Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

07/0012 - Response to Information Request [As Published] · 132007.12

of 64

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

tiny

Trettio Parting Acoustics

© 2007 - TTM Consulting (SC) Pty Ltd Project No: 23566rep2

Mixed Medical Office Extension

The minimum parking bays proposed within the car park is 2.4m wide. This width satisfies the
requirements for a User Class 1, which is basically employee parking. It is therefore recommended
that the 2.4m spaces be allocated as staff parking and the balance of the spaces be reserved for
customers / clients. This can be achieved by clear signage and linemarking within the car park.

There are also a series of ramps within the proposed car park. All ramps are one — way only. The
minimum requirement in accordance with AS2890.1 is 3.6m including 300mm clearance to wails. The
minimum width of ramps proposed is 4.0m, which satisfies AS2890.1.

It is noted that there ramps are located adjacent to each other within the car park layout. To avoid
potential conflicts it is recommended that the “inside” ramps be required to Give Way to the ‘outside”
ramp, which will require signage and linemarking. Also, to improve visibility at the top / bottom of the
ramps, it is recommended that mirrors be installed in appropriate locations.

7.3 Car Park Access

As the site does not have any direct road frontage, it is proposed that access be provided via the
existing car park. The development plan proposes the connection between the two basement car
parks at the rear of the site, which requires crossing the newly constructed Bicycle Path which runs
along the western site boundary and which will ultimately form part of a major commuter bike path.

The bicycle path is approximately 2.0m wide at the point of the vehicular crossing. There is
approximately 3.0m clearance between the edge of the pathway and the edge of the buildings on
either side. The connection is a 90 degrees to the bicycle path, therefore the visibility is maximised.

It is recommended that the proposed connection be design to give priority to the cyclists in accordance
with the Figure 3.7 of the Manual of Uniform Traffic Controt Devices, which is contained in the
Appendix. Given the vehicular crossing is within a car park, the signage spacing shown in Figure 3.7
of MUTCD cannot be achieved, therefore appropriate signage will need to be specifically located at
the crossing point to ensure drivers are aware of the crossing.

It is also recommended that warning signage and linemarking be located on the pathway for cyclists to
‘be aware that there are vehicles crossing the path. This will ensure that both vehicular and bicycle
traffic will slow down at the intersection.

 

www.ttmgroup.com.au
a” T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected] Page 13

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0012 - Response to Information Request [As Published].pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.