Original source · versioned page text
Delegated Report - Code - Planning OPW20 0212
Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. OPW20/0212 Applicant Karen Patricia Hill Proposal Operational Works - Vehicle Crossover and Landscaping Properly Made Date 16 November 2020 Information Request Date 14 December 2020 Information Response Date 29 January 2021 Decision Due Date 9 March 2021 Report Completed Date 10 February 2021 Report Reviewed By Diogo Carrico PROPERTY DETAILS Property Address Taraka 93 Oriole Ave Peregian Beach Qld 4573 RP Description BUP 3856 Land Area 521.0000 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban footprint Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Acid Sulfate Soils, Bushfire Assessment Type Code PROPOSAL The application seeks approval for Operational Works - Vehicle Crossover and Landscaping. The locality and proposal plan are included below. Figure 1 – Locality Figure 2 – Driveway Plan Figure 3 – Landscaping Plan <insert plan> Figure 4 – Elevations site details Background The works are required to address a number of conditions in the associated higher order approval DBW20/0007 assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Landscaping Code; Driveways and Parking Code; The application has been found to generally comply with all applicable statutory instruments. cONSULTATION Referral Agencies Not Applicable Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Planning Assessment conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW20/0212 for Operational Works - Vehicle Crossover and Landscaping at Taraka 93 Oriole Ave Peregian Beach Qld 4573 and described as BUP 3856, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW20/0212 Street address: Taraka 93 Oriole Ave Peregian Beach Qld 4573 Real property description: BUP 3856 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Vehicle Crossover and Landscaping CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 20-0680-F1, Sheet 1 A Driveway and Carport Plan prepared by Lindsay Consulting Pty Ltd 29 January 2021 20-0680-F1, Sheet 2 A Slab Plan prepared by Lindsay Consulting Pty Ltd 29 January 2021 Proposed Landscaping and Driveway Plan prepared by Karen Hill Submitted to Council on 29 January 2021 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 9 February 2023, unless an application to extend the currency period is approved by Council. GENERAL CONDITIONS Engineering A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Landscaping works; A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: traffic Management during the construction phase. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) provision for safe pedestrian access across the frontage of the site both. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. Landscape The development site must be landscaped generally in accordance with the approved plans and Noosa Plan 2020 Planning Scheme Policy PSP2 Landscaping for the Coastal Beachfront area. Existing vegetation on site and in Council’s road reserve must be retained, except where required to be removed for construction of the approved carport and access driveway. Trees to be retained must be protected from clearing or construction activities by: clearly marking vegetation to be retained with flagging tape installing protective fencing around the drip line of the vegetation restricting stockpiling, storage and vehicle parking to those areas which are already cleared using low impact construction techniques around vegetation. A minimum of two (2) street trees (minimum 45 litre pot size) are to be provided along the Oriole Avenue Street frontage. The final location of the street trees is to be confirmed with Council officers at the pre-start meeting. Street trees are to be of a species that do not impact on services or Council infrastructure. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. DURING CONSTRUCTION Engineering The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be constructed and work procedure undertaken in accordance with: the approved plans/documents and conditions detailed in this Decision Notice the conditions of the associated higher order approval – DBW20/0007 all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserves No removal of street trees is permitted without Council’s prior written approval. Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Driveways Driveway crossovers must be constructed generally in accordance Council’s Standard Drawings RS-049 and RS-050 Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: the driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients. the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council. any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer. Stormwater Drainage The constructed driveway must not cause additional ponding on the road formation or the road reserve. Environment (Erosion and Sediment Control) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with the relevant standards. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 8 of 9 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.jpeg (image text)] ea 103 seanh227097 141 502P03120 | 139 ser93i20/ 137 500P93120 | 135 57933120 33 2n19 oSe2tige, | oauPaese 613°90120 | 97 7 614P93120 | 99 e10P93120 e15e93124 Orio le Avefiins AvERIIR? Avenue a 609P99120 20 saip93t21 cB 22 e0sP93120 saoP83121 | a4 sa0P9321 78 542P93121 [Attachment: image2.jpeg (image text)] TORMWATER DRAINAGE NOTES Jno exc a EES NECESSARY BEFORE COMMENCING WRK, FOR LOCATING ALL EOSTI 1 STORMWATER CRANAGEPPES SHALE UPVC AE PNMLIMSEWER CLASS) TO AS IGENERAL NOTES (SOME MAY NOT APPLY) ve creo sucvenr We QUENSL BOLING At MEDOVENT ACTA eecamcpe remem cone caer nor ura Tare cova teers cD} ETN NE VEGETATION PROTECTION NOTES vee Oauc ne Sta Se nETD wa SOTARLE RODE COAT _£_ PRPUED AYDEN LE ph. (02 999 Sj STeN9ARDS 2008 (as_Nzy LINDSAY CONSULTING "3, LENT An PROJECT DESCRIPTION TARANKA (C/O. KAREN HILL DRIVEWAY/CARPORT DESION $8 ORIOLE AVENUE PEREGIAN BEACH DRANG THLE DRIVEWAY & CARPORT PLAN SCALES 0 5 al SURVEY DATUM frou =~ ————4 ‘ua =i saw cuts wand Ser at sa 7 FAR CENTRAL ‘ASSOCIATED CONSULTANTS pens [Attachment: image3.jpeg (image text)] | 5 ‘csrmc ava =| saseM = nae AC nt Anocrs aro oneotars ree Puan 2 rae ov denna pao ges rue Passe aneyai 7 SD PCANT CANN exgrno 93 ORIOLE AVE: tipuporee ORIOLE AVE i ‘romwanatet —ReTANNG WALL CONCRETE OR EXPOSED sremavaren \ PROPOSED SITE PLAN SCALE 1:100 PLINTS WL Bs SELECTED BASED ON THOR STREET TREE: CALUSTEMOR POT SE ‘GROUND COVERS SELBCTEO TO PRONE Scrat ‘GREVLLEA BW CORREA ALBA AND Sabon wot ha Cat LA GOLDEN OUT TONS ‘GhULLEN SD, DAMM 93 ORIOLE AVE PEREGIAN BEACH PROPOSED LANDSCAPING AND DRIVEWAY PLAN &
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.