for cyclist to be aware that there are vehicles crossing the path. 3. A review of the proposed carparking arrangement by a suitably qualified traffic engineer, demonstrating that the proposed multilevel carparking structure complies with all relevant aspects of AS2890.1 for Off Street Car Parking with consideration also given fo pedestrian and cyclist movements to the site. The traffic report prepared by TTM reviews the proposed carparking arrangement and confirms that the proposal complies with AS2890.1 for Off Street Car Parking. It is recommended however that mirrors be located within the carpark to improve visibility at ramp junctions. 4. A site plan detailing the proposed located of rainwater tank(s) for the development. Attached plans DAO1D and DAO4D show the location of proposed rainwater tanks. This will comprise a 100001 underground tank between the child care centre and existing stage 2 building and 4 x 8000! tanks at the rear boundary of the site behind the Stage 2 building. 5. Demonstrate that an adequate buffer to mitigate against the potential threat of bushfire is proposed in respect fo adjoining vegetation and that adequafe access is maintained to the rear for fire fighting purposes. In this regard if is also considered that the south-western end of the existing pathway (road reserve) may need fo be increased in size by truncafing the southern corner of proposed Lot 4 (2026m2 - behind the Telstra site) and the western corner of proposed Lot 4 (1.486ha - that contains the existing development}. Similarly the north-eastern end of the existing pathway (road reserve) may need to be increased in size by truncating the eastern corner of proposed Lot 5 (the Telstra site). All truncations shall be 5mx5m to allow fire brigade access. The only change to the current approved building location is the new carpark to the north-west. There are no changed circumstances that warrant any further buffer to potential bushfire threats over and above the current approval. The approved and proposed new carpark buildings have a buffer separation to the adjoining vegetation of 10m. This buffer distance is considered more than adequate and is wider than most fire breaks in many residential situations adjoining more heavily vegetated areas. The provision of truncations at the southern corner of proposed Lot 4 (2026m2 - behind the Telstra site} and the western corner of proposed Lot 4 (1.486ha - that contains the existing development) and the north-eastern end of the existing pathway is not necessary and will not serve any purpose. The existing pathway is not suitably constructed to allow vehicular access. An existing fire hydrant, sign posts, trees and other landscaping, restrict vehicular access along the bike path. The truncations are therefore not appropriate as they will not achieve any improved access provision. Should fire brigade access to the adjoining park area be required this can more appropriately and readily be achieved from the end of Juron Street (to the north of the site) which directly adjoins the park.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.