                              ii.          maintenance of safe pedestrian access for the areas affected by the works during
                                           and after daily construction has ceased
                              iii.         proposed fencing to the site during the construction phase of the development
                              iv.          provision for worker car parking
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      e.      identification of complaint management procedures including:
                              i.           contact details for the on-site manager
                              ii.          dispute resolution procedures
                      f.      details on the location of external fill/dump sites/sources, the haulage route, type of
                              vehicle to be utilised during filling operations and frequency of usage. NB any damage
                              to the existing road system as a result of haulage operations shall be fully repaired at
                              the applicant’s expense
                      g.      it is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor employed
                              to construct the works and a final document will be required to be submitted at the Pre-
                              Start Meeting for the project.
               7.     REFERENCE DOCUMENTS

                Document               Rev. Document Name                                            Date
                No.

                30206(SL)              -        Slope Stability Assessment, prepared by SCG 24 September 2020
                                                Consulting Engineers

               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                        Subject of the required Development Permit

                Development Permit for Operational Works                   Access, External works, Stormwater,
                                                                           Landscaping

                Development Permit for Building Works                      All building work

               11.    SUBMISSIONS

               Not applicable.




                                                                                                             Page 10 of 12
Document Set ID: 21313305
Version: 5, Version Date: 08/12/2020                                                                    Print Date: 8 December 2020, 2:48 PM
Log in to download the original file

approval.pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.