Original source · versioned page text
approval
Noosa Council documents
.
APPROVED PLAN
MCU20/0073
NOOSA COUNCIL
7 December 2020
.
designers
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
Metal Roof
Mobile 0419 758 478
[email protected]
Metal Awning www.kiddco.com.au
This drawing is to be read in
Powder Coated Aluminium conjunction with Engineers Drawings &
Framed Windows Reports
Construction to comply
with all relevant SAA &
Pastel Paint Finish to BCA Codes & standard
Rendered Block Wall Bldg By-law 1975 & as
amended
Powder Coated Aluminium Verify all dimensions on
Framed Balustrade 1.2m High site prior to commencement
of any works. These
Powder Coated Framed drawings are not to be
Aluminium Louvers used for scaling
Copyright for design &
drawings remain the
Powder Coated Aluminium property of the authors.
Framed Bifold Doors
Top of pool 1m above
finished ground level
Project
Proposed 4 Units
Location
15&13 Park Crescent
Sunshine Beach
NORTH ELEVATION Client
Mark Bain
SD.501 SCALE1:100 Drawing Title
NORTH ELEVATION
Scale Date
as shown @A3 Feb 19
Drawn By Job No:
JLK 1802
Drawing No. Issue No.
Document Set ID: 21313327 SD.501 B
Version: 2, Version Date: 08/12/2020 Print Date: 8 December 2020, 2:48 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.