Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Appendix F Coastal development and Tidal Works · MCU20/0090

of 8

Text shows just the words. Original shows the document exactly as it was published.

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                               Acceptable outcomes                               Response




Table 8.2.2: All operational work
  Performance outcomes                                               Acceptable outcomes                               Response
  Private marine development
  PO17 Private marine development does not require the               No acceptable outcome is prescribed.              Not applicable   - extension is for an existing
  construction of coastal protection work, shoreline or                                                                commercial use and is not private marine work
  riverbank hardening or dredging for marine access purposes.
  Disposal of solid waste or dredged material from artificial waterways
  PO18 Solid waste from land and dredged material from               No acceptable outcome is prescribed.              Not applicable – no dredging proposed
  artificial waterways is not disposed of in tidal water unless it
  is for beneficial reuse.
  Disposal of dredged material other than from artificial waterways
  PO19 Dredged material is returned to tidal water where             No acceptable outcome is prescribed.              Not applicable – no dredging proposed.
  this is needed to maintain coastal processes and
  sediment volume.
  PO20 Where it is not needed to maintain coastal                    No acceptable outcome is prescribed.              Not applicable – no dredging proposed
  processes and sediment volume, the quantity of
  dredged material disposed to tidal water is minimised
  through beneficial reuse or disposal on land.
  All dredging and any disposal of dredged material in tidal water
  PO21 All dredging and any disposal of dredged                      No acceptable outcome is prescribed.              Not applicable – no dredging proposed
  material in tidal water is:
                                                                                                                                              Page 6 of 8

Used in these records

About this file

File size
167 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix F Coastal development and Tidal Works.pdf · 167 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.