HWD STAKES AS SPECIFIED. MIN
2.No, PER TREE. ENSURE
STAKES ARE FIRMLY SECURED
MIN 600mm INTO GROUND.
50mm WIDE GREEN RECYCLED
TIE AS SPECIFIED
100mm LAYER OF MULCH AS
SPECIFIED. KEEP MULCH CLEAR
FROM TRUNK OF TREE. MULCH
TO BE FLUSH WITH
SURROUNDING MULCH LEVELS:
IN GARDEN BED
BACKFILL TREE PIT WITH
MODIFIED SITE TOPSOIL AS
‘SPECIFIED, FORM SHALLOW
BERM TO TRUNK FOR WATER
RETENTION, TOPSOIL TO
EXTEND MIN 300mm DEEP
THROUGH GARDEN BED AS
SPECIFED
150mm CULTIVATED SUBGRADE
EXCAVATE EACH TREE PIT TO
ALLOW FOR MIN 1m OF SITE
TOPSOIL TO BE INSTALLED,
TREE PIT MUST BE MIN 300
LARGER THAN ROOT BALL ON
ALL SIDES,
CULTIVATE SUBGRADE TO MIN.
= 150mm DEPTH.
i eT Et er
SUBGRADE AS PROFILED BY
CIVIL CONTRACTOR
SCALE 1:20
(4) TYPICAL TREE PLANTING IN GARDEN BED
FOOTPATH AND SUB SURFACE,
AGGREGATE BY CIVIL
CONTRACTOR OR AS
SPECIFIEED, REFER TO
SURFACE FINISHES PLAN,
BACKFILL TREE PIT WITH
MODIFIED SITE TOPSOIL AS
SPECIFIED, FORM SHALLOW
BERM TO TRUNK FOR WATER
RETENTION. TOPSOIL TO
EXTEND MIN 300mm DEEP
THROUGH GARDEN BED AS
‘SPEGIFED
HWD STAKES AS SPECIFIED,
MIN 2No PER TREE. ENSURE
STAKES ARE FIRMLY SECURED
Mik 6OGmm INTO GROUND,
0mm WIDE GREEN RECYCLED
TIE AS SPECIFIEO
100mm LAYER OF MULCH AS
SPECIFIED, KEEP MULCH CLEAR
FROM TRUNK OF TREE. MULCH
TO BE FLUSH WITH
SURROUNDING MULCH LEVELS.
§N GARDEN BED.
KERB BY CIVIL CONTRACTOR
EXCAVATE EACH TREE PIT TO
ALLOW FOR MIN {m3 OF SITE.
TOPSOIL TO BE INSTALLED.
TREE PIT MUST BE MIN 300
LARGER THAN ROOT BALL ON
ALL SIDES,
CULTIVATE SUBGRADE TO MIN,
450mm DEPTH.
SUBGRADE AS PROFILED BY
GIVIL CONTRACTOR
‘SCALE 1:20
(2) TYPICAL TREE ADJACENT PAVEMENT
HWD STAKES AS SPECIFIED. MN, 2 No, PER
TREE, ENSURE STAKES ARE FIRMLY
SECURED MIN 600mm INTO GROUND.
50mm WIDE GREEN RECYCLED TIE AS
SPADE CUT EDGE TO TREE PITS
WHERE SPECIFIED, REFER TO
‘SURFACE FINISHES PLAN
TURF AS SPECIFIED. MIN 100run
TOPSOIL TO TURF AREAS AS
SPECIFIED
SERVICES BY CIVIL
CONTRACTOR
ROOT BARRIER TYPE Rah 1000 AS
SPECIFIED. ROOT BARRIER TO BE
1M DEEP AND SET MIN 300mm
FROM ROOTBALL. INSTALL AS.
PER MANUFACTURERS
SPECIFICATION,
(3 Haris TREE WITH ROOT BARRIER
SCALE 120
SPECIFIED
100mm LAYER OF MULCH AS SPECIFIED.
KEEP MULCH CLEAR FROM TRUNK OF TREE.
MULGH TO BE FLUSH WITH SURROUNDING
MULCH LEVELS tN GARDEN BED,
BACKFILL TREE PIT WITH MODIFIED SITE
TOPSOIL AS SPECIFIED, FORM SHALLOW
BERM TO TRUNK FOR WATER RETENTION,
TOPSOIL TO EXTEND MIN 300mm DEEP
THROUGH GARDEN BED AS SPECIFED
KERB BY CIVIL CONTRACTOR
ROOT BARRIER TYPE ReR 1000 AS SPECIFIED.
ROOT BARRIER TO BE 1M DEEP AND SET MIN
300mm FROM ROOTBALL. INSTALL AS PER
MANUFACTURERS SPECIFICATION.
EXCAVATE EACH TREE PIT TO ALLOW FOR
‘MIN 13 OF SITE TOPSOW TO BE INSTALLED.
TREE PIT MUST BE MIN 300 LARGER THAN
ROOT BALL ON ALL SIDES,
CULTIVATE SUBGRADE TO MIN, 150mm
OEPTH
SUBGRADE AS PROFILED BY CIVIL
CONTRACTOR
LANDSCAPE ARCHITECT
EDAW | AECOM
uve emer
PAT BLD GRRE
SS DURORTH ANE MEOUNE
ARO DONE Dasa erase cust
Tgprones 0 7470448
FORE CUTS
ua
A
BAFe
AAD, 378 mane
CLIENT
Gnature: .....
NOTES
‘SHEET DETAILS
meee em < 7
a
De rot tenia tom we neg
Venly of aevamnion en ls rev Wcorencton,
AD decmenvate tr roe Ft SPN A
"AMENDMENT /ISSUE REGISTER
isewe | Deacrigton Paw Sig
Renan EW aaa
OPERA TOnn WORSE cor
oPeRATOnAL WORGRSE rae
Prema RW eae
TENERBRE feo
Ea aa
PROJECT
VIRIDIAN
STAGE 3
TLE
DETAILS
‘DRAWING INFORMATION
Deere Omen [Om Seam Crecied
Det [x 120200 | 1.200
Prapeee Deareang Ne i
0551 2089.02 |L-DT-901 OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0256 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.